Nfpa 54 2015 Free Download

  1. Nfpa 54 2015 Free Download Windows 7
  2. Nfpa 54 2015 Free Download
  3. Nfpa 54 2015 Free Download For Windows 10
  4. Nfpa 54 2015 free. download full

NFPA 4.3.1 code on air duct materials at InspectApedia.com. National Building Code of Canada (2015) STANDARD by National. /list-of-codes-and-standards/detail?code=54; National Fuel Gas Code, NFPA 54, ANSI Z223.1 (2018).

  1. Jan 5, 2015 - NFPA 54. ANSI Z223.1-1999 National Fuel Gas Code. 1999 Edition. Gas pipe or tubing and fittings shall be clear and free from cutting burrs. For shutting down the burner(s) to prevent boiler steam pressure or boiler.
  2. NFPA 54:NATIONAL FUEL GAS CODE 2015 [National Fire Protection Association] on. Get your Kindle here, or download a FREE Kindle Reading App.
  3. NFPA 54: National Fuel Gas Code, 2015 NFPA Standards are copyright of National Fire Protection Association (NFPA). NFPA Standards are reproduced with NFPA's permission by MADCAD.com. NFPA and the NFPA logos are trademarks and service marks of NFPA.
  4. Time to coordinate all NFPA docu-ments on this point, but the newest edition of NFPA 54 (National Fuel Gas Code), which was approved at the General Session at the annual NFPA World Safety Conference and Expo in Las Vegas on June 4, 2008, will include language to provide clarifica-tion with regard to the required bond-ing.

Nfpa 54 2015 Free Download Windows 7

Free
®
NFPA
59A
Standard for the Production, Storage, and Handling of Liquefied Natural Gas (LNG)
2016
--```,`,```,```,`,`,`,``,-`-`,`,`,`,`---
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from IHS
Licensee=Saudi Licensee=Saudi Arabia-Al Khobar /3219500182, /3219500182, User=Mohammad, Ali khan khan Not for Resale, 02/13/2018 21:49:00 MST
IMPORTANT NOTICES AND DISCLAIMERS CONCERNING NFPA ® STANDARDS NOTICE AND DISCLAIMER OF LIABILITY CONCERNING THE USE OF NFPA STANDARDS
NFPA ® codes, standards, recommended practices, and guides (“NFPA Standards”), of which the document contained herein is one, are developed through a consensus standards development process approved by the American National Standards Institute. This process brings together volunteers representing varied viewpoints and interests to achieve consensus on fire and other safety issues. While the NFPA administers the process and establishes rules to promote fairness in the development of consensus, it does not independently test, evaluate, or verify the accuracy of any information or the soundness of any judgments contained contained in NFPA NFPA Standards. The NFPA disclaims liability for any personal injury, property or other damages of any nature whatsoever, whether special, special, indirect, consequential consequential or compensatory compensatory, directly or indirectly indirectly resulting from from the publication, use of, or reliance on NFPA Standards. The NFPA also makes no guaranty or warranty as to the accuracy or completeness of any informatio information n published herein. In issuing and making NFPA Standards available, the NFPA is not undertaking to render professional or other services for or on behalf of any person or entity entity.. Nor is the NFPA undertaking undertaking to perform per form any duty owed by any person or entity to someone else. Anyone using this document should rely on his or her own independent judgment or, or, as appropriate, seek the advice of a competent professional professional in determining the exercise of reasonable care in any given circumstances. The NFPA has no power, nor does it undertake, to police or enforce compliance with the contents of NFPA Standards. Nor does the NFPA list, certify, test, or inspect products, designs, or installations for compliance with this document. Any certification or other statement of compliance with the requirements of this document shall not be attributable to the NFPA and is solely the responsibility of the certifier or maker of the statement.
See ALERT
ALERT: THIS THIS STANDARD STANDARD HAS BEEN MODIFIED BY BY A TIA OR ERRA ERRATA TA
Users of NFPA codes, standards, recommended practices, and guides (“NFPA Standards”) should be aware that NFPA Standards may be amended from time to time through the issuance of Tentative Interim Amendments or corrected by Errata. An official NFPA Standard at any point in time consists of the current edition of the document together with any Tentative Interim Amendment and any Errata then in effect. In order to determine whether an NFPA Standard has been amended through the issuance of Tentative Interim Amendments or corrected by Errata, visit the “Codes & Standards” section on NFPA’s website. There, the document information pages located at the “List of NFPA Codes & Standards” provide up-to-date, document-specific information including any issued Tentative Interim Amendments and Errata. To view the document information page for a specific NFPA Standard, go to http://www.nfpa.org/docinfo to choose from the list of NFPA Standards or use the search feature to select the NFPA Standard number (e.g., NFPA 101). The document information page includes postings of all existing Tentative Interim Amendments and Errata. It also includes the option to register for an “Alert” feature to receive an automatic email notification notification when new updates and other information are posted regarding the document.
ISBN: 978-145591300-8 (Print) ISBN: 978-145591323-7 (PDF) --```,`,```,```,`,`,`,``,-`-`,`,`,`,`---
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
Licensee=Saudi Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
IMPORTANT NOTICES AND DISCLAIMERS CONCERNING NFPA ® STANDARDS NOTICE AND DISCLAIMER OF LIABILITY CONCERNING THE USE OF NFPA STANDARDS
NFPA ® codes, standards, recommended practices, and guides (“NFPA Standards”), of which the document contained herein is one, are developed through a consensus standards development process approved by the American National Standards Institute. This process brings together volunteers representing varied viewpoints and interests to achieve consensus on fire and other safety issues. While the NFPA administers the process and establishes rules to promote fairness in the development of consensus, it does not independently test, evaluate, or verify the accuracy of any information or the soundness of any judgments contained contained in NFPA NFPA Standards. The NFPA disclaims liability for any personal injury, property or other damages of any nature whatsoever, whether special, special, indirect, consequential consequential or compensatory compensatory, directly or indirectly indirectly resulting from from the publication, use of, or reliance on NFPA Standards. The NFPA also makes no guaranty or warranty as to the accuracy or completeness of any informatio information n published herein. In issuing and making NFPA Standards available, the NFPA is not undertaking to render professional or other services for or on behalf of any person or entity entity.. Nor is the NFPA undertaking undertaking to perform per form any duty owed by any person or entity to someone else. Anyone using this document should rely on his or her own independent judgment or, or, as appropriate, seek the advice of a competent professional professional in determining the exercise of reasonable care in any given circumstances. The NFPA has no power, nor does it undertake, to police or enforce compliance with the contents of NFPA Standards. Nor does the NFPA list, certify, test, or inspect products, designs, or installations for compliance with this document. Any certification or other statement of compliance with the requirements of this document shall not be attributable to the NFPA and is solely the responsibility of the certifier or maker of the statement.
See ALERT
ALERT: THIS THIS STANDARD STANDARD HAS BEEN MODIFIED BY BY A TIA OR ERRA ERRATA TA
Users of NFPA codes, standards, recommended practices, and guides (“NFPA Standards”) should be aware that NFPA Standards may be amended from time to time through the issuance of Tentative Interim Amendments or corrected by Errata. An official NFPA Standard at any point in time consists of the current edition of the document together with any Tentative Interim Amendment and any Errata then in effect. In order to determine whether an NFPA Standard has been amended through the issuance of Tentative Interim Amendments or corrected by Errata, visit the “Codes & Standards” section on NFPA’s website. There, the document information pages located at the “List of NFPA Codes & Standards” provide up-to-date, document-specific information including any issued Tentative Interim Amendments and Errata. To view the document information page for a specific NFPA Standard, go to http://www.nfpa.org/docinfo to choose from the list of NFPA Standards or use the search feature to select the NFPA Standard number (e.g., NFPA 101). The document information page includes postings of all existing Tentative Interim Amendments and Errata. It also includes the option to register for an “Alert” feature to receive an automatic email notification notification when new updates and other information are posted regarding the document.
ISBN: 978-145591300-8 (Print) ISBN: 978-145591323-7 (PDF) --```,`,```,```,`,`,`,``,-`-`,`,`,`,`---
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
Licensee=Saudi Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
®
IMPORTANT NOTICES AND DISCLAIMERS CONCERNING NFPA STANDARDS ADDITIONAL NOTICES AND DISCLAIMERS Updating of NFPA Standards Users of NFPA codes, standards, recommended practices, and guides (“NFPA Standards”) should be aware that these documents may be superseded at any time by the issuance of new editions or may be amended from time to time through the issuance of Tentative Interim Amendments Amendments or corrected by Errata. An of�cial NFPA Standard at any point in time consists of the current edition of the document together with any Tentative Interim Amendments Amendments and any Errata then in effect. In order to determine whether a given document is the current edition and whether it has been amended through the issuance of Tentative Interim Amendments or corrected through the issuance of Errata, consult appropriate NFPA publications publications such as the National Fire Codes® Subscription Service, visit the NFPA website at www.nfp www.nfpa.org, a.org, or contact t he NFPA at the address listed below.
Interpretations of NFPA Standards A statement, written or oral, oral, that is not processed processed in accordance with with Section 6 of the Regulations Regulations Governing the Development of NFPA Standards shall not be considered the of�cial position of NFPA or any of its Committees and shall not be considered to be, nor be relied upon as, a Formal Interpretation.
Patents The NFPA does not take any position with respect to the validity of any patent rights referenced in, related to, or asserted in connection with an NFPA Standard. The users of NFPA Standards bear the sole responsibili responsibility ty for determining the validity of any such patent rights, as well as the risk of infringement of such rights, and the NFPA disclaims liability for the infringement of any patent resulting from the use of or reliance on NFPA Standards. NFPA adheres adheres to the policy of the American National Standards Institute (ANSI) regarding the inclusion of patents in American National Standards (“the ANSI Patent Patent Policy”), and hereby hereby gives the following following notice pursuant pursuant to that policy: NOTICE: The user’s attention is called to the possibility that compliance with an NFPA Standard may require use of an invention covered by patent rights. NFPA takes no position as to the validity of any such patent rights or as t o whether such patent rights constitute or include essential patent claims under the ANSI Patent Policy. If, in connection with the ANSI Patent Policy, a patent holder has �led a statement of willingness to grant licenses under these rights on reasonable and nondiscriminatory nondiscriminato ry terms and conditions to applicants desiring to obtain such a license, copies of such �led statements can be obtained, on request, from NFPA. For further information, contact t he NFPA at the address listed below. below.
Law and Regulations Users of NFPA Standards should consult applicable federal, state, and local laws and regulations. NFPA does not, by the publication of its codes, standards, recommended recommended practices, and guides, intend to urge action that is not in compliance with applicable laws, and these documents may not be construed as doing so.
Copyrights NFPA Standards are copyrighted. They are made available for a wide variety of both public and private uses. These include both use, by reference, in laws and regulations, and use in private self-regulation, self-regulation, standardization, and the promotion of safe practices and methods. By making these documents available for use and adoption by public authorities and private users, the NFPA does not waive any rights in copyright to these documents. Use of NFPA Standards for regulatory purposes should be accomplishe accomplished d through adoption by reference. The term “adoption by reference” means the citing of title, edition, and publishing information only. Any deletions, additions, and changes desired by the adopting authority should be noted separately in the adopting instrument. In order to assist NFPA in following the uses made of its documents, adopting authorities are requested to notify the NFPA (Attention: Secretary, Secretary, Standards Council) in writing of such use. For t echnical assistance and questions concerning adoption of NFPA Standards, contact NFPA at the address below.
For Further Information All questions or or other communications communications relating to NFPA NFPA Standards Standards and all requests for for information on NFPA NFPA procedures governing its codes and standards developme development nt process, including information on the procedure proceduress for requesting Formal Interpretations, for proposing Tentative Interim Amendments, and for proposing revisions to NFPA standards during regular revision cycles, should be sent t o NFPA headquarters, addressed to the attention of the Secretary, Standards Council, NFPA, NFPA, 1 Batterymarch Park, P.O. Box 9101, Quincy, MA 02269-9101; email: [email protected] For more information about NFPA, visit the NFPA website at www.nfpa.org. All NFPA codes and standards can be viewed at no cost at www www.nfpa.org/freeacc .nfpa.org/freeaccess. ess.
--```,`,```,```,`,`,`,``,-`-`,`,`,`,`---
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
Licensee=Saudi Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
59A-1
Copyright © 2015 National Fire Protection Association ®. All Rights Reserved.
NFPA ® 59A Standard for the
Production, Storage, and Handling of Lique�ed Natural Gas (LNG) 2016 Edition Natural Gas This edition of NFPA 59A, Standard for the Production, Storage, and Handling of Lique�ed Natural (LNG) , was prepared by the Technical Technical Committee on Lique�ed Natural Gas. It was issued by the Standards Council on November 14, 2015, with an effective date of December 4, 2015, and supersedes all previous editions.
This document has been amended by one or more Tentative Tentative Interim Amendments (TIAs) and/or Errata. See “Codes & Standards” at www.nfpa.org for more information. This edition of NFPA 59A was approved as an American National Standard on December 4, 2015. Origin and Development of NFPA 59A
A committee of the American Gas Association began work on a standard for lique�ed natural gas circa 1960. In the autumn of 1964, a draft was submitted to NFPA with the request that it be considered as the basis for an NFPA standard. The Sectional Committee on Utility Gas prepared a standard that was adopted tentatively at the 1966 NFPA Annual Meeting at the recommendation of the Committee on Gases. With the formation of the Committee on Fuel Gases in the summer of 1966, the standard was assigned to that committee and its subcommittee on Utility Gas Plants. The �rst �rst of�cial of�cial edition was adopted at the 1967 NFPA Annual Meeting under the sponsorship of the Committee on Fuel Gases. By early 1969, it was apparent that the use of LNG was expanding considerably beyond the utility gas plant applications covered by the 1967 edition. The American Petroleum Institute suggested that one of its standards, PUBL 2510A, Design and Construction of Lique�ed Petroleum Petroleum Gas (LPG) Installations , be used to help develop a standard having a broader scope. The Committee on Lique�ed Natural Gas was established for that purpose. The 1971 edition was the �rst edition edition of NFPA 59A developed under the broadened scope. Subsequent editions were adopted in 1972, 1975, 1979, 1985, 1990, 1994, 1996, and 2001. The 2006 edition included revisions in compliance with the Manual of Style for NFPA Technical Committee Documents . Chapter 5 was revised to cover double and f ull containment LNG storage containers. De�nitions of these types of containers were also added to the standard. Seismic design criteria for LNG containers were revised to correlate with the requirements of ASCE 7, Minimum Design Loads for for Buildings and and Other Structures Structures . Chapter 11 was revised to add requirements for a contingency plan for potential LNG marine transfer incidents. In the 2009 edition, additional vapor dispersion models were allowed where they are evaluated and approved by an independent body using the new Model Evaluation Protocol developed by the NFPA Research Foundation. The Design Spill table was revised to separate the design spill requirements for over-the-top �ll/withdrawal containers, other containers, and process areas. Scope statements were added to each chapter, and the term radiant heat �ux replaced replaced thermal radiation throughout the document. In the 2013 edition, Annex E, Perf ormance-Based Alternative Standard for Plant Siting, was revised and relocated to the mandatory text as new Chapter 15, Performance (Risk Assessment) Based LNG Plant Siting. Use of the per formance-based option required approval of the authority having jurisdiction. The performance-based option required analyzing the risks to persons and property in the area surrounding the proposed LNG plant based on risk mitigation techniques incorporated into the facility design. All of the minimum requirements of earlier chapters of NFPA 59A also had to be met. Chapter 15 provided several tables and �gures to assist a facility designer in identifying those risks and determining if the risks are tolerable, as de�ned in Chapter 15.
NFPA and National Fire Protection Association are registered trademarks of the National Fire Protection Association, Quincy, Massachusetts 02169. Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
Licensee=Saudi Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
` , , ` , ` , , ` , , ` ` , , ` ` , ` , , ` , ` , ` ` ` , , , ` ` ` , ` , , , , ` ` ` -
59A-2
PRODUCTION, STORAGE, AND HANDLING OF LIQUEFIED NATURAL GAS (LNG)
The 2013 edition also incorporated several revisions to promote consistency between NFPA 59A and the Code of Federal Regulations, as well as some new terminology for tank systems. In addition, Chapters 7 and 14 were reorganized for easier use. In the 2016 edition, several de�nitions have been revised to e stablish a hierarchy of components, facilities, and plants. A new de�nition for LNG facility has been added, and the de�nitions for LNG plant and component have been revised to maintain consistency. Subsequent chapters have been revised to correspond to the new de�nitions. Additional changes have been made to improve the �re safe design of outer concrete containers to avoid explosive spalling during a �re event. Revisions have been made to requirements for inspections after repairs, detection of leaks, and post seismic events to provide greater con�dence in the system’s continued safety and integrity. The 2016 edition also incorporates several revisions to enhance the use of Annex A. NFPA documents that were listed in Annex A as informational references in prior editions have been moved into Chapter 12 as enforceable code in order to address the design and installation requirements for �re protection systems. New and revised annex material has been added for numerous sections to provide additional information, guidance, and clari�cation, as well as to point users to reference materials for further guidance.
2016 Edition --```,`,```,```,`,`,`,``,-`-`,`,`,`,`---
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
COMMITTEE PERSONNEL
59A-3
Technical Committee on Lique�ed Natural Gas Jay J. Jablonski, Chair HSB PLC, CT [I] Richard A. Hoffmann, Secretary Hoffmann & Feige, NY [SE] Donald Barber, Enmat International (UK), United Kingdom [SE] Rep. Institute of Gas Engineers/Institute of Energy Denise Beach, FM Global, MA [I] Jeffrey P. Beale, CH-IV International, MD [SE] John M. Blanchard, CB&I, IL [M] Rep. Steel Tank Institute/Steel Plate Fabricators Association Christopher Bourne, Massachusetts Department of Public Utilities, MA [E] Leon A. Bowdoin, Jr., Consultant, MA [SE] Rep. NFPA Industrial Fire Protection Section Jeffrey K. Brightwell, Lake Charles LNG, LA [U] Rep. American Gas Association David T. Butler, City of Everett Fire Department, MA [E] Mark E. Fessenden, Tyco Fire Protection Products, WI [M] James J. Gaughan, American Bureau of Shipping, NY [E] Filippo Gavelli, GexCon U.S., MD [SE] Constantyn Gieskes, Braemar Technical Services (Engineering) Inc., TX [SE] Charles A. Helm, U.S. Department of Transportation, OK [E] Rep. U.S. Department of Transportation Chris E. Humes, Kinder Morgan/Southern LNG & Gulf LNG, GA [U] Rep. Interstate Natural Gas Association of America
Francis J. Katulak, Distrigas of Massachusetts, LLC, MA [U] Nicholas A. Legatos, Preload Incorporated, NY [M] Rep. American Concrete Institute Joel V. Madison, Ebara International Corporation, NV [M] Peter A. Micciche, ConocoPhillips, AK [U] Kenneth L. Paul, Chart Industries, Inc., NH [M] Gilford W. Poe, ExxonMobil Upstreat Research, TX [U] Rep. American Petroleum Institute Phani K. Raj, U.S. Department of Transportation Of�ce of Safety, DC [E] Rep. U.S. Department of Transportation James J. Regan, Starr Technical Risks Agency, Inc., I L [I] Kevin L. Ritz, Baltimore Gas & Electric Company, MD [U] Rep. American Gas Association Thomas V. Rodante, Baker Engineering & Risk Consultants, Inc., TX [SE] Jeffrey H. Sawchuk, BP Corporation, TX [U] Terry L. Turpin, Federal Energy Regulatory Commission, DC [E]
Alternates Jeffery J. Baker, CB&I, IL [M] (Alt. to John M. Blanchard) Leo Campos, American Bureau of Shipping, TX [E] (Alt. to James J. Gaughan) Allan M. Clarke, Duke Energy Corporation, TX [U] (Alt. to Jeffrey K. Brightwell) Pat Convery, Cornerstone Energy Services, MA [U] (Alt. to Leon A. Bowdoin, Jr.) Frank L Del Nogal, BP America Inc., TX [U] (Alt. to Jeffrey H. Sawchuk) Alan D. Hat�eld, Braemar Engineering, TX [SE] (Alt. to Constantyn Gieskes) Stanley T. Kastanas, U.S. Department of Transportation, MA [E] (Alt. to Charles A. Helm) Andrew Kohout, Federal Energy Regulatory Commission, DC [E] (Alt. to Terry L. Turpin)
Bernard W. Leong, Chevron Energy Technology Company, TX [U] (Alt. to Gilford W. Poe) Matt Martineau, Chart Industries, Inc., MN [M] (Alt. to Kenneth L. Paul) Michael Jared Morrison, Starr Technical Risks Agency, Inc., TX [I] (Alt. to James J. Regan) Antonino Nicotra, Bechtel Oil Gas & Chemicals, TX [SE] (Voting Alt.) Davis R. Parsons, BWD Consulting, CA [U] (Alt. to Peter A. Micciche) Arthur Ransome, CH-IV International, MD [SE] (Alt. to Jeffrey P. Beale) Anthony J. Scaraggi, Distrigas of Massachusetts LLC, MA [U] (Alt. to Francis J. Katulak) Gregory J. Schneller, National Grid, NY [U] (Alt. to Kevin L. Ritz) Nonvoting
Swapan Kumar Hazra, GF Natural Gas LNG Ltd/CNG Technology Ltd., India [U]
` ` ` , , , , ` , ` ` ` , , , ` ` ` , ` , ` , , ` , ` ` , , ` ` , , ` , , ` , ` , , ` -
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
James P. Lewis, Jim Lewis LNG Expertise, TX [SE] (Member Emeritus)
2016 Edition
Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
59A-4
PRODUCTION, STORAGE, AND HANDLING OF LIQUEFIED NATURAL GAS (LNG)
Daniel Gorham, NFPA Staff Liaison This list represents the membership at the time the Committee was balloted on the �nal text of this edition. Since that time, changes in the membership may have occurred. A key to classi�cations is found at the back of the document.
NOTE: Membership on a committee shall not in and of itself constitute an endorsement of the Association or any document developed by the committee on which the member serves. Committee Scope: This Committee shall have primary responsibility for documents on safety and related aspects in the liquefaction of natural gas and the transport, storage, vaporization, transfer, and use of lique�ed natural gas.
` , , ` , ` , , ` , , ` ` , , ` ` , ` , , ` , ` , ` ` ` , , , ` ` ` , ` , , , , ` ` ` -
2016 Edition
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
CONTENTS
59A-5
Contents Cha Chapter pter 1 Adm Admini inistr strati ation ............................................ 1.1 Scope. Scope. ........ ............ ........ ........ ........ ........ ....... ....... ........ ........ ........ ........ ........ ........ ........ ........ .... 1.2 Purpos Purpose. e. ........ ............ ........ ........ ........ ........ ........ ........ ........ ........ ....... ....... ........ ........ ....... ... 1.3 Equiva Equivalen lency cy.. ........ ............ ........ ........ ........ ........ ........ ........ ........ ........ ........ ........ ........ ...... 1.4 Retroa Retroacti ctivit vityy. ........ ............ ........ ........ ........ ........ ....... ....... ........ ........ ........ ........ ........ ...... .. 1.5 SI Units. Units. ........... ............... ........ ........ ........ ........ ........ ....... ....... ........ ........ ........ ........ ........ ...... .. 1.6 Pressu Pressure re Measur Measureme ement. nt. ...... .......... ........ ........ ........ ........ ........ ........ ........ ...... 1.7 Refere Reference nced d Standa Standards rds.. .......... .............. ........ ........ ........ ........ ........ ........ ...... ..
59A– 7 59A– 7 59A– 7 59A– 7 59A– 7 59A– 7 59A– 7 59A– 7
Chap Chapte terr 9.1 9.2 9.3 9.4 9.5 9.6 9.7 9.7
Chap Chapte terr 2 Refe Refere renc nced ed Pub Publi lica cati tion onss ............................ 2.1 Genera General. l. ....... ........... ........ ........ ........ ........ ........ ........ ........ ........ ........ ........ ........ ........ ........ ...... 2.2 NFPA NFPA Publi Publicat cation ions. s. ........... ............... ........ ........ ........ ........ ....... ....... ........ ........ .... 2.3 Other Other Public Publicati ations ons.. ........ ............ ........ ........ ........ ........ ........ ........ ........ ........ .... 2.4 Refere Reference ncess for for Extrac Extracts ts in in Mand Mandato atory ry Sect Section ions. s. ..............................................................................
59A– 7 59A– 7 59A– 8 59A– 8
9.8 9.9 9.10 9.11
Chapter 3 De�nitions ................................................... 3.1 Genera General. l. ....... ........... ........ ........ ........ ........ ........ ........ ........ ........ ........ ........ ........ ........ ........ ...... 3.2 NFPA Of�cial De�nitions. .................................. 3.3 General De�nitions. ............................................
59A– 9 59A– 9 59A– 9 59A– 9
Chap Chapte terr 4 Gene Genera rall Requ Requir irem emen ents ts ............................... 4.1 Scope. Scope. ........ ............ ........ ........ ........ ........ ....... ....... ........ ........ ........ ........ ........ ........ ........ ........ .... 4.2 Corros Corrosion ion Cont Control rol Over Overvie view w. ........ ............ ........ ........ ........ ........ ...... .. 4.3 Contro Controll Center Center.. ........ ............ ........ ........ ........ ........ ........ ........ ........ ........ ........ ........ .... 4.4 Source Sourcess of Power Power.. ........... ............... ........ ........ ........ ........ ........ ........ ....... ....... ....... ... 4.5 Record Rec ords. s. ........ ............ ........ ........ ........ ........ ........ ........ ........ ....... ....... ........ ........ ........ ........ ...... 4.6 Noncom Noncombus bustib tible le Mater Material ial.. ......... ............. ........ ........ ........ ........ ........ ...... 4.7 Igniti Ignition on Source Source Cont Control rol.. ......... ............. ........ ........ ........ ........ ........ ........ ....
59A– 11 59A– 11 59A– 11 59A– 11 59A– 11 59A– 11 59A– 11 59A– 11
5 Plan Plantt Sit Sitin ing g and and Layo Layout ut ............................... Scope. Scope. ........ ............ ........ ........ ........ ........ ....... ....... ........ ........ ........ ........ ........ ........ ........ ........ .... Plant Plant Site Site Provisi Provisions ons.. .......... .............. ........ ........ ........ ........ ....... ....... ........ ...... .. Site Site Provi Provisio sions ns for for Spil Spilll and and Leak Leak Cont Control rol.. ....... ......... Build Building ingss and Struc Structur tures. es. ....... ........... ........ ........ ........ ........ ........ ........ ...... Design Designer er and Fabric Fabricato atorr Comp Compete etence nce.. ...... ......... ....... ...... Soil Soil Prot Protect ection ion for Cryoge Cryogenic nic Equipm Equipmen ent. t. ..... ........ ... Fallin Falling g Ice and Snow Snow.. ......... ............. ........ ........ ........ ........ ........ ........ ........ ...... .. Concre Concrete te Design Design and and Materi Material als. s. ........ ............ ........ ........ ........ .... Portab Portable le LNG Facil Facility ity.. .......... .............. ........ ........ ........ ........ ........ ........ ....... ...
59A– 12 59A– 12 59A– 12 59A– 12 59A– 17 59A– 17 59A– 18 59A– 18 59A– 18 59A– 18
Cha Chapter pter 6 Proces ocesss Equ Equiipme pment ..................................... 6.1 Scope. Scope. ........ ............ ........ ........ ........ ........ ....... ....... ........ ........ ........ ........ ........ ........ ........ ........ .... 6.2 Instal Installat lation ion of of Proce Process ss Equi Equipme pment. nt. ........ ............ ........ ........ ...... 6.3 Pumps Pumps and and Comp Compres ressor sors. s. ....... .......... ....... ........ ........ ........ ........ ........ ...... .. 6.4 Flamma Flammable ble Refrig Refrigera erant nt and and Flam Flammab mable le Liqui Liquid d Storage. ................................................................ 6.5 Proces Processs Equipme Equipment. nt. ....... ........... ....... ....... ........ ........ ........ ........ ........ ........ ....... ...
59A– 19 59A– 19 59A– 19 59A– 19
Chap Chapte terr 7 Stat Statio iona nary ry LNG LNG Sto Stora rage ge ............................. 7.1 Scope. Scope. ........ ............ ........ ........ ........ ........ ....... ....... ........ ........ ........ ........ ........ ........ ........ ........ .... 7.2 Genera General. l. ....... ........... ........ ........ ........ ........ ........ ........ ........ ........ ........ ........ ........ ........ ........ ...... 7.3 Design Design Cons Conside iderat ration ions. s. ......... ............. ........ ........ ........ ........ ........ ........ ...... .. 7.4 Tank ank System Systems. s. ........ ............ ........ ........ ........ ........ ........ ........ ........ ........ ........ ........ ....... ... 7.5 ASME ASME Contai Container nerss Desi Designe gned d for Operat Operation ion at More Than 15 psi (103 kPa). ..............................
59A– 20 59A– 20 59A– 20 59A– 20 59A– 23
Chap Chapte terr 8 Vapor aporiz izat atio ion n Faci Facili liti ties es ................................. 8.1 Scope. Scope. ........ ............ ........ ........ ........ ........ ....... ....... ........ ........ ........ ........ ........ ........ ........ ........ .... 8.2 Classi�cation of Vaporizers. ................................ 8.3 Design Design and Materi Materials als of Cons Constru tructi ction. on. ........ ............ ...... .. 8.4 Vapor Vaporize izerr Pipin Piping, g, Inte Interme rmedia diate te Flu Fluid id Piping Piping, and Storage Valves. .............................................. 8.5 Relief Relief Devi Devices ces on on Vap Vapori orizer zers. s. ....... ........... ........ ........ ........ ........ ....... ... 8.6 Combus Combustio tion n Air Supp Supply ly.. ......... ............. ........ ........ ........ ........ ........ ........ ...... 8.7 Produ Products cts of of Combu Combusti stion. on. ..... ......... ........ ........ ........ ........ ........ ........ ....... ...
59A– 28 59A– 28 59A– 28 59A– 28
` ` ` , , , , ` , ` ` ` , , , ` ` ` , ` , ` , , ` , ` ` , , ` ` , , ` , , ` , ` , , ` -
Chap Chapte terr 5.1 5.2 5.3 5.4 5.5 5.6 5.7 5.8 5.9
59A– 9
59A– 19 59A– 19
59A– 26
59A– 28 59A– 29 59A– 29 59A– 29
9 Pipi Piping ng Syst System emss and and Comp Compon onen ents ts ............... Scope Scope.. ........ ............ ........ ........ ........ ........ ........ ........ ........ ........ ........ ........ ........ ....... ....... ........ .... Genera General. l. ........ ............ ........ ........ ........ ........ ........ ....... ....... ........ ........ ........ ........ ........ ........ ...... Materi Material alss of Const Construc ructio tion. n. ....... ........... ........ ........ ........ ........ ........ ....... ... Instal Installa latio tion. n. ........ ............ ........ ........ ........ ........ ........ ........ ........ ........ ........ ........ ........ ...... .. Pipe Pipe Suppor Supports. ts. ......... ............. ........ ........ ........ ........ ........ ........ ........ ........ ........ ........ ...... Piping Identi�cation. .......................................... Insp Inspec ecti tion on, Exami Examina nati tion on, and Tes Testi ting ng of Piping. ................................................................. Purgi Purging ng of Pipi Piping ng Syste Systems. ms. ...... .......... ........ ........ ........ ........ ........ ........ .... Safety Safety and and Relief Relief Valv Valves. es. ....... ........... ........ ........ ........ ........ ........ ........ ....... ... Corrosion Corrosion Control. Control. ................. .......................... .................. .................. ........... .. Cryogenic Cryogenic Pipe-in-P Pipe-in-Pipe ipe Systems. Systems. ................. ......................... ........
59A– 29 59A– 29 59A– 29 59A– 29 59A– 30 59A– 31 59A– 32
Chapte Chapterr 10 Instrum Instrument entati ation on and and Electr Electrica icall Service Servicess .... 10.1 Scope. Scope. .................. ........................... .................. .................. .................. ................. ............. ..... 10.2 Liquid Liquid Level Gauging. Gauging. .................. ........................... .................. .............. ..... 10.3 Pressure Pressure Gauging. Gauging. .................. ........................... .................. .................. ............ ... 10.4 Vacuum Vacuum Gauging. Gauging. .................. ........................... .................. .................. ............ ... 10.5 Temperatu emperature re Indicator Indicators. s. .................. ........................... .................. ........... 10.6 Emergency Emergency Shutdown Shutdown.. .................. ........................... .................. ............. .... 10.7 Electrica Electricall Equipmen Equipment. t. .................. ........................... .................. ............... ...... 10.8 Electrica Electricall Groundin Grounding g and Bonding. Bonding. .................. ....................
59A– 34 59A– 34 59A– 34 59A– 34 59A– 34 59A– 34 59A– 34 59A– 34 59A– 37
Chapte Chapterr 11
11.1 11.2 11.3 11.4 11.5 11.6 11.7 11.8 11.9
Transfe ransferr Systems Systems for for LNG, Refr Refrige igera rants nts, and Other Flammable Fluids ..................... Scope. Scope. .................. ........................... .................. .................. .................. ................. ............. ..... General General Requireme Requirements. nts. .................. ........................... .................. ............ ... Piping Piping System. System. .................. ........................... .................. .................. .................. ......... Pump and Compresso Compressorr Control. Control. .................. ........................ ...... Marine Marine Shipping Shipping and Receiving Receiving.. .......... ................... .............. ..... Tank Vehicl Vehiclee and and Tank Tank Car Loading Loading and Unloading Facilities. ............................................ Pipeline Pipeline Shipping Shipping and Receiving Receiving.. ............ ..................... ........... Hoses and Arms. ................. .......................... .................. .................. ............... ...... Communica Communications tions and Lighting Lighting.. ................. .......................... .........
59A– 32 59A– 33 59A– 33 59A– 33 59A– 33
Chapte Chapterr 12 Fire Fire Protec Protectio tion, n, Safet Safetyy, and Secur Security ity ......... 12.1 Scope. Scope. .................. ........................... .................. .................. .................. ................. ............. ..... 12.2 General. General. .................. ........................... ................. ................. .................. .................. ........... .. 12.3 12.3 Emerge Emergency ncy Shutdo Shutdown wn (ESD) (ESD) Systems. Systems. ........ ............ ....... ... 12.4 Gas, Fire, Fire, and and Leak Detection. Detection. .................. ........................... ......... 12.5 Fire Protectio Protection n Water Water Systems. Systems. .................. ........................... ......... 12.6 12.6 Fire Fire Exting Extinguis uishin hing g and Othe Otherr Fire Fire Contro Controll Equipment. .......................................................... 12.7 Maintena Maintenance nce of Fire Fire Protection Protection Equipmen Equipment. t. ..... 12.8 Personnel Personnel Safety Safety.. .................. ........................... .................. .................. .............. ..... 12.9 Security Security.. ................. .......................... .................. .................. .................. .................. ........... ..
59A– 38 59A– 39 59A– 39 59A– 39 59A– 39 59A– 39 59A– 39 59A– 40 59A– 40 59A– 40 59A– 40 59A– 41 59A– 41 59A– 41
Chapte Chapterr 13
13.1 13.2 13.3 13.4 13.5 13.6 13.7 13.8 13.9 13.10 13.11 13.12 13.13 13.14 13.15
Requi Require remen ments ts for Stat Station ionary ary Applic Applicati ations ons Using ASME Containers ............................. Scope. Scope. .................. ........................... .................. .................. .................. ................. ............. ..... General General Requireme Requirements. nts. .................. ........................... .................. ............ ... Containe Containers. rs. .................. ........................... .................. .................. .................. .............. ..... Containe Containerr Filling. Filling. .................. ........................... .................. .................. ............ ... Containe Containerr Foundati Foundations ons and Supports. Supports. ............... ............... Containe Containerr Installat Installation. ion. ................. .......................... .................. .............. ..... Automatic Automatic Product Product Retention Retention Valves. Valves. ................. ................. LNG Spill Spill Containm Containment. ent. ................. .......................... .................. ........... .. Inspection Inspection.. .................. ........................... .................. ................. ................. ............... ...... Shop Testin Testing g of LNG Containers Containers.. ...................... ...................... Shipment Shipment of LNG LNG Container Containers. s. .................. ........................... ........... Field Field Testing Testing of LNG Contain Containers. ers. ................. ....................... ...... Weldin Welding g on Container Containers. s. ....................... ................................ ............... ...... Piping. Piping. .................. ........................... .................. .................. ................. ................. ............. .... Containe Containerr Instrumentati Instrumentation. on. ....................... ................................ .........
59A– 37 59A– 37 59A– 37 59A– 37 59A– 37 59A– 38
59A– 41 59A– 41 59A– 41 59A– 41 59A– 42 59A– 42 59A– 43 59A– 43 59A– 44 59A– 44 59A– 44 59A– 44 59A– 44 59A– 44 59A– 44 59A– 45
2016 Edition
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
Licensee=Saudi Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
PRODUCTION, PRODUCTIO N, STORAGE, AND HANDLING OF LIQUEFIED NATURAL GAS (LNG)
59A-6
13.16 Fire Protecti Protection on and Safety. Safety. ............... ........................ .................. ........... 59A– 45 13.17 Gas Detection. Detection. ................... ............................ .................. .................. ................. ........ 59A– 45 13.18 Operation Operationss and Maintenance Maintenance.. ....................... ............................ ..... 59A– 45 Chapte Chapterr 14
Operat Operating ing, Mainte Maintenan nance, ce, and and Person Personnel nel Training ...................................................... 14.1 Scope. Scope. ................. .......................... .................. .................. .................. .................. .............. ..... 14.2 General General Requiremen Requirements. ts. ................. .......................... .................. ............. .... 14.3 Manual Manual of Operatin Operating g Procedure Procedures. s. .................. ...................... .... 14.4 Emergenc Emergencyy Procedur Procedures. es. .................. ........................... .................. ........... .. 14.5 Monitorin Monitoring g Operation Operations. s. .................. ........................... .................. ........... .. 14.6 Transfer ransfer of LNG and Flammabl Flammables. es. ................. ..................... .... 14.7 Maintena Maintenance nce Manual. Manual. .................. ........................... .................. ............... ...... 14.8 Maintena Maintenance. nce. .................. ........................... .................. .................. .................. ........... 14.9 Personne Personnell Training. raining. ................. .......................... .................. .................. ........... 14.10 Records. Records. ................. .......................... .................. .................. .................. .................. ........... ..
Perform Performanc ance e (Risk (Risk Asse Assessm ssment ent)) Based Based LNG Plant Siting ......................................... 15.1 Scope. Scope. ................. .......................... .................. .................. .................. .................. .............. ..... 15.2 General General Requiremen Requirements. ts. .......... ................... .................. .................. ........... 15.3 De�nitions. ..........................................................
59A– 48 59A– 48 59A– 48 59A– 48 59A– 48 59A– 49 59A– 49 59A– 51 59A– 52 59A– 53 59A– 54
Chapte Chapterr 15
` ` ` , , , , ` , ` ` ` , , , ` ` ` , ` , ` , , ` , ` ` , , ` ` , , ` , , ` , ` , , ` -
59A– 54 59A– 54 59A– 54 59A– 54
15.4 15.5 15.5
Risk Calculat Calculations ions and Basis Basis of Assessment. Assessment. ........ LNG and and Other Other Haza Hazard rdous ous Mater Material ialss Release Release Scenarios. ............................................................. 15.6 15.6 Releas Releasee Probab Probabili ilitie tiess and Cond Conditi itiona onall Probabilities. ....................................................... 15.7 15.7 Enviro Environme nmenta ntall Conditi Conditions ons and and Occurre Occurrence nce Probabilities. ........................................................ 15.8 Hazard Hazard and Consequen Consequence ce Assessment Assessment.. .............. .............. 15.9 Risk Result Result Presenta Presentation. tion. .................. ........................... .................. ........... 15.10 Risk Tolerab Tolerability ility Criteria. Criteria. ..................... .............................. ............... ...... 15.11 Risk Mitigation Mitigation Approach Approaches. es. .................... ............................. ........... ..
59A– 54
Annex A
Explanatory Material ..................................
59A– 58
Annex B
Seismic Design of LNG Plants Plants ...................
59A– 66
Annex C
Security ........................................................
59A– 67
Annex D
Training Training .......................................................
59A– 68
Annex E
Informational References References ..........................
59A– 69
Index
.....................................................................
59A– 72
2016 Edition
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
Licensee=Saudi Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
59A– 55 59A– 55 59A– 55 59A– 56 59A– 57 59A– 57 59A– 57
REFERENCED PUBLICATIONS
1.2 Purpose. The purpose of this standard is to provide mini‐ mum �re protection, safety, and related requirements for the location, design, construction, security, operation, and mainte‐ nance of LNG plants.
NFPA 59A Standard for the
Production, Storage, and Handling of Lique�ed Natural Gas (LNG) 2016 Edition
IMPORTANT NOTE: This NFPA document is made available for use subject to important notices and legal disclaimers. These notices and disclaimers appear in all publications containing this document and may be found under the heading “Important Notices and Disclaimers Concerning NFPA Standards.” They can also be viewed at www.nfpa.org/disclaimers or obtained on request f rom NFPA. UPDATES, ALERTS, AND FUTURE EDITIONS: New editions of NFPA codes, standards, recommended practices, and guides (i.e., NFPA Standards) are released on scheduled revision cycles. This edition may be superseded by a later one, or it may be amended outside of its scheduled revision cycle through the issuance of Tenta‐ tive Interim Amen d d ments ments (TIAs). An of�cial NFPA NFPA Standard at any point in time consists of the current edition of the document, together with all TIAs and Errata in effect. To verify that this document is the current edition or to determine if it has been amended by TIAs or Errata, please consult the National Fire Codes ® Subscription Service or the “List of NFPA Codes & Standards” at www.nfpa.org/docinfo. In addition to TIAs and Errata, the document information pages also include the option to sign up for alerts for individual documents and to be involved in the development of the next edition. NOTICE: An asterisk (*) following the number or letter designating a paragraph indicates that explanatory material on the paragraph can be found in Annex A. A reference in brackets [ ] following a section or paragraph indicates material that has been extracted from another NFPA document. As an aid to the user, the complete title and edition of the source documents for extracts in mandatory sections of the document are given in Chapter 2 and those for extracts in informational sections are given in Annex E. Extracted text may be edited for consistency and style and may include the revision of internal paragraph references and other references as appropriate. Requests for interpretations or revisions of extracted text shall be sent to the technical committee respon‐ sible for the source document. Information on referenced publications can be found in Chapter 2 and Annex E.
Chapter 1 Administration 1.1* Scope.
apply to the following: 1.1.1 This standard shall apply (1) Facili Facilitie tiess that that liquef liquefyy natura naturall gas gas (2) Faci Facilitie litiess that store, store, vapori vaporize, ze, transfer transfer, and handle handle liqu lique‐ e‐ �ed natural gas (LNG) (3) The train training ing of all all person personnel nel invol involved ved with LNG (4) The desig design, n, locatio location, n, constr constructio uction, n, mainten maintenance, ance, and operation of all LNG facilities
1.3* Equivalency. Nothing in in this standard is intended to prevent the use of systems, methods, or devices of equivalent or superior quality, strength, �re resistance, effectiveness, durabil‐ ity, and safety over those prescribed by this standard.
documentation shall be submitted to the 1.3.1 Technical documentation authority having jurisdiction to demonstrate equivalency. 1.3.2 The system, method, or device shall be approved for the intended purpose by the authority having jurisdiction.
this standard standard re�ect a 1.4 Retroactivity. The provisions of this consensus of what is necessary to provide an acceptable degree of protection from the hazards addressed in this standard at the time the standard was issued. 1.4.1 Unless otherwise speci�ed, the provisions of this stand‐ ard shall not apply to facilities, equipment, structures, or instal‐ lations that exist exist ed ed or were approved for construction or installation prior to the effective date of the standard. Where speci�ed, the provisions of this standard shall be retroactive.
cases where the authority having jurisdiction 1.4.2 In those cases determines that the existing situation presents an unacceptable degree of risk, the authority having jurisdiction shall be permit‐ ted to apply retroactively any portions of this standard deemed appropriate. 1.4.3 The retroactive requirements of this standard shall be permitted to be modi�ed if their application clearly would be impractical in the judgment of the authority having jurisdic‐ tion, and only where it is clearly evident that a reasonable degree of safety is provided. 1.5* SI Units. SI units in this standard shall be based on IEEE/ASTM SI 10, American National Standard for Use of the Inter‐ national System of Units (SI): The Modern Metric System .
customary units and SI units on a 1.5.1 Alternate usage of U.S. customary single project shall not be used to lessen clearance distances. this 1.6 Pressure Measurement. All pressures expressed in this document are gauge pressures unless speci�cally noted other‐ wise. 1.7 Referenced Standards. Reference is is made to both U.S. and Canadian standards, because this standard is prepared for use in both the United States and Canada, as well as in other countries.
is adopted, the adoption shall 1.7.1 Where this standard is include a statement of which U.S. or Canadian reference stand‐ ards shall be used. 1.7.2 If no such statement is made, the user shall use either all available U.S. or all available Canadian reference standards. 1.7.3 If other reference standards are to be used, it shall be so stated.
1.1.2 This standard shall not apply to the following:
(1) (1) (2) (3)
59A-7
Frozen Froz en gro groun und d cont contai aine ners rs Portable Porta ble storage storage contai containers ners stored stored or used used in build buildings ings All LNG LNG vehicular vehicular appl applicati ications, ons, includi including ng fueling fueling of LNG vehicles
Chapter 2 Referenced Publications 2.1 General. The documents or portions thereof listed in this chapter are referenced within this standard and shall be considered part of the requirements of this document. 2016 Edition
--```,`,```,```,`,`,`,``,-`-`,`,`,`,`---
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
Licensee=Saudi Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
59A-8
PRODUCTION, PRODUCTIO N, STORAGE, AND HANDLING OF LIQUEFIED NATURAL GAS (LNG)
2.2 NFPA Publications. National Fire Protection Association, 1 Batterymarch Park, Quincy Quincy, MA 02169-7471.
NFPA 10, Standard for Portable Fire Extinguishers, 2013 edition. NFPA 11, Standard for Low-, Medium-, and High-Expansion Foam, 2016 edition. NFPA 12, Standard on Carbon Dioxide Extinguishing Systems, 2015 edition. NFPA 12A, Standard on Halon 1301 Fire Extinguishing Systems, 2015 edition. NFPA 13, Standar Standard d for the Installation of Sprinkler Systems, 2016 edition. NFPA 14, Standard for the Installation of Standpipe and Hose Systems, 2016 edition. NFPA 15, Standard for Water Spray Fixed Systems for Fire Protec‐ tion, 2016 edition. NFPA 16, Standard for the Installation of Foam-Water Sprinkler and Foam-Water Spray Systems, 2015 edition. NFPA 17, Standar Standard d for Dry Chemical Extinguishing Extinguishing Systems, 2013 edition. Standard d for the Installation of Stationary Pumps for NFPA 20, Standar Fire Protection, Protection, 2016 edition. NFPA 22, Standard for Water Tanks for Private Fire Protection, 2013 edition. NFPA 24, Standar Standard d for the Installation of Private Fire Service Mains and Their Appurtenances, 2016 edition. NFPA 25, Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems, 2014 edition. NFPA 30, Flammable and Combustible Combustible Liquids Liquids Code, 2015 edition. Standard d for the Installation and Use of Stationary NFPA 37, Standar Combustion Engines and Gas Turbines, 2015 edition. NFPA 51B, Standard for Fire Prevention During Welding, Cutting, and Other Hot Work, 2014 edition. NFPA 54, National Fuel Gas Code, 2015 edition. NFPA 58, Lique�ed Petroleum Petroleum Gas Code, 2014 edition. NFPA 59, Utility LP-Gas Plant Code, 2015 edition. NFPA 68, Standar Standard d on Explosion Protection by De�agration Vent‐ Vent‐ ing, 2013 edition. NFPA 70 ® , National Electrical Code ® , 2014 edition. NFPA 72 ® , National Fire Alarm and Signaling Code, 2016 edition. NFPA 101® , Life Safety Code ® , 2015 edition. NFPA 110, Standar Standard d for Emergency and Standby Power Systems, 2016 edition. NFPA 274, Standard Test Method to Evaluate Fire Performance Characteristics Character istics of Pipe Insulation, 2013 edition. NFPA 385, Standard for Tank Vehicles for Flammable and Combus‐ tible Liquids, 2012 edition. NFPA 496, Purged and Pressurized Enclosures for Electrical Equip‐ ment, 2013 edition. NFPA 600, Standard on Fire Brigades, 2015 edition. NFPA 750, Standard on Water Mist Fire Protection Systems, 2015 edition. NFPA 1221, Standard for the Installation, Maintenance, and Use of Emergency Services Ser vices Communications Systems, 2016 edition. NFPA 1901, Standard for Automotive Fire Apparatus, 2016 edition. NFPA 1961, Standard on Fire Hose, 2013 edition. NFPA 1962, Standard for the Care, Use, Inspection, Service Test‐ ing, and Replacement of Fire Hose, Couplings, Nozzles, and Fire Hose Appliances,2013 edition.
NFPA 1963, Standard for Fire Hose Connections, 2014 edition. NFPA 2001, Standard on Clean Agent Fire Extinguishing Systems, 2015 edition. NFPA 5000 ® , Building Construction and Safety Code ® , 2015 edition. Fire Protection Research Foundation, “Evaluating Vapor Dispersion Models Models for Safety Analysis Analysis of LNG Facilities,” 2007 edition. 2.3 Other Publications.
Institute, P.O. P.O. 2.3.1 ACI Publications. American Concrete Institute, Box 9094, Farmington Hills, MI 48333. ACI 304R, Guide for Measuring, Mixing, Transportation and Placing of Concrete , 2000. ACI 318, Building Code Requirements for Structural Concrete and Commentary, 2011. ACI 350, Code Requirements for Environmental Engineering Concrete Structures , 2006. ACI 376, Code Requirements for Design and Construction of Concrete Structures for the Containment of Refrigerated Lique�ed Gases, 2010. 2.3.2 ALPEMA Publications. Brazed Aluminum Plate-Fin Heat Exchanger Manufacturer's Association, IHS (secretariat), 321 Inverness Drive South, Englewood, CO 80112. The Standards of the Brazed Aluminum Plate-Fin Heat Exchanger Manufacturer's Association , 3rd Edition, 2012.
1220 L 2.3.3 API Publications. American Petroleum Institute, 1220 Street, NW, Washington, DC 20005-4070. API 6D, Speci�cation for Pipeline Valves, 2007 with errata 1-6 (2011) and addendums 1, 2 (2011), and 3 (2012). API 620, Design and Construction of Large, Welded, Low-Pressure Storage Tanks, 2008, 11th edition, including 2009, 2010, and 2012 addendums. API 625, Tank Systems for Refrigerated Lique�ed Gas Storage, 2010, with addendum 1, July 1, 2013 API 2510, Design and Construction of Lique�ed Petroleum Gas (LPG) Installations Installations, 2001. 2.3.4 ASCE Publications. American Society of Civil Engineers, 1801 Alexander Bell Drive, Reston, VA 20191-4400.
ASCE 7, Minimum Design Loads for Buildings and Other Struc‐ tures, 2010. 2.3.5 ASME Publications. American Society of Mechanical Engineers, Two Park Avenue, New York, NY 10016-5990. Boiler and Pressure Vessel Code, 2013.
ASME B 31.3, Process Piping, 2012. ASME B 31.5, Refrigeration Piping, 2013. ASME B 31.8, Gas Transmission and Distribution Piping Systems, 2012. 2.3.6 ASTM Publications. ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959.
2016 Edition
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
Licensee=Saudi Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
` , , ` , ` , , ` , , ` ` , , ` ` , ` , , ` , ` , ` ` ` , , , ` ` ` , ` , , , , ` ` ` -
DEFINITIONS
59A-9
ASTM E84, Standard Test Method for Surface Burning Character‐ istics of Building Materials , 2012.
TNO, “Guidelines for Quantitative Risk Assessment, RIVM, The Purple Book,” Netherlands, 2005.
ASTM E136, Standard Test Method for Behavior of Materials in a Vertical Tube Furnace at 750°C, 2012.
2.4 References for Extracts in Mandatory Sections.
ASTM E2652, Standard Test Method for Behavior of Materials in a Tube Furnace with a Cone-shaped Air�ow Stabilizer, at 750°C, 2012.
NFPA 52, Vehicular Gaseous Fuel Systems Code, 2016 edition. NFPA 54, National Fuel Gas Code, 2015 edition. NFPA 101® , Life Safety Code ® , 2015 edition.
2.3.7 CGA Publications. Compressed Gas Association, 14501 George Carter Way, Suite 103, Chantilly, VA 20151-2923.
CGA 341, Standard for Insulated Cargo Tank Speci�cation for Cryogenic Liquids, 2007. CGA S-1.3, Pressure Relief Device Standards — Part 3 — Compressed Gas Storage Containers, 2008. 2.3.8 CSA Publications. Canadian Standards Association, 5060 Spectrum Way, Mississauga, ON, L4W 5N6, Canada.
CSA B51, Boiler, Pressure Vessel and Pressure Piping Code, 2009. CSA C22.1, Canadian Electrical Code, 2012. 2.3.9 IEEE Publications. IEEE, Three Park Avenue, 17th Floor, New York, NY 10016-5997.
IEEE/ASTM SI 10, American National Standard for Use of the International System of Units (SI): The Modern Metric System, 2010. 2.3.10 NACE Publications. NACE International, 1440 South Creek Drive, Houston, TX 77084-4906.
NACE SP 0169, Control of External Corrosion of Underground or Submerged Metallic Piping Systems, 2007. 2.3.11 UL Publications. Underwriters Laboratories, Inc., 333 P�ngsten Road, Northbrook, IL 60062–2096.
ANSI/UL 723, Standard for Test for Surface Burning Characteris‐ tics of Building Materials , 2008. 2.3.12 Other Publications.
American Institute of Chemical Engineers (AIChE) Center for Chemical Process Safety (CCPS), “Guidelines for Chemical Process Quantitative Risk Analysis,” G-42, 2000 edition. ASNT SNT-TC-IA, Personnel Quali�cation and Certi�cation in Nondestructive Testing, 2011. CEB Bulletin 187, Concrete Structures Under Impact and Impul‐ sive Loading, International Federation for Structural Concrete, Switzerland, 1988. EN 14620, Design and manufacture of site built, vertical, cylindri‐ cal, �at-bottomed, steel tanks for the storage of refrigerated, lique�ed gases with operating temperatures between 0°C and −165°C , Parts 1–5, 2006. European Norm Standard, BSI EN 31010:2010, “Risk Management–Risk Assessment Techniques.” Health and Safety Executive (HSE), “Risk Criteria for Landuse Planning in the Vicinity of Major Industrial Hazards,” HMSO, HSE 1989 and “Five Steps to Risk Assessment,” INDC 163, rev. 1, HSE 1998, United Kingdom. Merriam-Webster’s Collegiate Dictionary , 11th edition, Merriam Webster, Inc., Spring�eld, MA, 2003.
Chapter 3 De�nitions 3.1 General. The de�nitions contained in this chapter shall apply to the terms used in this standard. Where terms are not de�ned in this chapter or within another chapter, they shall be de�ned using their ordinarily accepted meanings within the context in which they are used. Merriam-Webster’s Collegiate Dictionary , 11th edition, shall be the source for the ordinarily accepted meaning. 3.2 NFPA Of�cial De�nitions. 3.2.1* Approved. Acceptable to the authority having jurisdic‐ tion. 3.2.2* Authority Having Jurisdiction (AHJ). An organization, of�ce, or individual responsible for enforcing the requirements of a code or standard, or for approving equipment, materials, an installation, or a procedure. 3.2.3 Shall. Indicates a mandatory requirement. 3.2.4 Should. Indicates a recommendation or that which is advised but not required. 3.2.5 Standard. An NFPA Standard, the main text of which contains only mandatory provisions using the word “shall” to indicate requirements and that is in a form generally suitable for mandatory reference by another standard or code or for adoption into law. Nonmandatory provisions are not to be considered a part of the requirements of a standard and shall be located in an appendix, annex, footnote, informational note, or other means as permitted in the NFPA Manuals of Style. When used in a generic sense, such as in the phrase “standards development process” or “standards development activities,” the term “standards” includes all NFPA Standards, including Codes, Standards, Recommended Practices, and Guides. 3.3 General De�nitions. 3.3.1 Bunkering. The loading of a ship's bunker or tank with fuel for use in connection with propulsion or auxiliary equip‐ ment. 3.3.2 Cargo Tank Vehicle. A tank truck or trailer designed to transport liquid cargo. 3.3.3 Component. A part or a system of parts that functions as a unit in an LNG facility and could include, but is not limited to, piping, processing equipment, containers, control devices, impounding systems, electrical systems, security devices, �re control equipment, and communication equipment. 3.3.4 Container.
` , , ` , ` , , ` , , ` ` , , ` ` , ` , , ` , ` , ` ` ` , , , ` ` ` , ` , , , , ` ` ` -
3.3.4.1 Frozen Ground Container. A container in which the maximum liquid level is below the normal surrounding grade, that is constructed essentially of natural materials, such as earth and rock, that is dependent on the freezing of water-saturated earth materials, and that has appropriate 2016 Edition
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
PRODUCTION, STORAGE, AND HANDLING OF LIQUEFIED NATURAL GAS (LNG)
59A-10
methods for maintaining its tightness or that is impervious by nature. 3.3.4.2 Prestressed Concrete Container. A concrete container where the concrete is placed into compression by internal or external tendons or by external wire wrapping. 3.3.4.3 Tank System. Low pressure (less than 15 psi) equip‐ ment designed for the purpose of storing lique�ed natural gas consisting of one or more containers, together with vari‐ ous accessories, appurtenances, and insulation. 3.3.4.3.1* Double Containment Tank System. A single containment tank system surrounded by and within 20 ft (6 m) of a containment wall (secondary container) that is open to the atmosphere and designed to contain LNG in the event of a spill from the primary or inner container. 3.3.4.3.2* Full Containment Tank System. A tank system container in which the inner (primary) container is self standing and is surrounded by a separate self-standing secondary container designed to contain LNG in the event of a spill from the inner container, and the secondary container is enclosed by a steel or concrete roof designed such that excess vapor caused by a spill of LNG from the primary container will discharge through the relief valves. 3.3.4.3.3* Membrane Containment Tank System. A tank system consisting of a thin metal liquid barrier and loadbearing thermal insulation supported by a self-standing outer concrete container jointly forming an integrated composite tank structure designed to contain liquid and vapor during tank operation as well as LNG in the event of leakage from the liquid barrier, and where the vaporcontaining roof of the outer container is either steel or concrete con�gured such that the excess vapor caused by a spill of LNG from the liquid barrier will discharge through the relief valves. 3.3.4.3.4* Single Containment Tank System. A single wall container or a double wall tank system in which only the self-supporting primary or inner container is designed to contain LNG. 3.3.5 Controllable Emergency. An emergency where operator action can minimize harm to people or property. 3.3.6 Design Pressure. The pressure used in the design of equipment, a container, or a pressure vessel for the purpose of determining the minimum allowable thickness or physical char‐ acteristics of its parts. 3.3.7 Dike. A structure used to establish an impounding area or containment. [52, 2016] 3.3.8* Engineering Design. Documentation governing the speci�cation and design of components and systems within an LNG facility. 3.3.9 Fail-safe. A design feature that provides for the mainte‐ nance of safe operating conditions in the event of a malfunc‐ tion of control devices or an interruption of an e nergy source. 3.3.10* Fire Protection. Fire prevention, �re detection, and �re suppression. ` ` ` , , , , ` , ` ` ` , , , ` ` ` , ` , ` , , ` , ` ` , , ` ` , , ` , , ` , ` , , ` -
3.3.11 Fired Equipment. Any equipment in which the combustion of fuels takes place.
3.3.12 Flame Spread Index. A number obtained according to ASTM E84, Standard Test Method for Surface Burning Characteris‐ tics of Building Materials , or ANSI/UL 723, Standard for Test for Surface Burning Characteristics of Building Materials . 3.3.13 Hazardous Fluid. toxic, or corrosive.
A liquid or gas that is �ammable,
3.3.14 Impounding Area. An area de�ned through the use of dikes or the site topography for the purpose of containing any accidental spill of LNG or �ammable refrigerants. 3.3.15 Lique�ed Natural Gas (LNG). A �uid in the cryogenic liquid state that is composed predominantly of methane and that can contain minor quantities of ethane, propane, nitro‐ gen, and other components normally found in natural gas. 3.3.16* LNG Facility. A collection of components used to produce, store, vaporize, transfer, or handle LNG. 3.3.17 LNG Plant. An LNG facility or collection of LNG facili‐ ties functioning as a unit. 3.3.18 Maximum Allowable Working Pressure (MAWP). The maximum gauge pressure permissible at the top of completed equipment, a container, or a vessel in its operating position for a design temperature. 3.3.19 Model. A mathematical characterization intended to predict a physical phenomenon. 3.3.20 Noncombustible Material. See Section 4.6. [ 101, 2015]. 3.3.21 Out-of-Service. The deactivation of a component for any purpose, including repairs or inspections. 3.3.22 Over�lling. design liquid level.
Filling to a level above the maximum
3.3.23 Pipe Insulation Assembly. The set of materials used for insulation of pipes, including the insulation, outer jacket, vapor barrier and lap-seal adhesives. 3.3.24 Pressure Relief Device. A device designed to open to prevent a rise of internal pressure in excess of a speci�ed value due to emergency or abnormal conditions. 3.3.25 Sources of Ignition. Appliances or equipment that, because of their intended modes of use or operation, are capa‐ ble of providing suf�cient thermal energy to ignite �ammable gas–air mixtures. [ 54, 2015] 3.3.26 Tank Vehicle. See 3.3.2, Cargo Tank Vehicle. 3.3.27* Transfer Area. The portion of a lique�ed natural gas (LNG) plant containing a piping system where LNG, �amma‐ ble liquids, or �ammable refrigerants are introduced into or removed from the plant or where piping connections are connected or disconnected routinely. 3.3.28 Transition Joint. A connector fabricated of two or more metals used t o effectively join piping sections of two different materials that are not amenable to the usual welding or joining techniques. 3.3.29* Vacuum-Jacketed. A method of construction that incorporates an outer shell designed to maintain a vacuum in the annular space bet ween the inner container or piping and outer shell.
2016 Edition
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
GENERAL REQUIREMENTS
3.3.30* Vaporizer. 3.3.30.1 Ambient Vaporizer. A vaporizer that derives its heat from naturally occurring heat sources, such as the atmos‐ phere, seawater, or geothermal waters. 3.3.30.2 Heated Vaporizer. A vaporizer that derives heat for vaporization from the combustion of fuel, electric power, or waste heat, such as from boilers or internal combustion engines. [52, 2016] 3.3.30.2.1 Integral Heated Vaporizer. A vaporizer, including submerged combustion vaporizers, in which the heat source is integral to the actual vaporizing exchanger. [ 52, 2013] 3.3.30.2.2 Remote Heated Vaporizer. A heated vaporizer in which the primary heat source is separated from the actual vaporizing exchanger, and an intermediate �uid (e.g., water, steam, isopentane, glycol) is used as the heat transport medium. 3.3.30.3 Process Vaporizer. A vaporizer that derives its heat from another thermodynamic or chemical process to utilize the refrigeration of the LNG. 3.3.31 Water Capacity. The amount of water at 60°F (16°C) required to �ll a container. [52, 2016] Chapter 4 General Requirements 4.1 Scope. This chapter covers the general requirements for facilities covered under this standard. 4.2 Corrosion Control Overview. 4.2.1 Components shall not be constructed, repaired, replaced, or signi�cantly altered until a quali�ed person reviews the applicable design drawings and materials speci�ca‐ tions from a corrosion control viewpoint and determines that the materials involved will not impair the safety or reliability of the component or any associated components. 4.2.2 The repair, replacement, or signi�cant alteration of components shall be reviewed only if the action to be taken involves or is due to one of the following:
(1) A change in the original materials speci�ed (2) A failure caused by corrosion (3) An inspection that reveals a signi�cant deterioration of the component due to corrosion 4.3 Control Center. 4.3.1 Each LNG plant, other than those complying with Chap‐ ter 13, shall have a control center from which operations and warning devices are monitored as required by Section 4.3.
59A-11
control center that has personnel in attendance or the facility has an automatic emergency shutdown system. (4) If more than one is located at an LNG plant, each control center shall have more than one means of communica‐ tion with every other center. (5) It shall have a means of communicating a warning of hazardous conditions to other locations within the plant frequented by personnel. 4.4 Sources of Power. 4.4.1 Electrical control systems, means of communication, emergency lighting, and �re-�ghting systems shall have at least two sources of power that function so that failure of one source does not affect the capability of the other source. 4.4.2 Where auxiliary generators are used as a second source of electrical power, the following shall apply:
(1) They shall be located apart from or be protected from components so that they are not unusable during a controllable emergency. (2) The fuel supply shall be protected from hazards. (3) Where installed, emergency and/or standby power systems shall be installed in accordance with NFPA 110. 4.5 Records. 4.5.1 Each plant shall have a record of materials of construc‐ tion for components, buildings, foundations, and support systems used for containment of LNG and �ammable �uids. 4.5.2 The records shall verify that the material properties meet the requirements of this standard. 4.5.3 The records shall be maintained for the life of the components, buildings, foundations, and support systems. 4.6* Noncombustible Material. A material that complies with any of the following shall be considered a noncombustible material:
(1)* In the form in which it is used and under the conditions anticipated, it will not ignite, burn, support combustion, or release �ammable vapors when subjected to �re or heat. (2) It passes the noncombustible criterion of ASTM E136, Standard Test Method for Behavior of Materials in a Vertical Tube Furnace at 750°C . (3) It passes the noncombustible criterion of ASTM E136 when tested in accordance with the test method and procedure in ASTM E2652, Standard Test Method for Behav‐ ior of Materials in a Tube Furnace with a Cone-shaped Air�ow Stabilizer, at 750°C . 4.7 Ignition Source Control.
4.3.2 A control center shall have the following capabilities and characteristics:
4.7.1 Smoking shall be permitted only in designated and signposted areas.
(1)
4.7.2 Welding, cutting, and hot work shall be conducted in accordance with the provisions of NFPA 51B.
(2) (3)
It shall be located apart from or be protected from other components so that it is operational during a controllable emergency. Each remotely actuated control system and each auto‐ matic shutdown control system required by this standard shall be operable from the control center. It shall have personnel in attendance while any of the components under its control are in operation, unless either the control is being performed from another
2016 Edition
--```,`,```,```,`,`,`,``,-`-`,`,`,`,`---
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
PRODUCTION, STORAGE, AND HANDLING OF LIQUEFIED NATURAL GAS (LNG)
59A-12
4.7.3 Portable electric tools and extension lights capable of igniting LNG or other �ammable �uids shall not be permitted within classi�ed areas except where the area has been identi‐ �ed as free of �ammable �uids. 4.7.4 Vehicles and other mobile equipment that constitute potential ignition sources shall be prohibited within diked areas or within 50 ft (15 m) of containers that contain LNG or other �ammable �uids, except where authorized and at load‐ ing or unloading at facilities speci�cally designed for the purpose. Chapter 5 Plant Siting and Layout 5.1 Scope. This chapter presents the criteria for plant and equipment siting. 5.2* Plant Site Provisions. 5.2.1 A written site evaluation addressing the following factors shall be prepared and made available to the authority having jurisdiction upon request:
(1) (2) (3) (4) (5)
Potential incidents and mitigating measures Adjacent activities Severe weather patterns over a 100-year period Other natural hazards Security
5.3.1.2 The following areas shall be graded, drained, or provi‐ ded with impoundment in a manner that minimizes the possi‐ bility of accidental spills and leaks that could endanger important structures, equipment, or adjoining property or that could reach waterways:
(1) (2) (3)
Process areas Vaporization areas Transfer areas for LNG, �ammable refrigerants, and �am‐ mable liquids (4) Areas immediately surrounding �ammable refrigerant and �ammable liquid storage tanks 5.3.1.3 If impounding areas also are required in order to comply with 5.2.3, such areas shall be in accordance with 5.3.2 and 5.3.3. 5.3.1.4 The provisions of 5.2.3, 5.3.1.1, and 5.3.1.2 that apply to adjoining property or waterways shall be permitted to be waived or altered at the discretion of the authority having juris‐ diction where the change does not constitute a distinct hazard to life or property or con�ict with applicable federal, state, and local (national, provincial, and local) regulations. 5.3.1.5 Flammable liquid and �ammable refrigerant storage tanks shall not be located within an LNG container impound‐ ing area.
5.2.2 All-weather accessibility to the plant for personnel safety and �re protection shall be provided except where provisions for personnel safety and �re protection are provided on the site in accordance with Chapter 12. 5.2.3 Site preparation shall include provisions for retention of spilled LNG, �ammable refrigerants, and �ammable liquids within the limit s of plant property and for surface water drain‐ age. 5.2.4* Soil and general investigations of the site shall be made to determine the design basis for the facility. 5.3 Site Provisions for Spill and Leak Control. 5.3.1 General. 5.3.1.1 Provisions shall be made to minimize the potential of accidental discharge of LNG at containers, pipelines contain‐ ing LNG, and other equipment such that a discharge from any of these does not endanger adjoining property or important process equipment and structures or reach waterways. LNG containers shall be provided with one of the following methods to contain any release:
(1) An impounding area surrounding the container(s) that is formed by a natural barrier, dike, impounding wall, or combination thereof complying with 5.3.2 and 5.3.3 (2) An impounding area formed by a natural barrier, dike, excavation, impounding wall, or combination thereof complying with 5.3.2 and 5.3.3, plus a natural or manmade drainage system surrounding the container(s) that complies with 5.3.2 and 5.3.3 (3) Where the container is constructed below or partially below the surrounding grade, an impounding area formed by excavation complying with 5.3.2 and 5.3.3 (4) Secondary containment as required for double, full, or membrane containment tank systems complying with 5.3.2 and 5.3.3.
5.3.2 Impounding Area and Drainage System Design and Capacity. 5.3.2.1 Impounding areas serving one LNG container shall have a minimum volumetric holding capacity, V , that is one of the following:
(1)
V = 110 percent of the maximum liquid capacity of the container (2) V = 100 percent where the impoundment is designed to withstand the dynamic surge in the event of catastrophic failure of the container (3) V = 100 percent where the height of the impoundment is equal to or greater than the container maximum liquid level 5.3.2.2 Impounding areas serving multiple LNG containers shall have a minimum volumetric holding capacity, V , in accordance with one of the following:
(1) (2)
V = 100 percent of the maximum liquid capacity of all containers in the impoundment area V = 110 percent of the maximum liquid capacity of the largest container in the impoundment area, where provi‐ sions are made to prevent leakage from any container due to exposure to a �re, low temperature, or both due to a leak from or �re on any other container in the shared impoundment
5.3.2.3 Enclosed drainage channels for LNG shall be prohibi‐ ted except where they are used to rapidly conduct spilled LNG away from critical areas and they are sized for the anticipated liquid �ow and vapor formation rates. 5.3.2.4 Where enclosed container down comers are used to rapidly conduct spilled LNG away from critical areas, they shall be sized for the anticipated liquid �ow and vapor formation rates. 5.3.2.5* Dikes and impounding walls shall meet the following requirements:
2016 Edition --```,`,```,```,`,`,`,``,-`-`,`,`,`,`---
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
PLANT SITING AND LAYOUT
(1)
(2)
Dikes, impounding walls, drainage systems, and any pene‐ trations thereof shall be designed to withstand the full hydrostatic head of impounded LNG or �ammable refrig‐ erant, the effect of rapid cooling to the temperature of the liquid to be con�ned, any anticipated �re exposure, and natural forces, such as earthquakes, wind, and rain. Where the outer shell of a tank system complies with the requirements of 5.3.1.1, the dike shall be either the outer shell or as speci�ed in 5.3.1.1.
5.3.2.6 Double containment tank systems shall be designed and constructed such that in the case of a spill and secondary container �re, the secondary container wall will contain the LNG for the duration of the �re. 5.3.2.7 Double, full, and membrane containment tank systems shall be designed and constructed such that in the case of a �re in an adjacent tank, the secondary container shall retain suf�‐ cient structural integrity to prevent collapse, which can cause damage to and leakage from the primary container. 5.3.2.8 Double, full, and membrane containment tank systems shall have no pipe penetrations below the liquid level. 5.3.2.9 Dikes, impounding walls, and drainage channels for �ammable liquid containment shall conform to NFPA 30. 5.3.2.10 Insulation systems used for impounding surfaces shall be, in the installed condition, noncombustible and suitable for the intended service, considering the anticipated thermal and mechanical stresses and loads. If �otation of the insulation can compromise its intended purpose, mitigating measures shall be provided. 5.3.2.11 The dike or impounding wall height and the distance from containers operating at 15 psi (103 kPa) or less shall be determined in accordance with Figure 5.3.2.11. 5.3.2.12 Water Removal. 5.3.2.12.1 Impoundment areas shall be constructed such that all areas drain completely to prevent water collection. Maximum liquid level
59A-13
(A) Drainage pumps and piping shall be provided to prevent water from collecting in the impoundment area. (B) Impounding systems shall have sump pumps and piping running over the dike to remove water collecting in the sump basin. 5.3.2.12.2 The water removal system shall have capacity to remove water at a minimum of 25 percent of the rate from a storm of a 10-year frequency and 1-hour duration, except if the design of the dike does not allow the entrance of rainfall. 5.3.2.12.3 Sump pumps for water removal shall be as follows:
(1) Operated as necessary to keep the impounding space as dry as practical (2) If sump pumps are designed for automatic operation, have redundant automatic shutdown controls to prevent operation when LNG is present 5.3.3 Impounding Area Siting. 5.3.3.1 The provisions of Section 5.3 shall not apply to impounding areas that serve only transfer areas at the water's edge of marine terminals. 5.3.3.2 The maximum radiant heat �ux from a �re shall not exceed the limits listed in Table 5.3.3.2. 5.3.3.3* The use of passive �re mitigation techniques in the calculation of radiant heat distances shall be subject to the approval of the AHJ. 5.3.3.4* The distances to the radiant heat �ux levels of Table 5.3.3.2 shall be calculated in accordance with a model that complies with all of the following:
(1) Takes into account the physical phenomena observed in, and has been validated with the data obtained from, avail‐ able LNG �re experimental data, published in peerreviewed scienti�c literature applicable to the physical situation considered (2) Has been published in peer-reviewed scienti�c literature (3) Has a scienti�c assessment verifying the details of the physics, analysis, and execution process (4) Has been approved 5.3.3.5 Models employed in 5.3.3.4 shall incorporate the following:
Y
Y
Container X
` ` ` , , , , ` , ` ` ` , , , ` ` ` , ` , ` , , ` , ` ` , , ` ` , , ` , , ` , ` , , ` -
X
Dike or impounding wall
Notes: • X is the distance from the inner wall of the container to the closest face of the dike or impounding wall. • Y is the distance from the maximum liquid level in the container to the top of the dike or impounding wall. • X equals or exceeds the sum of Y plus the equivalent head in LNG of the pressure in t he vapor space above the liquid. Exception: When the height of the dike or impounding wall is equal to or greater than the maximum liquid level, X has any value.
FIGURE 5.3.2.11 Containers.
Dike or Impoundment Wall Proximity to
(1) In calculating exclusion distances, the wind speed producing the maximum exclusion distances shall be used except for wind speeds that occur less than 5 percent of the time based on recorded data for the area. (2) In calculating exclusion distances, the ambient tempera‐ ture and relative humidity that produce the maximum exclusion distances shall be used except for values that occur less than 5 percent of the time, based on recorded data for the area. 5.3.3.6* The spacing of an LNG impoundment to the prop‐ erty line that can be built upon shall be such that, in the event of an LNG spill as speci�ed in 5.3.3.7, a predicted concentra‐ tion of methane in air of 50 percent of the lower �ammability limit (LFL) does not extend beyond the property line that can be built upon, in accordance with a model that is acceptable for use by the authority having jurisdiction that has been evalu‐ ated by an independent body using the Model Evaluation Protocol facilities published by the Fire Protection Research
2016 Edition
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
PRODUCTION, STORAGE, AND HANDLING OF LIQUEFIED NATURAL GAS (LNG)
59A-14
Table 5.3.3.2 Radiant Heat Flux Limits to Property Lines and Occupancies Radiant Heat Flux Btu/hr/ft 2
1,600 1,600
3,000
10,000
a
W/m2
5,000 5,000
9,000
30,000
Exposure
A property line at ground level that can be built upon for ignition of a design spill a The nearest point located outside the owner's property line at ground level that, at the time of plant siting, is used for outdoor assembly by groups of 50 or more persons for a �re in an impounding area b The nearest point on the building or structure outside the owner's property line that is in existence at the time of plant siting and used for assembly, educational, health care, detention and correction, or residential occupancies for a �re in an impounding area b,c A property line at ground level that can be built upon for a �re over an impounding areab
See 5.3.3.7 for design spill. The requirements for impounding areas are located in 5.3.2. c See NFPA 101 or NFPA 5000 for de�nitions of occupancies. b
` ` ` , , , , ` , ` ` ` , , , ` ` ` , ` , ` , , ` , ` ` , , ` ` , , ` , , ` , ` , , ` -
Foundation report “Evaluating Vapor Dispersion Models for Safety Analysis of LNG Facilities.” (1) The computed distances shall include calculations based on one of the following: (a)
The combination of wind speed and atmospheric stability that can occur simultaneously and result in the longest predictable downwind dispersion distance that is exceeded less than 10 percent of the time (b) The Pasquill-Gifford atmospheric stability, Category F, with a 4.5 mph (2 m/sec) wind speed (2) The computed distances shall be based on the actual liquid characteristics and the maximum vapor out�ow rate from the vapor containment volume (the vapor generation rate plus the displacement due to liquid in�ow). (3) The effects of provisions for detaining vapor or otherwise mitigating �ammable vapor hazards (e.g., impounding surface insulation, water curtains, or other methods) shall be permitted to be considered in the calculation where acceptable to the authority having jurisdiction. (4) Where provisions for detaining vapor or mitigating �am‐ mable vapor hazards are used, such as impounding surface insulation, water curtains, or other methods, they shall be approved. 5.3.3.7 The design spill shall be determined in accordance with Table 5.3.3.7. 5.3.3.8 LNG container impounding areas shall be located so that the heat �ux from a �re over the impounding area shall
not cause major structural damage to any LNG marine carrier that could prevent its movement. 5.3.3.9 Containers with an aggregate storage of 70,000 gal (265 m3) or less on one site shall be installed either in accord‐ ance with 5.3.3 or in accordance with Table 5.3.4.1 where all connections are equipped with automatic fail-safe valves designed to close under any of the following conditions:
(1) (2)
Fire detection Excess �ow of LNG from the container, as measured by loss of line pressure or other means (3) Gas detection (4) Manual operation from both a local and a remote loca‐ tion (A) The appurtenances shall be installed as close to the container as practical and so that a break resulting from exter‐ nal strain occurs on the piping side of the appurtenance while retaining intact the valve and piping on the container side of the appurtenance. (B) Connections used only for �ow into the container shall be equipped with an automatic fail-safe valve or with two back�ow check valves. (C) Automatic fail-safe valves shall not be required for connec‐ tions for relief valves and instrument valves. (D) The type, quantity, and location of the detection devices shall be in accordance with the requirements of Chapter 12. 5.3.3.10 The distance from the nearest edge of impounded liquid to a property line that can be built upon or from the near edge of a navigable waterway as de�ned by federal regula‐ tions shall not be less than 50 ft (15 m). 5.3.4 Container Spacing. 5.3.4.1 The minimum separation distance between any type of LNG container of 70,000 gal (265 m 3) water capacity or less, single containment constructed LNG containers of greater than 70,000 gal (265 m 3) water capacity, or tanks containing �ammable refrigerants and exposures shall be in accordance with Table 5.3.4.1 or with the approval of the authority having jurisdiction at a shorter distance from buildings or walls constructed of concrete or masonry but at least 10 ft (3.0 m) from any building openings. 5.3.4.2 Double, full, and membrane containment tank systems of greater than 70,000 gal (265 m 3) water capacity shall be separated from adjacent LNG storage containers such that a �re in an adjacent single or double containment impound‐ ment or from a design spill will not cause loss of containment from adjacent containers. This shall be accomplished by ensur‐ ing that no part of the adjacent storage container roof, walls, or its impoundment structure reaches a temperature at which the strength of the material of the container roof, wall, or its impoundment is reduced to a level where the LNG tank, roof, or impoundment loses its structural integrity. The application of engineering analyses shall be used to determine this temper‐ ature by including the following conditions in the analyses:
(1) The analyses shall be performed for a �re involving the complete loss of containment of the primary liquid container to an impoundment area that complies with the requirements of 5.3.2.1
2016 Edition
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
PLANT SITING AND LAYOUT
59A-15
Table 5.3.3.7 Design Spill Design Spill Source
Design Spill Criteria
Design Spill Rate and Volume
Containers with Penetrations Below the Liquid Level
Containers with penetrations below the liquid level without internal shutoff valves
Containers with penetrations below the liquid level with internal shutoff valves in accordance with 9.4.2.5
A spill through an assumed opening at, and equal in area to, that penetration below the liquid level resulting in the largest �ow from an initially full container If more than one container in the impounding area, use the container with the largest �ow
Use the following formula:
The �ow through an assumed opening at, and equal in area to, that penetration below the liquid level that could result in the largest �ow from an initially full container
Use the following formula:
q
4 =
d 2 h
until the differential head acting on the opening is 0. For SI units, use the following formula: q
3
1.06 =
d 2 h
until the differential head acting on the opening is 0.
q
10,000
4 =
3
d 2 h
For SI units, use the following
formula: q
1.06 =
10,000
d 2 h
for 10 minutes.
Containers with Over-the-Top Fill, with No Penetrations Below the Liquid Level
Full or double containment containers with concrete secondary containers
No design spill
None
The largest �ow from any single line that could be pumped into the impounding area with the container withdrawal pump(s) considered to be delivering the fullrated capacity
The largest �ow from any single line that could be pumped into the impounding area with the container withdrawal pump(s) delivering the full rated capacity as follows:
LNG Process Facilities
Containers with over-the-top �ll, with no penetrations below the liquid level
Impounding areas serving only vaporization, process, or LNG transfer areas
The �ow from any single accidental leakage source
(1) For 10 minutes if surveillance and shutdown is demonstrated and approved by the authority having jurisdiction (2) For the time needed to empty a full container where surveillance and shutdown is not approved For 10 minutes or for a shorter time based on demonstrable surveillance and shutdown provisions acceptable to the authority having jurisdiction
Note: q = �ow rate [ft 3/min (m3/min)] of liquid; d = diameter [in. (mm)] of tank penetration below the liquid level; h = height [ft (m)] of liquid above penetration in the container when the container is full.
(2) The analyses shall account for the following: (a)
The duration of the �re, the radiant heat emission characteristics of the �re, and the physical attributes of the �re under the anticipated atmospheric condi‐ tions (b) The atmospheric conditions producing the maxi‐ mum separation distances shall be used except for conditions that occur less than 5 percent of the time based on recorded data for the area and using a LNG �re model in accordance with 5.3.3.4 (c) Active or passive systems to reduce thermal heat �ux incident on the surface or to limit the surface temperature
(d) The materials, design, and methods of construction of the target LNG tank being analyzed 5.3.4.2.1 The outer concrete container shall be designed for the external �re in accordance with ACI 376, Code Requirements for Design and Construction of Concrete Structures for the Contain‐ ment of Refrigerated Lique�ed Gases , unless �re protection meas‐ ures are provided. The outer tank thermal analysis shall be performed to determine temperature distribution for the heat �ux and duration of exposure as speci�ed in the �re risk assess‐ ment within API 625, Tank Systems for Refrigerated Lique�ed Gas Storage .
2016 Edition --```,`,```,```,`,`,`,``,-`-`,`,`,`,`---
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
PRODUCTION, STORAGE, AND HANDLING OF LIQUEFIED NATURAL GAS (LNG)
59A-16
Table 5.3.4.1 Distances from Containers and Exposures
Container Water Capacity m3
gal
<125* 125–500 501–2,000 2,001–18,000 18,001–30,000 30,001–70,000 >70,000
<0.5 ≥0.5–1.9 ≥1.9–7.6 ≥7.6–63 ≥63–114 ≥114–265 >265
Minimum Distance from Edge of Impoundment or Container Drainage System to Property Lines That Can Be Built Upon ft
Minimum Distance Between Storage Containers
m
0 0 10 3 15 4.6 25 7.6 50 15 75 23 0.7 times the container diameter but not less than 100 ft (30 m)
ft
m
0 3 5 5 5
0 1 1.5 1.5 1.5
1
∕ 4 of the sum of the diameters of adjacent containers [5 ft (1.5 m) minimum]
*If the aggregate water capacity of a multiple container installation is 501 gal (1.9 m3) or greater, the minimum distance must comply with the appropriate portion of this table, applying the aggregate capacity rather than the capacity per container. If more than one installation is made, each installation must be separated from any other installation by at least 25 ft (7.6 m). Do not apply minimum distances between adjacent containers to such installation.
(A) The applicable load components and the ultimate state load factors for the �re load combinations shall be in accord‐ ance with ACI 376, Code Requirements for Design and Construction of Concrete Structures for the Containment of Refrigerated Lique�ed Gases , Table 7.3. For membrane tanks, an additional liquid pressure load in accordance with ACI 376, Table 7.2, shall be included. ` ` ` , , , , ` , ` ` ` , , , ` ` ` , ` , ` , , ` , ` ` , , ` ` , , ` , , ` , ` , , ` -
(B) The design of the outer concrete container shall take into account the following factors:
(1) Reduction in the wall post-tensioning due to the differ‐ ence in the coef�cient of thermal expansion of posttensioning steel and wall concrete at the temperature to which the post-tensioning steel is exposed, taking into consideration the effects of the concrete aggregate type on the concrete coef�cient of thermal expansion (2) Reduction in strength and modulus of elasticity of the outer tank concrete, reinforcing and post-tensioning steel due to elevated temperature (3) Reduction in the wall post-tensioning due to pre-stressing steel softening and relaxation at elevated temperature
5.3.5 Vaporizer Spacing. 5.3.5.1 Vaporizers using �ammable heat transfer �uids and their primary heat sources shall be located at least 50 ft (15 m) from any other source of ignition. (A) Where more than one vaporizer is installed at one loca‐ tion, an adjacent vaporizer or primary heat source shall not be considered to be a source of ignition. (B) Process heaters or other units of �red equipment shall not be considered to be sources of ignition with respect to vapor‐ izer siting if they are interlocked so that they cannot be oper‐ ated while a vaporizer is operating or while the piping system serving the vaporizer either is cooled down or is being cooled down. 5.3.5.2 Integral heated vaporizers shall be located at least 100 ft (30 m) from a property line that can be built upon (see 5.3.5.4) and at least 50 ft (15 m) from the following:
(1)
(C) The concrete wall, including the wall concrete mix, shall be designed to avoid explosive spalling.
(2)
5.3.4.3 The minimum separation distance between LNG containers and containers containing �ammable refrigerants or from property lines that can be built upon shall be in accordance with Table 5.3.4.1.
(3)
5.3.4.4 A clear space of at least 3 ft (0.9 m) shall be provided for access to all isolation valves serving multiple containers. 5.3.4.5 LNG containers of greater than 125 gal (0.5 m3) capacity shall not be located in buildings.
Any impounded LNG, �ammable refrigerant, or �amma‐ ble liquid (see 5.3.4) or the paths of travel of such �uids between any other source of accidental discharge and the impounding area LNG, �ammable liquid, �ammable refrigerant, or �am‐ mable gas storage containers or tanks; un�red process equipment containing such �uids; or loading and unload‐ ing connections used in the transfer of such �uids Control buildings, of�ces, shops, and other occupied or important plant structures
5.3.5.3 Heaters or heat sources of remote heated vaporizers shall comply with 5.3.5.2. 5.3.5.4 Remote heated, ambient, and process vaporizers shall be located at least 100 ft (30 m) from a property line that can be built upon.
2016 Edition
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
PLANT SITING AND LAYOUT
5.3.5.5 Vaporizers used in conjunction with LNG containers having a capacity of 70,000 gal (265 m 3) or less shall be located with respect to the property line in accordance with Table 5.3.4.1, assuming the vaporizer to be a container with a capacity equal to the largest container to which it is connected. 5.3.5.6 A clearance of at least 5 ft (1.5 m) shall be maintained between vaporizers. 5.3.6 Process Equipment Spacing. 5.3.6.1 Process equipment containing LNG, refrigerants, �am‐ mable liquids, or �ammable gases shall be located at least 50 ft (15 m) from sources of ignition, a property line that can be built upon, control centers, of�ces, shops, and other occupied structures. 5.3.6.2 Where control centers are located in a building hous‐ ing �ammable gas compressors, the building construction shall comply with 5.4.3. 5.3.6.3 Fired equipment and other sources of ignition shall be located at least 50 ft (15 m) from any impounding area or container drainage system. 5.3.7 Loading and Unloading Facility Spacing. 5.3.7.1 A pier or dock used for pipeline transfer of LNG shall be located so that any marine vessel being loaded or unloaded is at least 100 ft (30 m) from any bridge crossing a navigable waterway. 5.3.7.2 The loading or unloading manifold shall be at least 200 ft (61 m) from such a bridge. 5.3.7.3 LNG and �ammable refrigerant loading and unload‐ ing connections shall be at least 50 ft (15 m) from uncontrol‐ led sources of ignition, process areas, storage containers, control buildings, of�ces, shops, and other occupied or impor‐ tant plant structures unless the equipment is directly associated with the transfer operation. 5.4 Buildings and Structures. 5.4.1 Buildings and Structures Design Classi�cation. Build‐ ings and structures shall be classi�ed in accordance with the following:
(1)* Classi�cation A — Buildings and structures as de�ned in 7.4.4.6(3) (2) Classi�cation B. — Buildings and structures supporting or enclosing equipment and piping that contain �amma‐ ble or toxic materials (3) Classi�cation C — All other buildings and structures 5.4.2 Buildings and Structures Design. Buildings and struc‐ tures shall be designed for seismic, wind, ice and snow in accordance with 5.4.2.1 through 5.4.2.3. 5.4.2.1 Classi�cation A. Seismic design shall use the operat‐ ing basis earthquake (OBE), safe shutdown earthquake (SSE), and aftershock level earthquake (ALE) ground motions as de�ned in 7.4.4.3through7.4.4.5 for determination of loads to be used per ASCE 7, Minimum Design Loads for Buildings and Other Structures ; wind, ice, and snow design shall use an occu‐ pancy category of IV per ASCE 7. 5.4.2.2 Classi�cation B. Seismic, wind, ice, and snow design shall use a risk category of III per ASCE 7.
59A-17
5.4.2.3 Classi�cation C. Seismic, wind, ice, and snow design shall use a risk category of II per ASCE 7. 5.4.3 Buildings or structural enclosures in which LNG, �am‐ mable refrigerants, and �ammable gases are handled shall be of lightweight, noncombustible construction with non-loadbearing walls. 5.4.4 Rooms containing LNG and �ammable �uids,if located within or attached to buildings in which such �uids are not handled (e.g., control centers, shops), shall be designed for �re and explosion control in accordance with the following:
(1) De�agration venting shall be provided in accordance with NFPA 68. (2) Common walls shall have no doors or other communicat‐ ing openings (3) Common walls shall have a �re-resistance rating of at least 1 hour. ` , , ` , ` , , ` , , ` ` , , ` ` , ` , , ` , ` , ` ` ` , , , ` ` ` , ` , , , , ` ` ` -
5.4.5 Buildings or structural enclosures in which LNG, �am‐ mable refrigerants, and �ammable gases are handled shall be ventilated to minimize the possibility of hazardous accumula‐ tions of �ammable gases or vapors, in accordance with 5.4.5.1 through 5.4.5.4. 5.4.5.1 Ventilation shall be permitted to be by means of one of the following:
(1) A continuously operating mechanical ventilation system (2) A combination gravity ventilation system and normally nonoperating mechanical ventilation system that is ener‐ gized by combustible gas detectors in the event combusti‐ ble gas is detected (3) A dual rate mechanical ventilation system with the high rate energized by gas detectors in the event �ammable gas is detected (4) A gravity ventilation system composed of a combination of wall openings and roof ventilators (5) Other approved ventilation systems 5.4.5.2 If there are basements or depressed �oor levels, a supplemental mechanical ventilation system shall be provided. 5.4.5.3 The ventilation rate shall be at least 1 cfm of air per ft 2 (5 L/sec of air per m 2) of �oor area. 5.4.5.4 If vapors heavier than air can be present, a portion of the ventilation shall be from the lowest level exposed to such vapors. 5.4.6 Buildings or structural enclosures not covered by 5.4.3 through 5.4.5 shall be located, or provision otherwise shall be made, to minimize the possibility of entry of �ammable gases or vapors. 5.4.7* Buildings or structural enclosures not covered by 5.4.3 through 5.4.5 shall be designed, constructed, and installed to protect occupants against explosion, �re, and toxic material releases. 5.5* Designer and Fabricator Competence. 5.5.1 Supervision shall be provided for the fabrication of and for the acceptance tests of facility components to the extent necessary to ensure that they are structurally sound and other‐ wise in compliance with this standard. 5.5.2* Soil and general investigations shall be made to deter‐ mine the adequacy of the intended site for the facility.
2016 Edition
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
59A-18
PRODUCTION, STORAGE, AND HANDLING OF LIQUEFIED NATURAL GAS (LNG)
5.5.3 Designers, fabricators, and constructors of LNG facility systems and equipment shall be competent in their respective �elds. 5.5.4 Supervision shall be provided for the fabrication, construction, and acceptance tests of facility components to verify that the facilities are structurally sound and otherwise in compliance with this standard. 5.6* Soil Protection for Cryogenic Equipment. LNG contain‐ ers (see 7.3.7) , cold boxes, piping and pipe supports, and other cryogenic apparatus shall be designed and constructed to prevent damage to these structures and equipment due to freezing or frost heaving in the soil, or means shall be provided to prevent damaging forces from developing.
5.8.7 Concrete that is not constantly exposed to LNG and that has been subjected to sudden and unexpected exposure to LNG shall be inspected, and repaired if necessary, as soon as is practical after it has returned to ambient temperature. 5.9 Portable LNG Facility. 5.9.1 Where portable LNG equipment is used for temporary use, for service maintenance during gas systems repair or alter‐ ation, or for other short-term applications, the following requirements shall be met:
(1) Temporary portable LNG equipment shall not remain in service more than 180 days at the portable equipment installation. Portable installations in service more than 180 days shall meet one of the following requirements:
5.7 Falling Ice and Snow. Measures shall be taken to protect personnel and equipment from falling ice or snow that has accumulated on high structures.
(a)
5.8 Concrete Design and Materials. 5.8.1 Concrete used for construction of LNG containers shall be in accordance with 7.4.3. 5.8.2 Concrete structures that are normally or periodically in contact with LNG, including the foundations of cryogenic containers, shall be designed to withstand the design load, applicable en vironmental loadings, and anticipated tempera‐ ture effects. 5.8.2.1 The design of the structures shall be in accordance with the provisions of 7.4.3.2.
(2) (3)
(4)
5.8.2.2 The materials and construction shall be in accordance with the provisions of 7.4.3.2. 5.8.3 Structural concrete for pipe supports shall comply with Section 9.5.
(5)
5.8.4 Other Concrete Structures.
(6)
5.8.4.1 All other concrete structures shall be investigated for the effects of potential contact with L NG.
(7)
5.8.4.2 If failure of these structures would create a hazardous condition or worsen an existing emergency condition by expo‐ sure to LNG, the structures shall be protected to minimize the effects of such exposure, or they shall comply with 7.4.3.2.
(8)
5.8.5* Nonstructural concrete for incidental nonstructural uses, such as slope protection, impounding area paving, and other nonstructural slabs-on-grade, shall conform to ACI 304R, Guide for Measuring, Mixing, Transportation and Placing of Concrete . ` ` ` , , , , ` , ` ` ` , , , ` ` ` , ` , ` , , ` , ` ` , , ` ` , , ` , , ` , ` , , ` -
5.8.6 Minimum Reinforcement. 5.8.6.1 Reinforcement for concrete structures designed for LNG containment or cold vapor containment, other than those in 5.8.1 and 5.8.2; or for concrete structures covered in 5.8.3 and 5.8.4 shall be a minimum of 0.5 percent of the crosssectional area of concrete for crack control in accordance with Appendix G of ACI 350, Code Requirements for Environmental Engineering Concrete Structures . 5.8.6.2 Minimum reinforcement for concrete for incidental nonstructural uses covered in 5.8.5 shall be in accordance with the shrinkage and temperature reinforcement provisions of ACI 318, B ui lding Code Requirements for Structural Concrete and Commentary .
(9) (10) (11) (12)
Approval by the AHJ to remain for a period exceeding 180 days (b) Compliance with all the applicable requirements of Chapter 13 for stationary applications using ASME containers and with the security require‐ ments in Section 12.9 LNG transport vehicles complying with U.S. Department of Transportation (DOT) requirements shall be used as the supply container. All portable LNG equipment shall be operated by at least one person quali�ed by experience and training in the safe operation of these systems in accordance with requirements in 14.9.3 and 14.9.4, based on the written training plan requirements in 14.9.1 and 14.9.2. All other operating personnel, at a minimum, shall be quali�ed by training in accordance with requirements in 14.9.3 and 14.9.4, based on the written training plan requirements in 14.9.1 and 14.9.2. All personnel requiring training in 5.9.1(2) and 5.9.1(3) shall receive refresher training in accordance with requirements in 14.9.6.1. All personnel training shall be documented in accord‐ ance with records requirements in 14.10.4. Each operator shall provide and implement a written plan of initial training in accordance with requirements in 14.9.1 and 14.9.2to instruct all designated operating and supervisory personnel. Provisions shall be made to minimize the possibility of accidental discharge of LNG at containers endangering adjoining property or important process equipment and structures or reaching surface water drainage. Portable or temporary containment means shall be permitted to be used. Vaporizers and controls shall comply with Section 8.3, 8.4.1, 8.4.2, 8.4.3.1, 8.4.6.1(1), 8.4.6.1(2), 8.4.7, and Section 8.5. Each heated vaporizer shall be provided with a means to shut off the fuel source remotely and at the installed location. Equipment and process design including piping, piping components, instrumentation and electrical systems, and transfer systems shall comply with Sections 4.5, 5.5; 6.3.1, 6.3.3, 6.3.4, 6.3.5, 6.5.1, 6.5.2, 6.5.4, 6.5.5, 9.2.1, 9.2.1.1, 9.2.1.2, 9.3.1.1, 9.3.1.2(3), 9.3.2.1 through 9.3.2.4, 9.3.3, 9.3.4; Sections 9.4 through 9.9; and if utilized, cryogenic pipe-in-pipe systems shall comply with Section 9.11, 10.7.1, 10.7.2, 10.7.6, 10.8.1, 11.4.1, 11.6.1, 11.6.2, 11.8.1, 11.8.2, 11.8.3, 11.8.6, 11.9.1, 11.9.2, 12.2.1, Section 12.3, and 12.3.3.
2016 Edition
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
PROCESS EQUIPMENT
(13) The LNG facility spacing speci�ed in Table 5.3.4.1 shall be maintained except where necessary to provide tempo‐ rary service on a public right-of-way or on property where clearances speci�ed in Table 5.3.4.1 are not feasi‐ ble and where the following additional requirements are met:
(14) (15) (16)
(17)
(18)
(2) All welding or brazing operations shall be performed with procedures quali�ed to Section IX of the ASME Boiler and Pressure Vessel Code. (3) All welding or brazing shall be performed by personnel quali�ed to the requirements of Section IX of the ASME Boiler and Pressure Vessel Code .
(a) Traf�c barriers shall be erected on all sides of the facility subject to passing vehicular traf�c. (b) The operation shall be continuously attended to monitor the operation whenever LNG is present at the facility. (c) If the facility or the operation causes any restric‐ tion to the normal �ow of vehicular traf�c, in addi‐ tion to the monitoring personnel required in 5.9.1(10), �ag persons shall be continuously on duty to direct such traf�c. Provision shall be made to minimize the possibility of accidental ignition in the event of a leak. Fire protection systems shall comply with 12.2.1, 12.3.1 through 12.3.6, 12.4.1, 12.4.2.2, 12.6.1, Section 12.7, 12.8.1, 12.9.1, and 12.9.2. Portable or wheeled �re extinguishers recommended by their manufacturer for gas �res shall be available at stra‐ tegic locations and shall be provided and maintained in accordance with NFPA 10. Operating and maintenance activities shall comply with Sections 13.17, 14.1 through 14.4, 14.6.1, 14.6.2, 14.6.4, 14.6.5, 14.6.6.5 through 14.6.6.8, 14.6.6.8.3, 14.6.6.8.4, 14.6.6.8.5, Section 14.7, 14.8.1, 14.8.2, 14.8.6, 14.8.8, 14.8.9, 14.8.10.1, 14.8.10.2, 14.8.10.3, 14.8.10.7, 14.8.13.1, 14.8.13.4, and 14.8.13.13. The site shall be continuously attended, and provisions shall be made to restrict public access to the site when‐ ever LNG is present.
5.9.2 If odorization is required of the temporary facility, the restrictions of 5.3.4.1 shall not apply to the location of odoriz‐ ing equipment containing 20 gal (7.6 L) or less of �ammable odorant within the retention system. Chapter 6 Process Equipment 6.1 Scope. This chapter applies to the requirements for the design and installation of process equipment. 6.2 Installation of Process Equipment. 6.2.1 Process system equipment containing LNG, �ammable refrigerants, or �ammable gases shall be installed in accord‐ ance with one of the following:
59A-19
6.3* Pumps and Compressors. 6.3.1 Pumps and compressors shall be constructed of materi‐ als selected for compatibility with the design temperature and pressure conditions. 6.3.2 Valving shall be installed so that each pump or compres‐ sor can be isolated for maintenance. 6.3.3 Where pumps or centrifugal compressors are installed for operation in parallel, each discharge line shall be equipped with a check valve. 6.3.4 Pumps and compressors shall be provided with a pressure-relieving device on the discharge to limit the pressure to the maximum design pressure of the casing and downstream piping and equipment, unless they are designed for the maxi‐ mum discharge pressure of the pumps and compressors. 6.3.5 Each pump shall be provided with a vent, relief valve, or both that will prevent overpressuring of the pump case during the maximum possible rate of cooldown. 6.3.6 Compression equipment that handles �ammable gases shall be provided with vents from all points where gases normally can escape. Vents shall be piped outside of buildings to a point of safe disposal. 6.4 Flammable Refrigerant and Flammable Liquid Storage. Installation of storage tanks for �ammable refrigerants and liquids shall comply with NFPA 30, NFPA 58, NFPA 59, API 2510, Design and Construction of Lique�ed Petroleum Gas (LPG) Installations ; or Section 5.3 of this standard. 6.5 Process Equipment. 6.5.1 The maximum allowable working pressure shall be docu‐ mented for process equipment. 6.5.2 Boilers shall be designed and fabricated in accordance with the ASME Boiler and Pressure Vessel Code , Section I, or with CSA B51, Boiler, Pressure Vessel and Pressure Piping Code. 6.5.3 Pressure vessels shall be designed and fabricated in accordance with the ASME Boiler and Pressure Vessel Code , Section VIII, Division 1 or Division 2, or with CSA B51, and shall be code-stamped.
Outdoors, for ease of operation, to facilitate manual �re�ghting, and to facilitate dispersal of accidentally released liquids and gases Indoors, in enclosing structures that comply with 5.4.3 through 5.4.5
6.5.4 Shell and tube heat exchangers shall be designed and fabricated in accordance with the ASME Boiler Pressure Vessel Code , Section VIII, Division 1, or with CSA B51, where such components fall within the jurisdiction of the pressure vessel code.
6.2.2 Welding and brazing of process equipment shall conform to the following:
6.5.5 Brazed aluminum plate �n heat exchangers shall be designed and fabricated in accordance with the ASME Boiler and Pressure Vessel Code , Section VIII, and ALPEMA Standards of the Brazed Aluminum Plate-Fin Heat Exchanger Manufacturers Asso‐ ciation .
(1) (2)
(1)
Welding and brazing of process equipment shall conform to the requirements of the standard to which the equip‐ ment is designed and constructed (see 6.5.2 through 6.5.5) . Where equipment is not constructed to a speci�c stand‐ ard, welding and brazing shall be in accordance with the requirements in 6.2.2(2).
6.5.6* Installation of internal combustion engines or gas turbines not exceeding 7500 horsepower per unit shall conform to NFPA 37.
2016 Edition
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
` , , ` , ` , , ` , , ` ` , , ` ` , ` , , ` , ` , ` ` ` , , , ` ` ` , ` , , , , ` ` ` -
PRODUCTION, STORAGE, AND HANDLING OF LIQUEFIED NATURAL GAS (LNG)
59A-20
6.5.7 A boil-off and �ash gas-handling system separate from container relief valves shall be installed for the safe disposal of vapors generated in the process equipment and LNG contain‐ ers. 6.5.7.1 Boil-off and �ash gases shall discharge into a closed system or into the atmosphere so that they do not create a hazard to people, equipment, or adjacent properties. 6.5.7.2 The boil-off venting system shall be designed so that it cannot inspirate air during normal operation. 6.5.8 If internal vacuum conditions can occur in any piping, process vessels, cold boxes, or other equipment, either the piping and equipment subject to vacuum shall be designed to withstand the vacuum conditions or provision shall be made to prevent vacuum. If gas is introduced for the purpose of preventing a vacuum condition, it shall not create a �ammable mixture within the system. Chapter 7 Stationary LNG Storage 7.1 Scope. This chapter presents the requirements for the inspection, design, marking, testing, and operation of station‐ ary LNG storage tank systems and ASME containers. 7.2 General. 7.2.1 Storage Tank Systems. 7.2.1.1 Storage tank systems, including membrane contain‐ ment tank systems, shall comply with the requirements of API 625, Tank Systems for Refrigerated Lique�ed Gas Storage , and the additional provisions of this chapter. The API 625 risk assess‐ ment shall be approved by the AHJ. 7.2.1.2 Metal containers that are part of an LNG storage tank system shall comply with API 620, Design and Construction of Large, Welded, Low-Pressure Tanks , and the further requirements in Section 7.4 below. 7.2.1.3 Concrete containers that are part of an LNG storage tank system shall comply with ACI 376, Code Requirements for Design and Construction of Concrete Structures for the Containments of Refrigerated Lique�ed Gases , and the requirements of Section 7.4. 7.2.1.4 The metallic membrane, load-bearing insulation, and the outer container moisture barrier speci�c to the membrane tank system shall comply with EN 14620, Design and manufacture of site built, vertical, cylindrical, �at-bottomed, steel tanks for the stor‐ age of refrigerated, lique�ed gases with operating temperatures between 0°C and −165°C , Parts 1–5, for material selection, design, instal‐ lation, examination, and testing and further requirements of Section 7.4. All other components of the membrane tank system shall comply with API 625, Tank Systems for Refrigerated Lique�ed Gas Storage ; API 620, Design and Construction of Large, Welded, Low-Pressure Storage Tanks ; ACI 376, Code Requirements for Design and Construction of Concrete Structures for the Containment of Refrigerated Lique�ed Gases ; and additional requirements in Section 7.4. 7.2.1.5 All the membrane system components, including insu‐ lation, primary membrane, and the secondary barrier of the thermal protection system, shall be designed in such a way that they can withstand all possible static and dynamic actions throughout the tank lifetime.
7.2.1.6 Should any con�ict exist among the requirements in 7.2.1.1 through 7.2.1.5, the most stringent requirement shall apply. 7.2.2 ASME Containers. ASME containers shall comply with the requirements of Section 7.5. 7.3 Design Considerations. 7.3.1 General. 7.3.1.1 Those parts of LNG containers that normally are in contact with LNG and all materials used in contact with LNG or cold LNG vapor [vapor at a temperature below −20°F (−29°C)] shall be physically and chemically compatible with LNG and intended for service at −270°F (−168°C). 7.3.1.2 All piping that is a part of an LNG tank system shall comply with requirements in this chapter and requirements within API 625, Tank Systems for Refrigerated Lique�ed Gas Storage . (A) Tank system piping shall include all piping internal to the container, within insulation spaces and within void spaces, external piping attached or connected to the container up to the �rst circumferential external joint of the piping, and exter‐ nal piping serving only tank instrumentation (including tank pressure relief valves). All liquid piping with a source of exter‐ nal line pressure shall be designed for the external line relief valve setting but not less than 50 psi (345 kPa). Double, full, and membrane containment tank systems shall have no pipe penetrations below the liquid level. (B) Inert gas purge systems wholly within the insulation spaces and relief valve discharge piping shall be exempt from compli‐ ance. (C) Piping that is a part of an ASME LNG container, including piping between the inner and outer containers, shall be in accordance with either the ASME Boiler and Pressure Vessel Code , Section VIII, or with ASME B 31.3, Process Piping. (D) Compliance of piping which is part of the ASME container shall be stated on or appended to the ASME Boiler and Pressure Vessel Code , Appendix W, Form U-1, “Manufacturer's Data Report for Pressure Vessels.” 7.3.1.3* All LNG tank systems shall be designed for both top and bottom �lling unless other means are provided to prevent strati�cation. 7.3.1.4 Any portion of the outer surface area of an LNG tank system or external members whose failure could result in loss of containment from accidental exposure to low temperatures resulting from the leakage of LNG or cold vapor from �anges, valves, seals, or other nonwelded connections shall be designed for such temperatures or otherwise protected from the effects of low-temperature exposure. 7.3.1.5 Where two or more tank systems are sited in a common dike, each tank system foundation shall be capable of withstanding contact with LNG or shall be protected against contact with an accumulation of LNG that might endanger structural integrity. 7.3.1.6 The density of the liquid shall be assumed to be the actual mass per unit volume at the minimum storage tempera‐ tures, except that the minimum density for design purposes shall be 29.3 lb/ft 3 (470 kg/m3).
2016 Edition --```,`,```,```,`,`,`,``,-`-`,`,`,`,`---
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
STATIONARY LNG STORAGE
7.3.1.7* Provisions shall be made for removal of the tank system from service.
(D) For membrane containment tank systems, the insulation system block shall include a non-foam cover (underneath the primary membrane) and shall include a welding thermal protection system in order to withstand all heat from welding during installation and during maintenance, if any.
7.3.2 Wind, Flood, and Snow Loads. 7.3.2.1 The wind, �ood, and snow loads for the design of LNG tank systems and storage containers in the United States shall be determined using the procedures outlined in ASCE 7, Mini‐ mum Design Loads for Buildings and Other Structures.
7.3.3.3 Storage tank systems insulation shall meet the require‐ ments of 625, Section 9. 7.3.4 Marking of LNG Storage Tank Systems and ASME Containers.
7.3.2.2 For �ood and snow loads, where a probabilistic approach is used, a 100-year mean occurrence interval shall be used.
7.3.4.1 Each storage tank system shall be identi�ed by the attachment in an accessible location of a corrosion-resistant nameplate as de�ned in API 625.
7.3.2.3 Basic design wind speed shall be based on ASCE 7 for risk category IV structures.
7.3.4.2 ASME containers shall be identi�ed by the attachment of a corrosion resistant nameplate as required by ASME Boiler and Pressure Vessel Code, Section VIII.
7.3.2.4 The wind, �ood, and snow loads used for the design of LNG storage containers in other countries shall be determined using either ASCE 7, or the values in the national code of the country.
7.3.4.3 Storage tank systems shall have all penetrations marked with the function of the penetration.
7.3.3 Container Insulation.
7.3.4.4 Penetration markings shall be visible if frosting occurs.
7.3.3.1 Exposed insulation shall be noncombustible, shall contain or inherently shall be a vapor barrier, shall be water‐ free, and shall resist dislodgment by �re hose streams.
7.3.5 Container Drying, Purging, and Cooldown. Before an LNG tank system is put into service, it shall be dried, purged, and cooled in accordance with 14.3.5 and 14.5.5 and tank systems shall include the provisions within API 625 and/or ACI 376, as applicable to the type of tank construction.
(A) Where an outer shell is used to retain loose insulation, the shell shall be constructed of steel or concrete. (B) Exposed weatherproo�ng shall have a �ame spread index not greater than 25. (See 3.3.12.)
7.3.6 Relief Devices. 7.3.6.1 All LNG tank systems shall be equipped with vacuum and pressure relief valves as required by the code or standard of manufacture.
7.3.3.2 The space between the inner container and the outer container shall contain insulation that is compatible with LNG and natural gas and that is noncombustible as installed for normal service and abnormal conditions.
7.3.6.2 Relief devices shall communicate directly with the atmosphere.
(A) A �re external to the outer tank shall not cause a reduc‐ tion to the internal containment system performance due to damage to any component of the insulation systems.
7.3.6.3 Vacuum-relieving devices shall be installed if the container can be exposed to a vacuum condition in excess of that for which the container is designed.
(B) The load-bearing bottom insulation shall be designed and installed so that cracking from thermal and mechanical stresses does not jeopardize the integrity of the container.
7.3.6.4 Each pressure and vacuum safety relief valve for LNG tank systems shall be able to be isolated from the tank systems for maintenance or other purposes by means of a manual fullopening stop valve.
(C) For tank systems other than membrane containment tank system, only materials used between the inner and outer tank bottoms (�oors) shall not be required to meet the combustibil‐ ity requirements, where the material and the design of the installation comply with all of the following:
(1) (2)
(3)
(4) (5)
59A-21
` , , ` , ` , , ` , , ` ` , , ` ` , ` , , ` , ` , ` ` ` , , , ` ` ` , ` , , , , ` ` ` -
(A) The stop valve(s) shall be lockable or sealable in the fully open position.
The �ame spread index of the material shall not exceed 25, and the material shall not support continued progres‐ sive combustion in air. The material shall be of such composition that surfaces that would be exposed by cutting through the material on any plane shall have a �ame spread index not greater than 25 and shall not support continued progressive combustion. It shall be shown by test that the combustion properties of the material do not increase signi�cantly as a result of long-term exposure to LNG or natural gas at the anticipa‐ ted service pressure and temperature. The materials in the installed condition shall be demon‐ strated to be capable of being purged of natural gas. The natural gas remaining after purging shall not be signi�cant and shall not increase the combustibility of the material.
(B) Pressure and vacuum relief valves shall be installed on the LNG tank system to allow each relief valve to be isolated indi‐ vidually while maintaining the required relieving capacity. (C) Where only one relief device is required, either a full-port opening three-way valve connecting the relief valve and its spare to the container or two relief valves separately connected to the container, each with a valve, shall be installed. (D) No more than one stop valve shall be closed at one time. (E) Safety relief valve discharge stacks or vents shall be designed and installed to prevent an accumulation of water, ice, snow, or other foreign matter and shall discharge vertically upward. 7.3.6.5 Pressure Relief Device Sizing. 7.3.6.5.1 The capacity of pressure relief devices shall be based on the following:
2016 Edition
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
PRODUCTION, STORAGE, AND HANDLING OF LIQUEFIED NATURAL GAS (LNG)
59A-22
(1) Fire exposure (2) Operational upset, such as failure of a control device (3) Other circumstances resulting from equipment failures and operating errors (4) Vapor displacement during �lling (5) Flash vaporization during �lling, as a result of �lling or as a consequence of mixing of products of different compo‐ sitions (6) Loss of refrigeration (7) Heat input from pump recirculation (8) Drop in barometric pressure 7.3.6.5.2 Pressure relief devices shall be sized to relieve the �ow capacity determined for the largest single relief �ow or any reasonable and probable combination of relief �ows.
Table 7.3.6.7.1 Environmental Factors Basis
F Factor
Base container Water application facilities Depressuring and emptying facilities Underground container Insulation or thermal protection* U.S. customary units
1.0 1.0 1.0 0 U (1660 T f ) −
F
=
SI units
34, 500
U ( 904 T f ) −
F
=
7.3.6.6 Vacuum Relief Sizing.
71, 000 *U = overall heat transfer coef�cient Btu/(hr · ft 2 ·°F) [W/(m2 ·°C)] of the insulation system using the mean value for the temperature range from T f to +1660°F (904°C); T f = temperature of vessel content at relieving conditions, °F (°C).
7.3.6.6.1 The capacity of vacuum relief devices shall be based on the following:
7.3.6.7.4 Pressure Relief Valve Capacity.
7.3.6.5.3* The minimum pressure-relieving capacity in pounds per hour (kilograms per hour) shall not be less than 3 percent of the full tank contents in 24 hours.
(1) Withdrawal of liquid or vapor at the maximum rate (2) Rise in barometric pressure (3) Reduction in vapor space pressure as a result of �lling with subcooled liquid 7.3.6.6.2 The vacuum relief devices shall be sized to relieve the �ow capacity determined for the largest single contingency or any reasonable and probable combination of contingencies, less the vaporization rate that is produced from the minimum normal heat gain to the container contents. 7.3.6.6.3 No vacuum relief capacity credit shall be allowed for gas-repressuring systems or vapor makeup systems. 7.3.6.7 Fire Exposure. 7.3.6.7.1 The pressure-relieving capacity required for �re exposure shall be computed by the following formulas: For U.S. customary units:
(A) The relieving capacity shall be determined by the follow‐ ing formula: [7.3.67.4(A)] W
H =
L
where: W = relieving capacity of product vapor at relieving conditions [lb/hr (g/s)] H = total heat in�ux, Btu/hr (watt) L = latent heat of vaporization of the stored liquid at the relieving pressure and temperature, Btu/lb (J/g) (B) The equivalent air�ow shall be calculated from the follow‐ ing formulas: For U.S. customary units:
[7.3.6.7.1a] H
=
34, 500 FA
0. 82
+
[7.3.6.7.4(B)a]
H n
Q a
For SI units: ` ` ` , , , , ` , ` ` ` , , , ` ` ` , ` , ` , , ` , ` ` , , ` ` , , ` , , ` , ` , , ` -
[7.3.6.7.1b] H = 71, 000 FA
0.82
=
3.09W
TZ M
For SI units:
+ H n
where: H = total heat in�ux [Btu/hr (watt)] F = environmental factor from Table 7.3.6.7.1 A = exposed wetted surface area of the container [ft 2 (m2)] H n = normal heat leak in refrigerated tanks [Btu/hr (watt)] 7.3.6.7.2 The exposed wetted area shall be the area up to a height of 30 ft (9 m) above grade. 7.3.6.7.3* Where used, insulation shall resist dislodgment by �re-�ghting equipment, shall be noncombustible, and shall not decompose at temperatures up to 1000°F (538°C) in order for the environmental factor for insulation to be used.
[7.3.6.7.4(B)b] Q a
=
0.93W
TZ M
where: Q a = equivalent �ow capacity of air at 60°F (15°C) and absolute pressure of 14.7 psi (101 kPa) [ft 3/hr (m3/hr)] W = relieving capacity of product vapor at relieving conditions [lb/hr (g/s)] T = absolute temperature of product vapor at relieving condi‐ tions [°R (K)] Z = compressibility factor of product vapor at relieving condi‐ tion M = product vapor molecular mass [lbm/lb mol (g/g mol)]
2016 Edition
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
STATIONARY LNG STORAGE
59A-23
7.3.7 Foundations.
7.4.2 Metal Containers.
7.3.7.1* LNG containers shall be installed on foundations designed by a quali�ed engineer and constructed in accord‐ ance with recognized structural engineering practices.
7.4.2.1 Welded containers designed for not more than 15 psi (103 kPa) shall comply with API 620.
7.3.7.2 Storage tank systems foundations shall be designed in accordance with ACI 376. 7.3.7.3 Prior to the start of design and construction of the foundation, a subsurface investigation and evaluation shall be conducted by a soils engineer to determine the stratigraphy and physical properties of the soils underlying the site. A lique‐ faction evaluation in accordance with 11.8.3 of ASCE 7 shall be included as part of the above evaluation. 7.3.7.4 The bottom of the outer container shall be above the groundwater table or protected from contact with groundwater at all times. 7.3.7.5 The outer container bottom material in contact with soil shall meet one of the following requirements:
(1) Selected to minimize corrosion (2) Coated or protected to minimize corrosion (3)* Protected by a cathodic protection system 7.3.7.6 Where no air gap exists under the tank system founda‐ tion, a heating system shall be provided to prevent the 32°F (0°C) isotherm from penetrating the soil. (A) The heating system shall be designed to allow functional and performance monitoring. (B) Where there is a discontinuity in the foundation, such as for bottom piping, attention and separate treatment shall be given to the heating system in this zone. (C) Heating systems shall be designed, selected, and installed so that any heating element and temperature sensor used for control can be replaced after installation. (D)* Provisions shall be incorporated to prevent moisture accumulation in the conduit. 7.3.7.7 If the foundation is designed to provide air circulation in lieu of a heating system, the bottom of the outer container shall be of a material compatible with the temperatures to which it can be exposed. 7.3.7.8 A container bottom temperature monitoring system capable of measuring the temperature on a predetermined pattern over the entire surface area in order to monitor the performance of the bottom insulation and the container foun‐ dation heating sy st em (if provided) shall be installed. 7.3.7.9 The system in 7.3.7.8 shall be used to conduct a container bottom temperature survey 6 months after the container has been placed in service and annually thereafter, after an operating basis earthquake (OBE), and after the indi‐ cation of an abnormally cool area. 7.4 Tank Systems. 7.4.1 General. 7.4.1.1* Certi�cation. Upon completion of all tests and inspections of each LNG tank system, the contractor shall certify to the purchaser that the LNG tank system has been constructed in accordance with the applicable requirements of this standard.
7.4.2.2* API 620, Appendix Q, shall be applicable for LNG with the following changes. The frequency of examination by radiography or ultrasonic methods in primary and secondary liquid containers shall be increased to 100 percent for all butt welds in the cylindrical shell (except for the shell-to-bottom welds associated with a �at bottom container) and all butt welded annular plate radial joints. 7.4.2.3 Weld Procedure and Production Weld Testing for Membrane Containment Tank Systems. For membrane containment tank systems, weld procedure and production weld testing shall comply with EN 14620, Design and manufacture of site built, vertical, cylindrical, �at-bottomed, steel tanks for the stor‐ age of refrigerated, lique�ed gases with operating temperatures between 0°C and −165°C , Part 2, and the requirements in 7.4.2.3.1 through 7.4.2.3.5. 7.4.2.3.1 Quali�cation of Welders. All personnel associated with the welding fabrication of the membrane system shall be quali�ed by the manufacturer per an agreed-upon schedule between the purchaser, the AHJ, and the fabricator, and all records shall be available for review. 7.4.2.3.2 Inspection. One hundred percent of all welds shall be visually examined for workmanship and conformance to the fabrication requirements. The personnel performing the visual inspection shall be quali�ed to an accepted standard for this inspection work. (A) Bead placement and consistency shall be, at a minimum, documented by digital means for review by supervisory person‐ nel. (B) Upon cooldown of the welds to room temperature, provi‐ sions shall be made to perform a penetrant inspection (PT) of at least 5 percent of each weld type each day; and the selection factors shall include orientation, welding direction, and the complexity of the welding being performed.
(1)
All pro�les and con�gurations of welds shall be subjected to the 5 percent requirement, and the selection of this 5 percent sample shall be agreed upon by the fabricator, the customer’s representative, and the AHJ. (2) The acceptance standard for this inspection technique shall be agreed upon by all parties. (3) Any indication of a leak requires an additional 5 percent PT of the total distance welded by each welder. (C) Inspection after completion of the membrane, which is the last step prior to the cooldown of the tank to service temperature, shall include a leakage test in parallel with a mechanical stress test as follows:
(1) Leakage shall be determined as agreed upon by the fabri‐ cator and the customer. (2) Tracer gas for the leak test shall be in accordance with approved procedure. (3) Mechanical stress testing of the welding joints shall be performed by applying three cycles from atmospheric pressure to +20 mbarg inside the insulation space, with the pressure maintained, for a minimum time of 30 minutes, and the data shall be recorded.
2016 Edition --```,`,```,```,`,`,`,``,-`-`,`,`,`,`---
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
59A-24
PRODUCTION, STORAGE, AND HANDLING OF LIQUEFIED NATURAL GAS (LNG)
(4) All areas where leakage exceeds the limit shall be repaired and inspected per 7.4.2.3.2 and the manufactur‐ er’s approved procedure. 7.4.2.3.3 Post-Repair Inspection. (A) Additional tracer gas testing shall be performed if more than four leaks per 1000 m² of membrane are identi�ed. (B) All repaired areas shall be visually inspected (VT), vacuum box (VB) tested, and dye penetrant (PT) tested. 7.4.2.3.4 Final Global Test. The �nal acceptance testing of the completed membrane structure following completion of its installation in the structural outer shell/container shall be in agreement with the approved test procedure and witnessed by all relevant parties and performed as follows:
(1) The overall tightness of the membrane shall be deter‐ mined by establishing a pressure difference between the tank and the insulation space, which allows gas �ow through the membrane representative of potential leaks on the membrane. (2) The potential leak(s) shall be characterized by measuring the oxygen content increase in the primary insulated space as the tank is pressurized with dry air. (3) The primary insulated space shall be regulated slightly above the atmospheric pressure. (4) All test data, records, documentation, and witness records shall be submitted to all parties for review and �nal acceptance. 7.4.2.3.5 Control During Removal of Construction Equipment. A daily tightness check and monitoring shall be performed during removal of construction equipment by pulling vacuum inside insulated spaces. Any pressure rise, which is indicative of a leak, shall be reported and corrective action shall be taken. 7.4.3 Concrete Containers. 7.4.3.1 The design, construction, inspection, and testing of concrete containers shall comply with ACI 376. 7.4.3.2 Tanks with unlined concrete primary liquid contain‐ ment shall include a means of detecting and eliminating liquid accumulation in the annular space. 7.4.3.3 Non-metallic coatings placed on a concrete container acting as a moisture and/or product vapor barrier shall meet the criteria in ACI 376. 7.4.3.4 Metallic barriers incorporated in, and functioning compositely with, concrete containers shall be of a metal de�ned in API 620, Appendix Q. 7.4.4 Seismic Design of Land-Based Field-Fabricated Tank Systems. 7.4.4.1 A site-speci�c investigation shall be performed for all installations except those provided for in 7.5.2 to determine the characteristics of seismic ground motion and associated response spectra. (A) The site-speci�c investigation performed in accordance with ASCE 7, Chapter 21 shall account for the regional seismic‐ ity and geology, the expected recurrence rates and maximum magnitudes of events on known faults and source zones, the location of the site with respect to these seismic sources, near source effects, if any, and the characteristics of subsurface conditions.
(B) On the basis of the site-speci�c investigation, the ground motion of a maximum considered earthquake (MCER ) shall be the motion having a 2 percent probability of exceedance within a 50-year period (mean recurrence interval of 2475 years), adjusted by the requirements of ASCE 7, C hapter 21. (C) For the MCER ground motion, vertical and horizontal acceleration response spectra shall be constructed covering the entire range of anticipated damping ratios and natural periods of vibration, including the fundamental period and damping ratio for the sloshing (convective) mode of vibration of the contained LNG. (D) The MCER response spectral acceleration for any period, T , shall correspond to a damping ratio that best represents the structure being investigated as speci�ed in API 620, Appendix L, and ACI 376, Chapter 6. (E) If information is not available to develop a vertical response spectrum, the ordinates of the vertical response spec‐ trum shall not be less than two-thirds of those of the horizontal spectrum. If information is available, the corresponding ratio shall not be less than one-half. 7.4.4.2 The LNG tank systems and their impounding systems shall be designed for the following three levels of seismic ground motion:
(1) Safe shutdown earthquake (SSE) as de�ned in 7.4.4.3 (2) Operating basis earthquake (OBE) as de�ned in 7.4.4.4 (3) Aftershock level earthquake (ALE) as de�ned in 7.4.4.5 7.4.4.3 The SSE shall be represented by a ground motion response spectrum in which the spectral acceleration at any period, T, shall be equal to the spectral acceleration of the MCER ground motion de�ned in 7.4.4.1. 7.4.4.4* The OBE ground motion shall be the motion repre‐ sented by an acceleration response spectrum having a 10 percent probability of exceedance within a 50-year period (mean return interval of 475 years). In the United States, the OBE spectra can be developed from the U.S. Geological Survey (USGS) national seismic maps or from site-speci�c probabilis‐ tic seismic hazard analysis. If a site-speci�c analysis is carried out, the OBE spectra shall not be less than 80 percent of the USGS spectra adjusted for local site conditions. 7.4.4.5 The ALE ground motion is de�ned as one-half SSE. 7.4.4.6 The three levels of ground motion de�ned in 7.4.4.3 through 7.4.4.5 shall be used for the earthquake-resistant design of the following structures and systems:
(1) LNG tank systems and their impounding systems (2) System components required to isolate the LNG tank system and maintain it in a safe shutdown condition (3) Structures or systems, including �re protection systems, the failure of which could affect the integrity of 7.4.4.6(1) or 7.4.4.6(2) (A) The structures and systems shall be designed to remain operable during and after an OBE. (B) The OBE design shall be based on a response reduction factor equal to 1.0. (C) The SSE design shall provide for no loss of containment capability of the primary container of single, double, and full containment tank systems and of the metal liquid barrier of
2016 Edition
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
` , , ` , ` , , ` , , ` ` , , ` ` , ` , , ` , ` , ` ` ` , , , ` ` ` , ` , , , , ` ` ` -
STATIONARY LNG STORAGE
membrane tank systems, and it shall be possible to isolate and maintain the LNG tank systems during and after the SSE. (D) Where used, response reduction factors applied in the SSE design shall be demonstrated not to reduce the perform‐ ance criteria in 7.4.4.6(C). The values in API 620, Appendix L, are deemed to comply. 7.4.4.7 The secondary liquid container or impounding system for single, double, or full containment tanks shall, as a mini‐ mum, be designed to withstand an SSE while empty and an ALE while holding a volume e quivalent to the primary contain‐ ment liquid at the maximum normal operating level as de�ned in API 625, Tank Systems for Refrigerated Lique�ed Gas Storage .
59A-25
7.4.5.2 The inspection shall be conducted by inspectors who are employees of the operator, an engineering or scienti�c organization, or a recognized insurance or inspection company. 7.4.5.3 Inspectors shall be quali�ed in accordance with the code or standard applicable to the container and as speci�ed in this standard. 7.4.6 Testing of LNG Containers. 7.4.6.1 LNG primary containers shall be hydrostatically tested and leak tested in accordance with the governing construction code or standard, and all leaks shall be repaired.
7.4.4.8 For the membrane tank system, all components of the product-containing structure, including the liquid barrier, insu‐ lation system, thermal corner protection system (see 7.4.7.1) , and the outer concrete tank, shall be designed to withstand without failure an SSE event with the tank �lled to the maxi‐ mum normal operating level. The outer concrete tank and the thermal corner protection shall be designed to withstand an ALE with a tank full to the maximum normal operating level assuming that the membrane has failed and that the outer tank wall and thermal corner protection system are exposed to LNG.
7.4.6.2 LNG concrete primary containers shall be hydrotested to a liquid height equal to the design liquid height times the product design speci�c gravity times 1.25 and applying an over‐ load pressure of 1.25 times the pressure for which the vapor space is designed.
7.4.4.9 An LNG tank system shall be designed for the OBE, SSE, and ALE in accordance with API 620 and ACI 376.
(A) Field welding shall be limited to saddle plates or brackets provided for the purpose and to repairs permitted under the code or standard of fabrication.
7.4.4.10 After an event exceeding OBE, the tank system shall be evaluated for safe continued operation. After an SSE event, the container shall be emptied and inspected prior to resump‐ tion of container-�lling operations. 7.4.4.11 The design of the LNG tank systems and structural components shall be in accordance with API 620 or ACI 376. Soil-structure interaction (SSI) shall be included where the tank system is not founded on bedrock (Site Class A or B per ASCE 7). SSI is permitted to be performed in accordance with the requirements of ASCE 7, Chapter 19. 7.4.4.12 The outer concrete tank analysis and design for the leak and leak plus ALE event shall take into account any damage that might have occurred to the outer concrete tank due to prior events, including the SSE earthquake. (A) The outer concrete tank shall be considered as undam‐ aged during the prior SSE event if the following conditions are met:
(1) (2)
Tensile stresses in the reinforcing steel do not exceed 90 percent of the reinforcing steel yield. Maximum concrete compressive stresses do not exceed 85 percent of the concrete design compressive strength.
(B) If the conditions in 7.4.4.12(A) are not met, the prior damage shall be taken into account in the spill analysis. 7.4.4.13 Instrumentation capable of measuring the ground motion to which tank systems are subjected shall be provided on the site. 7.4.5 Inspection. 7.4.5.1 Prior to initial operation, tank systems shall be inspec‐ ted to ensure compliance with the engineering design and material, fabrication, assembly, and test provisions of this stand‐ ard.
7.4.6.3 The tank system designer shall provide a test proce‐ dure based on the applicable construction standard. 7.4.6.4 After acceptance tests are completed, there shall be no �eld welding on the LNG containers, except as permitted in 7.4.6.4(A) and (B).
(B) Retesting by a method appropriate to the repair or modi�‐ cation shall be required only where the repair or modi�cation is of such a nature that a retest actually tests the element affec‐ ted and is necessary to demonstrate the adequacy of the repair or modi�cation. 7.4.6.5* Membrane containment tank systems shall be tested in accordance with EN 14620, Design and manufacture of site built, vertical, cylindrical, �at-bottomed, steel tanks for the storage of refrigerated, lique�ed gases with operating temperatures between 0°C and −165°C , Part 5, Table 1, as follows:
(1)
The leakage test, as de�ned in the Note under EN 14620, Part 5, paragraph 4.1.1, shall be performed. (2) Leakage through the membrane to the insulation space during service shall be controlled in order to maintain a gas concentration level below 30 percent of the lower explosive limit (LEL) by sweeping the insulated space with an inert gas. (3) If the gas concentration cannot be maintained below 30 percent of the LEL, the tank shall be decommissioned and retested. (4) For purposes of evaluating the 30 percent level, the �ow of purge gas within the annular space shall not be increased above the normal operating rate. 7.4.6.6 Veri�cation of all components of the membrane containment tank system design by experimental data from model tests shall be carried out. 7.4.7 Additional Requirements for Membrane Containment Tank Systems. 7.4.7.1 A thermal corner protection system functionally equiv‐ alent to the thermal corner protection system for concrete tanks (as de�ned in API 625, Tank Systems for Refrigerated Lique‐ �ed Gas Storage , Section 6, and if required by ACI 376, Code Requirements for Design and Construction of Concrete Structures for
2016 Edition
--```,`,```,```,`,`,`,``,-`-`,`,`,`,`---
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
59A-26
PRODUCTION, STORAGE, AND HANDLING OF LIQUEFIED NATURAL GAS (LNG)
the Containment of Refrigerated Lique�ed Gases ) shall be provided for the outer concrete tank of the membrane tank system. (A) The thermal corner protection shall protect the entire bottom of the outer tank and at least the lower 16.5 ft (5 m) of the wall from thermal shock and shall be liquidtight when it is in contact with LNG and vapor-tight in all conditions.
20 percent thicker than the penetration depth where z > 0.75 (b) 50 percent thicker than the penetration depth where z ≤ 0.75 (2) The concrete wall is designed to be able to resist normal operating loads with any one horizontal tendon completely ineffective.
(B) The thermal corner protection system shall be permitted to be either metallic or made from nonmetallic materials compatible with LNG and shall maintain structural integrity and liquid/gas tightness under all applicable mechanical and thermal loads.
(D) For concrete walls post-tensioned with a wire wrapping system, the wall shall be designed to resist normal operating loads with the wires affected by a speci�ed impact load consid‐ ered completely ineffective. No unwrapping of the posttensioning wires shall be allowed.
(C) The membrane containment tank system supplier shall provide tests independently witnessed and veri�ed by a thirdparty agency clearly demonstrating the leak-tightness of all the thermal corner system under spill conditions. Historical tests shall be acceptable provided that construction processes and materials of construction are the same as those proposed.
7.4.7.2.4 At a minimum, the outer concrete container for the membrane tank system shall meet the construction tolerances speci�ed in ACI 376, Code Requirements for Design and Construc‐ tion of Concrete Structures for the Containment of Refrigerated Lique‐ �ed Gases . Where more stringent tolerances are required by the membrane and insulation systems, those more stringent toler‐ ances shall be speci�ed by the membrane tank engineer and met by the tank contractor.
(D) Nondestructive examination (NDE) performed on the secondary barrier and NDE acceptance criteria shall ensure that the provided tightness is equivalent to the tightness provi‐ ded by the metallic thermal corner protection system of the full containment tank system. 7.4.7.2 The outer concrete container of the membrane containment tank system shall meet all requirements of ACI 376, Code Requirements for Design and Construction of Concrete Structures for the Containment of Refrigerated Lique�ed Gases , for the secondary concrete container, including materials, design, construction, inspection, and testing and the additional requirements speci�ed in 7.4.7.2.1 through 7.4.7.2.5. 7.4.7.2.1 The pressure of the liquid product shall be a design load for the outer concrete tank. The liquid-product pressure ultimate limit state (ULS) load factors for operating and abnor‐ mal loading conditions shall be in accordance with Table 7.2 of ACI 376, Code Requirements for Design and Construction of Concrete Structures for the Containment of Refrigerated Lique�ed Gases . 7.4.7.2.2 The outer concrete container wall and slab-to-wall junction shall be checked for fatigue assuming four full loadunload cycles a week for the expected life of the tank. Perform‐ ance criteria of ACI 376, Code Requirements for Design and Construction of Concrete Structures for the Containment of Refrigerated Lique�ed Gases , Appendix C, shall apply. 7.4.7.2.3 The outer concrete container wall shall resist the speci�ed impact load without perforation and scabbing. (A) The concrete wall thickness shall be at least 40 percent greater than the scabbing depth calculated per CEB 187, Concrete Structures Under Impact and Impulsive Loading — Synthesis Report , Section 4.1.2.2. (B) The concrete wall thickness shall be at least 20 percent greater than the perforation thickness calculated per CEB 187, Section 4.1.1.1.
(a)
7.4.7.2.5 The outer concrete container shall be hydrotested prior to membrane and insulation installation following the primary container hydrotest requirements of API 625, Tank Systems for Refrigerated Lique�ed Gas Storage , Section 10. 7.5 ASME Containers Designed for Operation at More Than 15 psi (103 kPa). 7.5.1 General. 7.5.1.1 Containers shall be double-walled, with the inner tank holding the LNG surrounded by insulation contained in the outer tank. 7.5.1.2 The insulation shall be evacuated or purged. 7.5.1.3 The inner tank shall be of welded construction and in accordance with Section VIII of the ASME Boiler and Pressure Vessel Code and shall be ASME-stamped and registered with the National Board of Boiler and Pressure Vessel Inspectors or other agencies that register pressure vessels. (A) Where vacuum is utilized for insulation purposes, the design pressure of the inner tank shall be the sum of the required working pressure (absolute), and the hydrostatic head of LNG. (B) Where vacuum is not utilized as part of the insulation, the design pressure shall be the sum of the required working gauge pressure and the hydrostatic head of LNG. (C) The inner container shall be designed for the most critical combination of loading resulting from internal pressure and liquid head, the static insulation pressure, the insulation pres‐ sure as the container expands after an in-service period, the purging and operating pressure of the space between the inner and outer containers, and seismic loads.
(C) The concrete wall shall be designed so that either one of the following conditions is satis�ed:
7.5.1.4 The outer container shall be of welded construction.
(1) The distance between the outer face of the concrete container and the centroid of the pre-stressing tendons is greater than the penetration depth calculated per CEB 187, Section 4.1.2.1, with the following allowances for uncertainty:
(1) Any of the carbon steels in Section VIII, Part UCS of the ASME Boiler and Pressure Vessel Code at temperatures at or above the minimum allowable use temperature in Table 1A of the ASME Boiler and Pressure Vessel Code , Section II, Part D
(A) The following materials shall be used:
2016 Edition
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
` , , ` , ` , , ` , , ` ` , , ` ` , ` , , ` , ` , ` ` ` , , , ` ` ` , ` , , , , ` ` ` -
STATIONARY LNG STORAGE
(2)
Materials with a melting point below 2000°F (1093°C) where the container is buried or mounded
(B) Where vacuum is utilized for insulation purposes, the outer container shall be designed by either of the following:
59A-27
7.5.1.8 The inner container shall be supported concentrically within the outer container by either a metallic or a nonmetallic system that is capable of sustaining the maximum loading of either of the following:
The ASME Boiler and Pressure Vessel Code , Section VIII, Parts UG-28, UG-29, UG-30, and UG-33, using an external pressure of not less than 15 psi (103 kPa) (2) Paragraph 3.6.2 of CGA 341, Standard for Insulated Cargo Tank Speci�cation for Cryogenic Liquids
(1) Shipping load supports shall be designed for the maxi‐ mum acceleration to be encountered, multiplied by the empty mass of the inner container. (2) Operating load supports shall be designed for the total mass of the inner container plus the maximum loading, which shall include the following:
(C) Heads and spherical outer containers that are formed in segments and assembled by welding shall be designed in accordance with the ASME Boiler and Pressure Vessel Code , Section VIII, Parts UG-28, UG-29, UG-30, and UG-33, using an external pressure of 15 psi (103 kPa).
(a) Seismic factors shall be included. (b) The mass of contained liquid shall be based on the maximum density of the speci�ed liquid within the range of operating temperatures, except that the minimum density shall be 29.3 lb/ft 3 (470 kg/m 3).
(D) The maximum allowable working pressure shall be speci‐ �ed for all components.
7.5.1.9 The allowable design stress in support members shall be the lesser of one-third of the speci�ed minimum tensile strength or �ve-eighths of the speci�ed minimum yield strength at room temperature. Where threaded members are used, the minimum area at the root of the threads shall be used.
(1)
(E) The outer container shall be equipped with a relief device or other device to release internal pressure, as follows:
(1) ` ` ` , , , , ` , ` ` ` , , , ` ` ` , ` , ` , , ` , ` ` , , ` ` , , ` , , ` , ` , , ` -
(2)
The discharge area shall be at least 0.00024 in.2/lb (0.34 mm2/kg) of the water capacity of the inner container, but the area shall not exceed 300 in.2 (0.2 m2). The relief device shall function at a pressure not exceed‐ ing the internal design pressure of the outer container, the external design pressure of the inner container, or 25 psi (172 kPa), whichever is least.
(F) Thermal barriers shall be provided to prevent the outer container from falling below its design temperature. (G) Saddles and legs shall be designed to withstand loads anticipated during shipping and installation, and seismic, wind, and thermal loads. (H) Foundations and supports shall be protected to have a �re resistance rating of at least 2 hours. (I) If insulation is used to achieve the �re resistance rating of at least 2 hours, it shall be resistant to dislodgment by �re hose streams. 7.5.1.5 Stress concentrations from the support system shall be minimized by the use of such items as pads and load rings. 7.5.1.6 The expansion and contraction of the inner container shall be included in the stress calculations, and the support system shall be designed so that the resulting stresses imparted to the inner and outer containers are within allowable limits. 7.5.1.7 Internal piping between the inner container and the outer container and within the insulation space shall be designed for the maximum allowable working pressure of the inner container, with allowance for thermal stresses. (A) Bellows shall not be permitted within the insulation space. (B) Piping shall be of materials satisfactory for −278°F (−172°C) as determined by the ASME Boiler and Pressure Vessel Code . (C) No liquid line external to the outer container shall be of aluminum, copper, or copper alloy, unless it is protected against a 2-hour �re exposure. (D) Transition joints shall not be prohibited.
7.5.2 Seismic Design of Land-Based Shop-Built Containers. 7.5.2.1 Shop-built containers designed and constructed in accordance with the ASME Boiler and Pressure Vessel Code and their support system shall be designed for the dynamic forces associated with horizontal and vertical accelerations as follows: For horizontal force, V : [7.5.2.1a] V
=
Z c
× W
For design vertical force, P : [7.5.2.1b] P
2 =
3
Z c × W
where: Z c = seismic coef�cient equal to 0.60 S DS , where S DS is the maxi‐ mum design spectral acceleration determined in accord‐ ance with the provisions of ASCE 7, using an importance factor, I , of 1.0, for the site class most representative of the subsurface conditions where the LNG facility is located W = total weight of the container and its contents (A) This method of design shall be used only when the natural period, T , of the shop-built container and its supporting system is less than 0.06 second. (B) For periods of vibration greater than 0.06 second, the method of design in 7.4.4 shall be followed. 7.5.2.2 The container and its supports shall be designed for the resultant seismic forces in combination with the operating loads, using the allowable stress increase shown in the code or standard used to design the container or its supports. 7.5.2.3 The requirements of 7.5.2 shall apply to ASME containers built prior to July 1, 1996, when reinstalled.
2016 Edition
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
PRODUCTION, STORAGE, AND HANDLING OF LIQUEFIED NATURAL GAS (LNG)
59A-28
7.5.2.4 Instrumentation capable of measuring the ground motion to which containers are subjected shall be provided on the site. 7.5.3 Filling Volume. Containers designed to operate at a pressure in excess of 15 psi (103 kPa) shall be equipped with a device(s) that prevents the container from becoming liquid-full or from covering the inlet of the relief device(s) with liquid when the pressure in the container reaches the set pressure of the relieving device(s) under all conditions. 7.5.4 Testing of ASME LNG Containers. 7.5.4.1 Containers designed for gauge pressures in excess of 15 psi [103 kPa] shall be tested in accordance with the follow‐ ing:
(1) Shop-fabricated containers shall be pressure tested by the manufacturer prior to shipment to the installation site. (2) The inner container shall be tested in accordance with the ASME Boiler and Pressure Vessel Code or with CSA B51, Boiler, Pressure Vessel and Pressure Piping Code . (3) The outer container shall be leak tested. (4) Piping shall be tested in accordance with Section 9.7. (5) Containers and associated piping shall be leak tested prior to �lling the container with LNG. 7.5.4.2 The inner container of �eld-fabricated containers designed for gauge pressures in excess of 15 psi [103 kPa] shall be tested in accordance with the ASME Boiler and Pressure Vessel Code or CSA B51. 7.5.4.3 The outer container of �eld-fabricated containers designed for gauge pressures in excess of 15 psi [103 kPa] shall be tested in accordance with the ASME Boiler and Pressure Vessel Code or CSA B51. Chapter 8 Vaporization Facilities ` ` ` , , , , ` , ` ` ` , , , ` ` ` , ` , ` , , ` , ` ` , , ` ` , , ` , , ` , ` , , ` -
8.1* Scope. This chapter presents the design, construction, and installation requirements for LNG vaporizers. 8.2 Classi�cation of Vaporizers. 8.2.1 If the temperature of the naturally occurring heat source of an ambient vaporizer exceeds 212°F (100°C), the vaporizer shall be considered to be a remote heated vaporizer. 8.2.2 If the naturally occurring heat source of an ambient vaporizer is separated from the actual vaporizing heat exchanger and a controllable heat transport medium is used between the heat source and the vaporizing exchanger, the vaporizer shall be considered to be a remote heated vaporizer and the provision for heated vaporizers shall apply. 8.3 Design and Materials of Construction. 8.3.1* Vaporizers shall be designed, fabricated, and inspected in accordance with the ASME Boiler and Pressure Vessel Code , Section VIII. 8.3.2 Vaporizer heat exchangers shall be designed for a work‐ ing pressure at least equal to the maximum discharge pressure of the LNG pump or the pressurized container system supply‐ ing them, whichever is greater.
8.4 Vaporizer Piping, Intermediate Fluid Piping, and Storage Valves. 8.4.1 Manifolded vaporizers shall have both inlet and discharge block valves at each vaporizer. 8.4.2 The discharge valve of each vaporizer and the piping components and relief valves installed upstream of each vapor‐ izer discharge valve shall be designed for operation at LNG temperatures [−260°F (−162°C)]. 8.4.3 Isolation of an idle manifolded vaporizer shall be by two inlet valves. 8.4.3.1 The LNG or gas that can accumulate between the valves or other double-block-and-bleed systems shall be piped to an area having no source of ignition and where people are not present. 8.4.4 A shutoff valve shall be installed on the LNG line to a vaporizer at least 50 ft (15 m) from the vaporizer. 8.4.4.1 If the vaporizer is installed in a building, the shutoff valve shall be installed at least 50 ft (15 m) from the building. 8.4.4.2 The shutoff valve shall be either the container shutoff valve or another valve. 8.4.5 Each heated or process vaporizer shall be provided with a local and a remote device to shut off the heat source. 8.4.5.1 Where the heated or process vaporizer is located 50 ft (15 m) or more from the heat source, the remote shutoff loca‐ tion shall be at least 50 ft (15 m) from the vaporizer. 8.4.5.2* Where the heated vaporizer is located less than 50 ft (15 m) from the heat source, it shall have an automatic, �resafe shutoff valve in the LNG liquid line that closes when any of the following occurs:
(1) Loss of line pressure (excess �ow) (2) Fire in the immediate vicinity of the vaporizer or shutoff valve (3) Low temperature in the vaporizer discharge line 8.4.5.3 If the LNG plant is attended, manual operation of the automatic shutoff valve shall be from a point at least 50 ft (15 m) from the vaporizer, in addition to the requirements in 8.4.5.2. 8.4.6* Any vaporizer installed within 50 ft (15 m) of an LNG container shall be equipped with an automatic, �re-safe shutoff valve in the LNG liquid line. 8.4.6.1 The automatic shutoff valve shall close in any one of the following situations:
(1) Loss of line pressure (excess �ow) (2) Fire in the immediate vicinity of the vaporizer or shutoff valve (3) Low temperature in the vaporizer discharge line 8.4.6.2 If the LNG plant is attended, manual operation of the automatic shutoff valve shall be from a point at least 50 ft (15 m) from the vaporizer, in addition to the requirements of 8.4.6.1. 8.4.7 Automatic equipment shall be provided to prevent the discharge of either LNG or vaporized gas into a piping system at a temperature either above or below the design tempera‐ tures of the system.
2016 Edition
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
PIPING SYSTEMS AND COMPONENTS
8.4.7.1 Automatic equipment shall be independent of all other �ow control systems. 8.4.7.2 Automatic equipment shall incorporate a line valve for emergency purposes. 8.4.8 Where a �ammable intermediate �uid is used with a remote heated or process vaporizer, shutoff valves shall be in accordance with the following:
(1) (2)
Shutoff valves shall be provided on both the hot and the cold lines of the intermediate �uid system. Shutoff valve controls shall be located at least 50 ft (15 m) from the vaporizer.
8.5 Relief Devices on Vaporizers. 8.5.1 The relief valve capacity of heated or process vaporizers shall be selected to provide discharge capacity of 110 percent of rated vaporizer natural gas �ow capacity without allowing the pressure to rise more than 10 percent above the vaporizer maximum allowable working pressure. 8.5.2 The relief valve capacity for ambient vaporizers shall be selected to provide relief valve discharge capacity of at least 150 percent of rated vaporizer natural gas �ow capacity based on standard operating conditions, without allowing the pres‐ sure to rise more than 10 percent above the vaporizer maxi‐ mum allowable working pressure. 8.5.3 Relief valv es on heated vaporizers shall be located so that they are not subjected to temperatures exceeding 140°F (60°C) during normal operation unless the valves are designed to with‐ stand higher temperatures. 8.6 Combustion Air Supply. Combustion air required for the operation of integral heated vaporizers or the primary heat source for remote heated vaporizers shall be taken from outside a completely enclosed structure or building. 8.7 Products of Combustion. Where integral heated vaporiz‐ ers or the primary heat source for remote heated vaporizers are installed in buildings, provisions shall be made to prevent the accumulation of hazardous products of combustion. Chapter 9 Piping Systems and Components 9.1* Scope. This chapter presents the design, construction, installation, examination, and inspection requirements for process piping systems and components. 9.2 General. 9.2.1* Process piping systems within the scope of ASME B 31.3, Process Piping, except those that are part of or within an LNG Container shall be in accordance with ASME B 31.3. 9.2.1.1 The additional provisions of this chapter supplement those in ASME B 31.3 and shall apply to piping systems and components for �ammable liquids and �ammable gases. 9.2.1.2 Fuel gas systems shall be in accordance with NFPA 54 or ASME B 31.3. 9.2.1.3 Fire protection system piping shall meet the applicable NFPA standards in Section 2.2.
59A-29
9.2.2 Seismic Design Requirements. 9.2.2.1 For purposes of design, all piping of the LNG plant shall be classi�ed into one of the following three seismic cate‐ gories:
(1) Category I — All piping supported by the LNG container and piping up to the emergency shutdown valve(s) and �rewater piping (2) Category II — All �ammable gas or LNG process piping (3) Category III — All other piping not included in Catego‐ ries I and II 9.2.2.2 Piping categories shall be in accordance with the following:
(1) Category I — All Category I piping shall be designed for the OBE and SSE event. For the OBE design, response modi�cations shall not be used. (2) Category II — All Category II piping shall be designed for the design earthquake per ASCE 7, Minimum Design Loads for Buildings and Other Structures . At maximum, a response modi�cation factor R p of 6 shall be used. The importance value Ip shall be taken as 1.5. (3) Category III — All Category III piping shall be designed for the design earthquake per ASCE 7. 9.2.2.3 Piping shall be analyzed using an equivalent static anal‐ ysis or a dynamic analysis mee ting the requirements of ASCE 7. The OBE, SSE, and design earthquake loads shall be combined with other loads using the load combination of ASCE 7. The stiffness of pipe supports in the direction of applied restraint shall be included in the pipe stress analysis model unless the supports can be quali�ed as rigid according to the following criteria:
(1) Supports with 12 in. (0.3 m) and larger pipe: minimum support stiffness of 100 kips/in. (1797 kg/mm) in the direction of restraint (2) Supports with 12 in. (0.3 m) and smaller pipe: minimum support stiffness of 10 kips/in. (179.7 kg/mm) in the direction of restraint 9.2.3* Piping systems and components shall be designed to accommodate the effects of fatigue resulting from the thermal cycling to which the systems are subjected. 9.2.4 Provision for expansion and contraction of piping and piping joints due to temperature changes shall be in accord‐ ance with ASME B 31.3, Section 319. 9.3 Materials of Construction. 9.3.1 General. 9.3.1.1 All piping materials, including gaskets and thread compounds, shall be selected for compatibility with the liquids and gases handled throughout the range of temperatures to which they are subjected. 9.3.1.2 Piping, including gasketed joints, that can be exposed to the low temperature of an LNG or refrigerant spill or the heat of an ignited spill during an emergency where such expo‐ sure could result in a failure of the piping that would increase the emergency shall be one of the following:
` , , ` , ` , , ` , , ` ` , , ` ` , ` , , ` , ` , ` ` ` , , , ` ` ` , ` , , , , ` ` ` -
(1) Made of material(s) that can withstand both the normal operating temperature and the extreme temperature to which the piping might be subjected during the emer‐ gency
2016 Edition
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
59A-30
PRODUCTION, STORAGE, AND HANDLING OF LIQUEFIED NATURAL GAS (LNG)
(2) Protected by insulation or other means to delay failure due to such extreme temperatures until corrective action can be taken by the operator (3) Capable of being isolated and having the �ow stopped where piping is exposed only to the heat of an ignited spill during the emergency
(B) Protection against �re exposure shall not be required for liquid lines protected against �re exposure and loading arms and hoses.
9.3.1.3 Piping insulation used in areas where the mitigation of �re exposure is necessary shall have a maximum �ame spread index of 25 when tested in accordance with ASTM E 84, Stand‐ ard Test Method for Surface Burning Characteristics of Building Mate‐ rials, or ANSI/UL 723, Standard for Test for Surface Burning Characteristics of Building Materials, and shall maintain those properties that are necessary to maintain physical and thermal integrity during an emergency when exposed to �re, heat, cold, or water.
9.3.3 Fittings.
9.3.1.4* In addition to 9.3.1.3, pipe insulation assemblies used in areas where the mitigation of �re exposure is necessary shall be one of the following:
(1) Comprised of noncombustible materials per ASTM E 136, Standard Test Method for Behavior of Materials in a Vertical Tube Furnace at 750°C (see Section 4.6) (2) Covered by an outer protective stainless steel jacket at least 0.02 in. (0.51 mm) thick (3) Covered by an outer aluminum jacket at least 0.032 in. (0.81 mm) thick (4) Determined to meet the conditions of acceptance in B.3 of NFPA 274 9.3.2 Piping. 9.3.2.1 Furnace lap-welded and furnace butt-welded pipe shall not be used. 9.3.2.2 All piping material shall either meet the requirements in Chapter III of ASME B 31.3 or conform with ASME B 31.3, paragraphs 323.1.2 and 323.2.3 and be documented in the engineering design. 9.3.2.3 All piping components shall either meet the require‐ ments in Chapter III of ASME B 31.3 or conform with ASME B 31.3, paragraphs 326.1.2 and 326.2.2 and be documented in the engineering design. 9.3.2.4 Threaded pipe shall be at least Schedule 80. 9.3.2.5 A liquid line on a storage container, cold box, or other insulated equipment external to the outer shell or jacket, whose failure can release a signi�cant quantity of �ammable �uid, shall not be made of aluminum, copper or copper alloy, or material with a melting point of less than 2000°F (1093°C). 9.3.2.5.1 Bottom penetration liquid lines on single contain‐ ment tanks with aluminum inner tanks and cold boxes utilizing aluminum heat exchangers shall be permitted to use alumi‐ num piping to the point where the thermal distance piece tran‐ sitions to stainless steel or other materials meeting the requirements of 9.3.2.5. 9.3.2.6 Transition Joints. (A) Transition joints shall be protected against �re exposure. Thermal distance pieces from storage tanks, coldboxes, and similar equipment shall not be insulated if insulation will diminish the effectiveness of the thermal distance piece.
9.3.2.7 Cast iron, malleable iron, and ductile iron pipe shall not be used.
9.3.3.1 Threaded nipples shall be at least Schedule 80. 9.3.3.2 Cast iron, malleable iron, and ductile iron �ttings shall not be used. 9.3.3.3* Bends. (A) Bends shall be permitted only in accordance with ASME B 31.3, Section 332. Corrugated and creased bends shall be prohibited. (B) Field bending shall not be permitted on any 300 series stainless steel or other cryogenic containment materials or components, except instrument tubing with a minimum design temperature less than −20°F (−29°C) unless:
(1) Performed in accordance with the engineering design (2) Performed using mechanical or hydraulic equipment and tools speci�cally designed for bending pipe (3) The examination requirements of paragraphs 332.1 and 332.2.1 in ASME B 31.3 are used to verify each bend (4) All bending and forming of piping material shall meet the requirements of ASME B 31.3, Section 332, except that corrugated and creased bends shall be prohibited 9.3.3.4 Solid plugs or bull plugs made of at least Schedule 80 seamless pipe shall be used for threaded plugs. 9.3.3.5 Compression-type couplings shall not be used where they can be subjected to temperatures below −20°F (−29°C), unless they meet the requirements of ASME B 31.3, Section 315. 9.3.4 Valves. 9.3.4.1 Valves shall comply with one of the following:
(1) ASME B 31.3, paragraph 307.1.1 (2) ASME B 31.5, Refrigeration Piping ; ASME B 31.8, Gas Trans‐ mission and Distribution Piping Systems ; or API 6D, Speci�ca‐ tion for Pipeline Valves, where suitable for the design conditions (3) ASME B 31.3, paragraph 307.1.2, where documented in the engineering design 9.3.4.2 Cast iron, malleable iron, and ductile iron valves shall not be used. 9.4 Installation. 9.4.1 Piping Joints. 9.4.1.1 Pipe joints of 2 in. (50 mm) nominal diameter or less shall be threaded, welded, or �anged. 9.4.1.2 Pipe joints larger than 2 in. (50 mm) nominal diame‐ ter shall be welded or �anged. 9.4.1.3 Tubing joints shall be in accordance with paragraph 315 in ASME B 31.3.
2016 Edition --```,`,```,```,`,`,`,``,-`-`,`,`,`,`---
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
PIPING SYSTEMS AND COMPONENTS
59A-31
nal diameter and through which liquid can escape shall be equipped with at least one of the following:
9.4.1.4 The following pipe joints are prohibited:
(1) Expanded joints per ASME B 31.3, paragraph 313 (2) Caulked joints per ASME B 31.3, paragraph 316 (3) Special joints per ASME B 31.3, paragraph 318
(1)* A valve that closes automatically if exposed to �re (2) A remotely controlled, quick-closing valve that remains closed except during the operating period (3) A check valve on �lling connections
9.4.1.5 Special components that are unlisted per ASME B 31.3 paragraph 304.7.2 shall be based on design calculations consis‐ tent with the design criteria of ASME B 31.3. Calculations shall be substantiated by one or both of the means stated in ASME B 31.3, paragraph 304.7.2 (a), paragraph 304.7.2(b), or b oth.
9.4.2.7 Valves and valve controls shall be designed to allow operation under icing conditions where such conditions can exist.
9.4.1.6 Where necessary for connections to equipment or components, where the connection is not subject to fatigueproducing stresses, joints of 4 in. (100 mm) nominal diameter or less shall be threaded, welded, or �anged.
9.4.2.8 Powered and manual operators shall be provided for emergency shutoff valves 8 in. (200 mm) or larger. 9.4.2.9* Where power-operated valves are installed, the closure time shall not produce a hydraulic shock capable of causing stresses that can result in piping or equipment failure.
9.4.1.7 The number of threaded or �anged joints shall be minimized and used only where necessary, such as at material transitions or instrument connections, or where required for maintenance.
9.4.2.10 A piping system used for periodic transfer of cold �uid shall be provided with a means for precooling before transfer.
9.4.1.8 Where threaded joints are used, they shall be seal welded or sealed by other means proven by test except for the following:
9.4.2.11 Check valves shall be installed in designated onedirectional transfer systems to prevent back�ow and shall be located as close as practical to the point of connection to any system from which back�ow might occur.
(1)
Instrument connections where the heat from welding would cause damage to the instrument (2) Where seal welding would prevent access for mainte‐ nance (3) Material transitions where seal welding is not practical
9.4.3 Welding and Brazing. All pressure containment, ASME B 31.3 piping, and component welding and brazing in or for any LNG facility shall be in accordance to Section IX of the ASME Boiler and Pressure Vessel Code .
9.4.1.9 Dissimilar metals shall be joined by �anges or transi‐ tion joint techniques that have been proven by test at the inten‐ ded service conditions.
9.4.3.1 Quali�cation and performance of welders shall be in accordance with subsection 328.2 of ASME B 31.3, and 9.4.3.2 of this standard.
9.4.1.10 Where gaskets are subject to �re exposure, they shall be resistant to �re exposure. 9.4.2* Valves.
9.4.3.2 For the welding of impact-tested materials, quali�ed welding procedures shall be selected to minimize degradation of the low-temperature properties of the pipe material.
9.4.2.1 Extended bonnet valves shall be installed with packing seals in a position that prevents leakage or malfunction due to freezing.
9.4.3.3 For the welding of attachments to unusually thin pipe, procedures and techniques shall be selected to minimize the danger of burn-through.
9.4.2.2 Where the extended bonnet in a cryogenic liquid line is installed at an angle greater than 45 degrees from the upright vertical position, it shall be demonstrated to be free of leakage and frost under operating conditions.
9.4.3.4 Oxygen–fuel gas welding shall not be permitted. 9.4.3.5 Brazing and brazed connections shall be in accordance with subsections 317.2 and 333 of ASME B 31.3. 9.4.3.6 Brazed connections which are part of an ASME B 31.3 piping system shall be limited to a minimum service tempera‐ ture of −20°F (−29°C) and warmer. The system shall be in accordance with Appendix G, Safeguarding, of ASME B 31.3. Brazed connections used for service temperatures colder than −20°F (−29°C) shall be speci�ed in the engineering design and approved by the operator.
9.4.2.3 Shutoff valves shall be installed on container, tank, and vessel connections, except for the following:
(1)
Connections for relief valves in accordance with the ASME Boiler and Pressure Vessel Code , Section VIII, Division 1, UG-125(d) and Appendix M-5 (2) Connections for liquid level alarms as required by 10.2.1.3 or 13.15.2 if an ASME container (3) Connections that are blind �anged or plugged
9.4.4* Pipe Marking. Markings on pipe shall comply with the following:
9.4.2.4 Shutoff valves shall be located inside the impound‐ ment area as close as practical to such containers, tanks, and vessels where provided.
(1) Markings shall be made with a material compatible with the pipe material. (2) Materials less than 1 ∕ 4 in. (6.4 mm) in thickness shall not be die stamped. (3) Marking materials that are corrosive to the pipe material shall not be used.
9.4.2.5 The design and installation of an internal valve shall be such that any failure of the penetrating nozzle resulting from external pipe strain is beyond the shutoff seats of the internal valve itself.
9.5 Pipe Supports.
9.4.2.6 In addition to the container shutoff valve required in 9.4.2.3, container connections larger than 1 in. (25 mm) nomi‐
9.5.1 Pipe supports, including any insulation systems used to support pipe whose stability is essential to plant safety, shall be
2016 Edition --```,`,```,```,`,`,`,``,-`-`,`,`,`,`---
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
59A-32
PRODUCTION, STORAGE, AND HANDLING OF LIQUEFIED NATURAL GAS (LNG)
resistant to or protected against �re exposure, escaping cold liquid, or both, if they are subject to such exposure. 9.5.2 Pipe supports for cold lines shall be designed to mini‐ mize heat transfer, which can result in piping failure by ice formations or embrittlement of supporting steel. 9.5.3 The design of supporting elements shall conform to ASME B 31.3, Section 321. 9.6* Piping Identi�cation. Piping shall be identi�ed by color coding, painting, or labeling. 9.7 Inspection, Examination, and Testing of Piping. Inspec‐ tion, examination, and testing shall be performed in accord‐ ance with Chapter VI of ASME B 31.3 to demonstrate sound construction, installation and leak tightness. Unless speci�ed otherwise in the engineering design, piping systems for �am‐ mable liquids and �ammable gases shall be examined and tested per the requirements of ASME B 31.3, Normal Fluid Service. 9.7.1 Leak Testing. 9.7.1.1 Leak testing shall be conducted in accordance with ASME B 31.3, Section 345. 9.7.1.2 To avoid possible brittle failure, carbon and low-alloy steel piping shall be leak tested at metal temperatures suitably above their nil ductility transition t emperature. 9.7.2 Record Keeping. 9.7.2.1 A record of each leak test shall be made per paragraph 345.2.7 of ASME B 31.3. 9.7.3 Welded Pipe Examinations. 9.7.3.1 Longitudinal welded pipe that is subjected to mini‐ mum design temperatures below −20°F (−29°C) shall meet the following requirement:
(1) The longitudinal or spiral weld shall be subjected to 100 percent radiographic examination in accordance with paragraph 302.3.4 and Table A-1B of ASME B 31.3 to provide a basic longitudinal weld joint Quality Factor E j of 1.0 or as allowed in Table 302.3.4 for E j equal to 1.0. 9.7.3.2 All circumferential butt-and-miter groove welds and branch connection welds comparable to Figure 328.5.4E in ASME B 31.3 subjected to minimum design temperatures below −20°F (−29°C) shall be examined fully by radiographic or ultrasonic examination in accordance with Chapter VI, Sections 341 and 344, of ASME B 31.3 except as modi�ed by 9.7.3.2(A) and 9.7.3.2(B). (A) Liquid drain and vapor vent piping with an operating pressure that produces a hoop stress of less than 20 percent speci�ed minimum yield stress shall not be required to be nondestructively tested if it has been inspected visually in accordance with ASME B 31.3, subsection 344.2. (B) Piping with minimum design temperature at or above -20°F (-29°C) shall have random 20 percent radiographic or ultrasonic examination of circumferential butt-and-miter groove welds and branch connection welds comparable to Figure 328.5.4E in accordance with Chapter VI, Sections 341 and 344 of ASME B 31.3.
internal and external attachment welds, shall be 100 percent examined visually and by liquid penetrant or magnetic particle examination in accordance with Chapter VI, Sections 341 and 344, of ASME B 31.3. 9.7.3.4* All branch connection welds not radiographed or ultrasonically examined, shall be 100 percent examined per ASME B 31.3, Chapter VI, Sections 341 and 344, as follows:
(1) For piping with design temperatures below −20°F (−29°C), all branch connections shall be 100 percent visu‐ ally examined and by liquid penetrant or magnetic parti‐ cle examination. (2) For piping with design temperatures at or above −20°F (−29°C), all branch connections shall be 100 percent visu‐ ally examined. 9.7.4 Examination Criteria. 9.7.4.1 Nondestructive examination methods, limitations on defects, and the quali�cations of the personnel performing and interpreting the examinations shall meet the requirements of ASME B 31.3, Chapter VI, Sections 341 through 344, and the following:
(1) The requirements of Normal Fluid Service shall apply as a minimum for examination acceptance criteria, unless speci�ed otherwise in the engineering design. (2) Personnel performing nondestructive examinations (NDE) shall, as a minimum, be quali�ed Level I per ASNT SNT-TC-1A, Personnel Quali�cation and Certi�cation in Nondestructive Testing, or an equivalent quali�cation standard. (3) Personnel interpreting nondestructive examinations shall, as a minimum, be quali�ed Level II per ASNT SNTTC-1A or an equivalent quali�cation standard. (4) NDEs shall be performed in accordance with written procedures meeting all the requirements of ASME Boiler and Pressure Vessel Code , Section V, as applicable to the speci�c NDE method. 9.7.4.2 Substitution of in-process examination for radio‐ graphic or ultrasonic examination as permitted in ASME B 31.3, Paragraph 341.4.1, shall be permitted on a weld-for-weld basis only if speci�ed in the engineering design, speci�cally approved by the operator, and supplemented by the following additional nondestructive examinations:
(1) 100 percent liquid penetrant or magnetic particle exami‐ nation shall be performed at the lesser of one-half the weld thickness or each 1 ∕ 2 in. (12.5 mm) of weld thickness. (2) 100 percent liquid penetrant or magnetic particle exami‐ nation shall be performed on all accessible �nal weld surfaces. 9.7.5 Record Retention. 9.7.5.1 Test and examination records and written procedures required within this standard and within ASME B 31.3, Para‐ graph 345.2.7 and Section 346 respectively, shall be maintained for the life of the piping system by the facility operator or until such time as a re-examination is conducted. 9.7.5.2 Records and certi�cation pertaining to materials, components, and heat treatment as required by ASME B 31.3, Paragraph 341.4.1(c), 341.4.3(d), and Section 346 shall be maintained by the facility operator for the life of the system.
9.7.3.3 All socket welds and �llet welds, for piping with a design minimum temperature below −20°F (−29°C), including
2016 Edition
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
` , , ` , ` , , ` , , ` ` , , ` ` , ` , , ` , ` , ` ` ` , , , ` ` ` , ` , , , , ` ` ` -
PIPING SYSTEMS AND COMPONENTS
9.8 Purging of Piping Systems. 9.8.1 Blow-down and purge connections shall be provided to facilitate purging of all process piping and all �ammable gas piping. 9.9 Safety and Relief Valves. 9.9.1 Pressure-relieving safety devices shall be arranged so that the possibility of damage to piping or appurtenances is reduced to a minimum. 9.9.1.1 Safety relief systems (piping and valves) shall be designed, installed, and tested in accordance with ASME B 31.3, subsection 322.6, and Section 9.9 of this standard in its entirety. 9.9.2 The means for adjusting relief valve set pressure shall be sealed. 9.9.3 A thermal expansion relief valve shall be installed to prevent overpressure in any section of a liquid or cold vapor pipeline that can be isolated by valves. 9.9.3.1 A thermal expansion relief valve shall be set to discharge at or below the design pressure of the line it protects. 9.9.3.2 Discharge from thermal expansion relief valves shall be directed to minimize hazard to personnel and other equip‐ ment. 9.10 Corrosion Control. 9.10.1* Underground and submerged piping shall be protec‐ ted and maintained in accordance with the principles of NACE SP 0169, Control of External Corrosion of Underground or Submerged Metallic Piping Systems. 9.10.2 Austenitic stainless steels and aluminum alloys shall be protected to minimize corrosion and pitting from corrosive atmospheric and industrial substances during storage, construction, fabrication, testing, and service. 9.10.2.1 Tapes or other packaging materials that are corrosive to the pipe or piping components shall not be used. 9.10.2.2 Where insulation materials can cause corrosion of aluminum or stainless steels, inhibitors or waterproof barriers shall be utilized. 9.11 Cryogenic Pipe-in-Pipe Systems. 9.11.1 General. The design of cryogenic pipe shall address the following issues:
(1)
Seismic, geotechnical concerns, installation, and the concern that the pipe be designed to per form its function without failure (2) Dynamic loading and static loading conditions of both the inner and outer pipes (3) Maximum relative motion between the inner and outer pipes 9.11.2 Inner Pipe. The inner pipe assembly shall be designed, fabricated, examined, and tested in accordance with ASME B 31.3, and inspection levels shall be speci�ed. As a minimum, Normal Fluid Service requirements shall be met, unless speci‐ �ed otherwise in the engineering design.
59A-33
9.11.3 Outer Pipe. The outer pipe assembly shall be designed, fabricated, examined, and tested in accordance with the requirements of ASME B 31.3. 9.11.3.1 As a minimum, Normal Fluid Service requirements shall be met, unless speci�ed otherwise in the engineering design. 9.11.3.2 If the outer pipe also functions as the secondary containment system, the outer pipe shall be designed to contain the inner pipe product and shall be designed, fabrica‐ ted, examined, and tested in accordance with the requirements of ASME B 31.3. 9.11.4 Vacuum-Jacketed Function. If the outer pipe functions as a vacuum-jacketed system, then failure of the outer pipe shall not damage the inner pipe. 9.11.4.1 If the outer jacket functions as the secondary contain‐ ment system, the outer pipe jacket shall be designed to with‐ stand and carry the full inner pipe product and shall be designed, fabricated, examined, and tested in accordance with the requirements of ASME B 31.3. 9.11.5 Annular Space. The annular space and inner pipe support system shall be designed to minimize thermal conduc‐ tance and heat loss. 9.11.5.1 All components in the annular space shall be selected to minimize long-term degradation of the insulation system. 9.11.5.2 The vacuum level, if any, shall be speci�ed. 9.11.6 Operational Requirements. 9.11.6.1 If the pipe-in-pipe is vacuum-jacketed, provisions shall be made to allow veri�cation of vacuum levels and methods of reapplication of vacuum. If the pipe-in-pipe is not vacuum jacketed, provision shall be made to allow circulation of inert gas in the annulus. 9.11.6.2 Provisions shall be made for temperature monitoring. (A) Where the pipe-in-pipe is a vacuum-jacketed pipe, the temperature of the outer skin of the vacuum jacket shall be monitored. (B) Where the pipe-in-pipe is not vacuum jacketed, the temperature in the annulus shall be monitored. (C) Visual inspection shall be acceptable for aboveground installations. 9.11.7 Connections. Mechanical connectors shall be designed to maintain the thermal, structural, and installation conditions present on the pipe segments it is connecting. 9.11.8* Corrosion Protection. 9.11.8.1 The inner pipe and the annular space shall be consid‐ ered to be noncorroding in its operating environment. 9.11.8.2 The outer pipe shall be designed or protected in accordance with NACE standards to mitigate potential corro‐ sion. 9.11.9 Installation. 9.11.9.1 Pipe, when buried on land, shall be buried to a mini‐ mum of 3 ft (0.9 m) of cover. 9.11.9.2 Pipe, when buried in navigable waterways should be buried to minimum depth of 4 ft (1.2 m) of cover. 2016 Edition --```,`,```,```,`,`,`,``,-`-`,`,`,`,`---
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
59A-34
PRODUCTION, STORAGE, AND HANDLING OF LIQUEFIED NATURAL GAS (LNG)
9.11.9.3 The engineering design of buried pipe in navigable waters shall evaluate, and where necessary implement addi‐ tional cover to minimize the possibility of damage due to anchor drop or drag and ship grounding events.
10.5.2 Temperature-monitoring systems shall be provided where foundations supporting cryogenic containers and equip‐ ment could be affected adversely by freezing or frost heaving of the ground.
10.1 Scope. This chapter covers the requirements for instru‐ mentation, controls, and electrical requirements for the LNG facility.
10.6 Emergency Shutdown. Instrumentation for liquefaction, storage, and vaporization facilities shall be designed so that, in the event that power or instrument air failure occurs, the system will proceed to a fail-safe condition that is maintained until the operators can take action either to reactivate or to secure the system.
10.2 Liquid Level Gauging.
10.7 Electrical Equipment.
10.2.1 LNG Containers.
10.7.1 Electrical equipment and wiring shall be in accordance with NFPA 70 or CSA C22.1, Canadian Electrical Code .
Chapter 10 Instrumentation and Electrical Services
10.2.1.1 LNG containers shall be equipped with two inde‐ pendent liquid level gauging devices that compensate for varia‐ tions in liquid density. 10.2.1.2 Gauging devices shall be designed and installed so that they can be replaced without taking the container out of operation. 10.2.1.3 Each container shall be provided with two independ‐ ent high-liquid-level alarms, which shall be permitted to be part of the liquid level gauging devices. (A) The alarm shall be set so that the operator can stop the �ow without exceeding the maximum permitted �lling height and shall be located so that they are audible to personnel controlling the �lling.
10.7.2* Fixed electrical equipment and wiring installed within the classi�ed areas speci�ed in Table 10.7.2 shall comply with Table 10.7.2 and Figure 10.7.2(a) through Figure 10.7.2(f) and shall be installed in accordance with NFPA 70 . 10.7.3 Electrically classi�ed areas shall be as speci�ed in Table 10.7.2. (A) The extent of the electrically classi�ed area shall not extend beyond an unpierced wall, roof, or solid vaportight partition. (B) The extent of the electrically classi�ed areas shall be meas‐ ured in accordance with Table 10.7.2.
(B) The high-liquid-level �ow cutoff device required in 10.2.1.4 shall not be considered as a substitute for the alarm. 10.2.1.4 The LNG container shall be equipped with a highliquid-level �ow cutoff device, which shall be separate from all gauges.
Sphere having radius of 15 ft (4.5 m)— Division 2 Sphere having radius of 5 ft (1.5 m)—Division 1
10.2.2 Tanks for Refrigerants or Flammable Process Fluids. 10.2.2.1 Each storage tank shall be equipped with a liquid level gauging device.
Horizontal equator of sphere
10.2.2.2 If it is possible to over�ll the tank, a high-liquid-level alarm shall be provided in accordance with 10.2.1.3.
Point of connection or source of excessive release of liquid or gas
Grade level
10.2.2.3 The requirements of 10.2.1.4 shall apply to installa‐ tions of �ammable refrigerants. 10.3 Pressure Gauging. Each container shall be equipped with a pressure gauge connected to the container at a point above the maximum intended liquid level.
Cylindrical volume— Division 2 [includes bottom half of 15 ft (4.5 m) radius sphere]
10.4 Vacuum Gauging. Vacuum-jacketed equipment shall be equipped with instruments or connections for checking the absolute pressure in the annular space.
FIGURE 10.7.2(a) Containers.
10.5 Temperature Indicators. Temperature-monitoring devi‐ ces shall be provided in �eld-erected containers to assist in controlling temperatures when the container is placed into service or as a method of checking and calibrating liquid level gauges. 10.5.1 Vaporizers shall be provided with indicators to monitor inlet and outlet temperatures of LNG, vaporized gas, and heating-medium �uids to ensure effectiveness of the heat trans‐ fer surface.

Extent of Classi�ed Area Around
Area within 5 ft (1.5 m) of relief valve
x
15 ft (4.5 m)
x
Container
H
Belowgrade pit or trench
H
Division 1 Division 2
FIGURE 10.7.2(b) Dike Height Less Than Distance from Container to Dike ( H < x ). 2016 Edition ` ` ` , , , , ` , ` ` ` , ,
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
INSTRUMENTATION AND ELECTRICAL SERVICES
59A-35
Table 10.7.2 Electrical Area Classi�cation
Part A
B
Group D, Divisiona
Location LNG storage containers with vacuum breakers Inside containers LNG storage container area Indoors Outdoor aboveground containers (other than small containers)b
2
Entire container interior
1 1
Entire room Open area between a high-type dike and the container wall where dike wall height exceeds distance between dike and container walls [see Figure 10.7.2(c)] Within 15 ft (4.5 m) in all directions from container walls and roof plus area inside a low-type diked or impounding area up to the height of the dike impoundment wall [see Figure 10.7.2(b)] Within any open space between container walls and surrounding grade or dike [seeFigure 10.7.2(d).] Within 15 ft (4.5 m) in all directions from roof and sides [see Figure 10.7.2(d).]
2
Outdoor belowground containers
1 2
C
D
E
F
Non�red LNG process areas containing pumps, compressors, heat exchangers, pipelines, connections, small containers, and so forth
Indoors with adequate ventilationc
2
Outdoors in open air at or above grade
2
Entire room and any adjacent room not separated by a gastight partition and 15 ft (4.5 m) beyond any wall or roof ventilation discharge vent or louver Within 15 ft (4.5 m) in all directions from this equipment and within the cylindrical volume between the horizontal equator of the sphere and grade [See Figure 10.7.2(a).]
Pits, trenches, or sumps located in or adjacent to Division 1 or 2 areas
1
Entire pit, trench, or sump
2
Within 15 ft (4.5 m) in all directions, above grade [see Figure 10.7.2(a)]
1
Within 5 ft (1.5 m) in all directions from point of discharge
2
Beyond 5 ft (1.5 m) but within 15 ft (4.5 m) in all directions from point of discharge
1
Within 5 ft (1.5 m) in all directions from point of discharge Beyond 5 ft (1.5 m) and entire room and 15 ft (4.5 m) beyond any wall or roof ventilation discharge vent or louver Within 5 ft (1.5 m) in all directions from point of discharge Beyond 5 ft (1.5 m) but within 15 ft (4.5 m) in all directions from point of discharge
Discharge from relief valves
Operational bleeds, drips, vents, or drains Indoors with adequate ventilationc
2 Outdoors in open air at or above grade
1 2
G
Extent of Classi�ed Area
Tank car, tank vehicle, and container loading and unloading Indoors with adequate ventilationc
1 2
Within 5 ft (1.5 m) in all directions from connections regularly made or disconnected for product transfer Beyond 5 ft (1.5 m) and entire room and 15 ft (4.5 m) beyond any wall or roof ventilation discharge vent or louver (continues)
2016 Edition --```,`,```,```,`,`,`,``,-`-`,`,`,`,`---
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
PRODUCTION, STORAGE, AND HANDLING OF LIQUEFIED NATURAL GAS (LNG)
59A-36
Table 10.7.2
Continued
Location
Group D, Divisiona
Outdoors in open air at or above grade
1
Part
Extent of Classi�ed Area
Within 5 ft (1.5 m) in all directions from connections regularly made or disconnected for product transfer Beyond 5 ft (1.5 m) but within 15 ft (4.5 m) in all directions from a point where connections are regularly made or disconnected and within the cylindrical volume between the horizontal equator of the sphere and grade [see Figure 10.7.2(a)]
2
H
Electrical seals and vents speci�ed in 10.7.5 through 10.7.7
2
I
Marine terminal unloading areas [see Figure 10.7.2(f).]
2
Within 15 ft (4.5 m) in all directions from the equipment and within the cylindrical volume between the horizontal equator of the sphere and grade Within 15 ft (4.5 m) in all directions, above the deck, from the open sump
a
See Article 500 in NFPA 70 for de�nitions of classes, groups, and divisions. Article 505 can be used as an alternate to Article 500 for classi�cation of hazardous areas using an equivalent zone classi�cation to the division classi�cations speci�ed in Table 10.7.2. Most of the �ammable vapors and gases found within the facilities covered by NFPA 59A are classi�ed as Group D. Ethylene is classi�ed as Group C. Much of the available electrical equipment for hazardous locations is suitable for both groups. b Small containers are portable and of less than 200 gal (760 L) capacity. c Ventilation is considered adequate where provided in accordance with the provisions of this standard.
10.7.4 When electrical equipment is installed with enclosures residing in electrically classi�ed areas per 10.7.2, the enclosures either shall be rated for that area classi�cation or shall be in accordance with NFPA 496. 10.7.5 The interior of an LNG container shall not be a classi‐ �ed area where the following conditions are met:
(1) Electrical equipment is de-energized and locked out until the container is purged of air. (2) Electrical equipment is de-energized and locked out prior to allowing air into t he container. (3) The electrical system is designed and operated to deenergize the equipment automatically when the pressure in the container is reduced to atmospheric pressure. 10.7.6 Each interface between a �ammable �uid system and an electrical conduit or wiring system, including process instru‐ mentation connections, integral valve operators, foundation heating coils, canned pumps, and blowers, shall be sealed or isolated to prevent the passage of �ammable �uids to another portion of the electrical installation. 10.7.6.1 Each seal, barrier, or other means used to comply with 10.7.6 shall be designed to prevent the passage of �amma‐ ble �uids through the conduit, stranded conductors, and cables. 10.7.6.2 A primary seal shall be provided between the �amma‐ ble �uid system and the electrical conduit wiring system. (A) If the failure of the primary seal allows the passage of �ammable �uids to another portion of the conduit or wiring system, an additional approved seal, barrier, or other means shall be provided to prevent the passage of the �ammable �uid beyond the additional device or means if the primary seal fails. (B) Each primary seal shall be designed to withstand the serv‐ ice conditions to which it can be exposed. (C) Each additional seal or barrier and interconnecting enclo‐ sure shall be designed to meet the pressure and temperature requirements of the condition to which it could be exposed in
Area within 5 ft (1.5 m) of relief valve
15 ft (4.5 m) Division 1 Container
H x
FIGURE 10.7.2(c) Dike Height Greater Than Distance from Container to Dike ( H > x ). Area within 5 ft (1.5 m) of relief valve 15 ft (4.5 m) Grade
Dike
Container Division 1 Division 2
FIGURE 10.7.2(d) Container with Liquid Level Below Grade or Below Top of Dike.
the event of failure of the primary seal unless other approved means are provided to accomplish the purpose. 10.7.6.3 Secondary Seal. (A) Where secondary seals are used, the space between the primary and secondary seals shall be continuously vented to the atmosphere. (B) Similar provisions to 10.7.6.3(A) shall be made on doubleintegrity primary sealant systems of the type used for submerged motor pumps. (C) The requirements of 10.7.6.3(A) shall apply to doubleintegrity primary sealant systems.
2016 Edition
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
Division 2
Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
` , , ` , ` , , ` , , ` ` , , ` ` , ` , , ` , ` , ` ` ` , , , ` ` ` , ` , , , , ` ` ` -
TRANSFER SYSTEMS FOR LNG, REFRIGERANTS, AND OTHER FLAMMABLE FLUIDS
for cathodic protection), protective measures to prevent igni‐ tion shall be taken.
15 ft (4.5 m) radius from relief valve 5 ft (1.5 m) radius from relief valve
15 ft (4.5 m) radius all around
10.8.4* Lightning protection ground rods shall be provided for tanks supported on nonconductive foundations.
Class 1 Group D Division 1 Container
FIGURE 10.7.2(e) Systems.
Chapter 11 Transfer Systems for LNG, Refrigerants, and Other Flammable Fluids
Class 1 Group D Division 2
Grade
Full and Membrane Containment Tank
10.7.6.4 The seals speci�ed in 10.7.6 and 10.7.7 shall not be used to meet the conduit sealing requirements of NFPA 70 or CSA C22.1. ` ` ` , , , , ` , ` ` ` , , , ` ` ` , ` , ` , , ` , ` ` , , ` ` , , ` , , ` , ` , , ` -
10.7.7 Where primary seals are installed, drains, vents, or other devices shall be provided to detect �ammable �uids and leakage. 10.7.8 The venting of a conduit system shall minimize the possibility of damage to personnel and equipment if a �amma‐ ble gas–air mixture is ignited. 10.8 Electrical Grounding and Bonding. 10.8.1* General. Electrical grounding and bonding shall be provided. 10.8.2 Static protection shall not be required where tank cars, tank vehicles, or marine equipment are loaded or unloaded and where both halves of metallic hose couplings or pipe are in contact. 10.8.3* If stray currents can be present or if impressed currents are used on loading and unloading systems (such as 50 ft (15.2 m) 25 ft (7.6 m)
15 ft (4.5 m)
59A-37
11.1 Scope. This chapter applies to the design, construction, and installation of systems involved in the transfer of LNG, refrigerants, �ammable liquids, and �ammable gases between storage containers or tanks and points of receipt or shipment by pipeline, tank car, tank vehicle, or marine vessel. 11.2 General Requirements. 11.2.1 Loading and unloading areas shall be posted with signs that read “No Smoking.” 11.2.2 Where multiple products are loaded or unloaded at the same location, loading arms, hoses, or manifolds shall be iden‐ ti�ed or marked to indicate the product or products to be handled by each system. 11.2.3 Purging of systems described in Section 11.1, when necessary for operations or maintenance, shall meet the requirements in 14.5.5. 11.3 Piping System. 11.3.1 Isolation valves shall be installed at the extremity of each transfer system. 11.4 Pump and Compressor Control. 11.4.1 In addition to a locally mounted device for shutdown of the pump or compressor drive, a readily accessible, remotely located device shall be provided a minimum of 25 ft (7.6 m)
50 ft (15.2 m) 25 ft (7.6 m)
Deck
15 ft (4.5 m)
25 ft (7.6 m) Operating envelope and stored position of loading arms or hose
Open sump in deck for draining lines and hose
Key: Division 1
Division 2
Nonclassified
50 ft (15.2 m) Notes: (1) The 'source of vapor' is the operating envelope and stored position of the outboard flange connection of the loading arm (or hose). (2) The berth area adjacent to tanker and barge cargo tanks is to be Division 2 to the following extent: (a) 25 ft (7.6 m) horizontally in all directions on the pier side from the portion of the hull containing cargo tanks. (b) From the water level to 25 ft (7.6 m) above the cargo tanks at their highest position. (3) Additional locations can be classified as required by the presence of other sources of flammable liquids on the berth, or by Coast Guard or other regulations.
2 ft (610 mm) 25 ft (7.6 m)
Approach
Pier
Shore
Water level
FIGURE 10.7.2(f)
Classi�cation of a Marine Terminal Handling LNG. 2016 Edition
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
PRODUCTION, STORAGE, AND HANDLING OF LIQUEFIED NATURAL GAS (LNG)
59A-38
away from the equipment to shut down the pump or compres‐ sor in an emergency. 11.4.2 Remotely located pumps and compressors used for loading or unloading tank cars, tank vehicles, or marine vessels shall be provided with controls to stop their operation that are located at the loading or unloading area and at the pump or compressor site. 11.4.3 Controls located aboard a marine vessel shall be consid‐ ered to be in compliance with 11.4.2. 11.4.4 Signal lights shall be provided at the loading or unload‐ ing area to indicate whether a remotely located pump or compressor used for loading or unloading is idle or in opera‐ tion. 11.5 Marine Shipping and Receiving. 11.5.1 Berth Design Requirements. 11.5.1.1 The design of piers, docks, wharves, and jetties shall incorporate the following:
(1) (2) (3) (4) (5) (6)
` ` ` , , , , ` , ` ` ` , , , ` ` ` , ` , ` , , ` , ` ` , , ` ` , , ` , , ` , ` , , ` -
(7) (8) (9) (10) (11) (12)
Wave characteristics Wind characteristics Prevailing currents Tidal ranges Water depth at the berth and in the approach channel Maximum allowable absorbed energy during berthing and maximum face pressure on the fenders Arrangement of breasting dolphins Vessel approach velocity Vessel approach angle Minimum tug requirements, including horsepower Safe working envelope of the loading/unloading arms Arrangement of mooring dolphins
11.5.2 Piping (or Pipelines). 11.5.2.1 Pipelines shall be located on the dock or pier so that they are not exposed to damage from vehicular traf�c or other possible causes of physical damage. 11.5.2.2 Underwater pipelines shall be located or protected so that they are not exposed to damage from marine traf�c, and their location shall be posted or identi�ed. 11.5.2.3 Isolation valving and bleed connections shall be provided at the loading or unloading manifold for both liquid and vapor return lines so that hoses and arms can be blocked off, drained or pumped out, and depressurized before discon‐ necting. (A) Liquid isolation valves, regardless of size, and vapor valves 8 in. (200 mm) and larger shall be equipped with powered operators in addition to a means for manual operation. (B) Power-operated valves shall be capable of being closed both locally and from a remote control station located at least 50 ft (15 m) from the manifold area. (C) Unless the valve automatically fails closed on loss of power, the valve actuator and its power supply within 50 ft (15 m) of the valve shall be protected against operational fail‐ ure due to a �re exposure of at least a 10-minute duration. (D) Valves shall be located at the point of hose or arm connec‐ tion to the manifold. (E) Bleeds or vents shall discharge to a safe area.
11.5.2.4 In addition to the isolation valves at the manifold, each vapor return and liquid transfer line shall have a readily accessible isolation valve located on shore near the approach to the waterway, dock, or pier. (A) Where more than one line is involved, the valves shall be grouped in one location. (B) Valves shall be identi�ed for their service. (C) Valves 8 in. (200 mm) and larger shall be equipped with powered operators. (D) Means for manual operation shall be provided. 11.5.2.5 Pipelines used only for liquid unloading shall be provided with a check valve located at the manifold adjacent to the manifold isolation valve. 11.5.2.6 Marine terminals used for loading ships or barges shall be equipped with a vapor return line designed to connect to the vessel's vapor return connections. 11.5.3* Emergency Shutdown System. Each marine LNG transfer system shall have an emergency shutdown (ESD) system that does the following:
(1) Can be activated manually (2) Provides a system for a coordinated safe shutdown of all relevant LNG transfer components on the vessel, at the berth, and within the LNG plant 11.6 Tank Vehicle and Tank Car Loading and Unloading Facili‐ ties. 11.6.1 Transfer shall be made only into tank cars approved for the service. 11.6.2 Tank vehicles not under the jurisdiction of the DOT shall comply with the following standards:
(1) LNG tank vehicles shall comply with CGA 341, Standard for Insulated Cargo Tank Speci�cation for Cryogenic Liquids . (2) LP-Gas tank vehicles shall comply with NFPA 58. (3) Flammable liquid tank vehicles shall comply with NFPA 385. 11.6.3 A rack structure, if provided, shall be constructed of a noncombustible material. 11.6.4 A tank vehicle loading and unloading area shall be of suf�cient size to accommodate the vehicles without excessive movement or turning of the vehicles. 11.6.5 Transfer piping, pumps, and compressors shall be loca‐ ted or protected by barriers so that they are protected from damage by rail or vehicle movements. 11.6.6 Isolation valves and bleed connections shall be provi‐ ded at the loading or unloading manifold for both liquid and vapor return lines so that hoses and arms can be blocked off, drained of liquid, and depressurized before disconnecting. 11.6.7 Bleeds or vents shall discharge to a safe area. 11.6.8 In addition to the isolation valving at the manifold, an emergency shutdown valve shall be provided in each liquid and vapor line at least 25 ft (7.6 m) but not more than 100 ft (30 m) from each loading or unloading area. 11.6.8.1 Emergency valves shall be readily accessible for emer‐ gency use.
2016 Edition
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
FIRE PROTECTION, SAFETY, AND SECURITY
11.6.8.2 Where a common line serves multiple loading or unloading areas, only one emergency valve shall be required. 11.6.8.3 Where the loading or unloading area is closer than 25 ft (7.6 m) to the sending or receiving container, a valve that can be operated remotely from a point 25 ft to 100 ft (7.6 m to 30 m) from the area shall be installed. 11.6.9 Pipelines used only for liquid unloading shall have a check valve at the manifold adjacent to the manifold isolation valve. 11.7 Pipeline Shipping and Receiving. 11.7.1 Isolation valves shall be installed at all points where transfer systems connect into pipeline systems. 11.7.2 The pipeline system shall be designed so that it cannot exceed its temperature or pressure limits. 11.7.3 Where multiple products are loaded or unloaded at the same location, loading arms, hoses, and manifolds shall be identi�ed or marked to indicate the product or products to be handled by each system. 11.7.4 Bleed or vent connections shall be provided so that loading arms and hoses can be drained and depressurized prior to disconnecting. 11.7.5 If vented to a safe location, gas or liquid shall be permitted to be vented to the atmosphere to assist in transfer‐ ring the contents of one container to another. 11.8 Hoses and Arms. 11.8.1 Hoses or arms used for transfer shall be designed for the temperature and pressure conditions of the loading or unloading system. 11.8.2 Hoses shall be approved for the service and shall be designed for a bursting pressure of at least �ve times the work‐ ing pressure. 11.8.3 Flexible metallic hose or pipe and swivel joints shall be used where operating temperatures can be below −60°F (−51°C). 11.8.4 Loading arms used for marine loading or unloading shall have alarms to indicate that the arms are approaching the limits of their extension envelopes. 11.8.5 Counterweights shall be selected to operate with ice formation on uninsulated hoses or arms. 11.8.6 Hoses shall be tested at least annually to the maximum pump pressure or relief valve setting and shall be inspected visually before each use for damage or defects. 11.8.7 Marine loading or unloading operations shall be peri‐ odically tested as required by the authority having jurisdiction. 11.9 Communications and Lighting. 11.9.1 Communications shall be provided at loading and unloading locations to allow the operator to be in contact with other personnel associated with the loading or unloading oper‐ ation. 11.9.2 Facilities transferring LNG during hours of darkness shall have lighting at the transfer area.
59A-39
11.9.3 The LNG marine transfer area for LNG shall have a ship-to-shore communication system and a separate emergency ship-to-shore communication system. 11.9.4 The communication system required in 11.9.3 shall be continuously monitored both aboard ship and at the terminal. Chapter 12 Fire Protection, Safety, and Security 12.1 Scope. 12.1.1 This chapter covers equipment and procedures designed to minimize the consequences from released LNG, �ammable refrigerants, �ammable liquids, and �ammable gases in facilities constructed and arranged in accordance with this standard. 12.1.2 The provisions in Chapter 12 augment the leak and spill control provisions in other chapters. 12.1.3 This chapter includes basic plant security provisions. 12.2* General. Fire protection shall be provided for all LNG facilities. 12.2.1* The extent of such protection shall be determined by an evaluation based on �re protection engineering principles, analysis of local conditions, hazards within the facility, and exposure to or from other property. 12.2.1.1* Protection installed as a result of the evaluation in 12.2.2 shall be designed, engineered, installed and tested based upon �re protection equipment standards incorporated by reference adhering to the following standards:
(1) NFPA 10, Standard for Portable Fire Extinguishers (2) NFPA 11, Standard for Low-, Medium-, and High-Expansion Foam (3) NFPA 12, Standard on Carbon Dioxide Extinguishing Systems (4) NFPA 12A, Standard on Halon 1301 Fire Extinguishing Systems (5) NFPA 13, Standard for the Installation of Sprinkler Systems (6) NFPA 14, Standard for the Installation of Standpipe and Hose Systems (7) NFPA 15, Standard for Water Spray Fixed Systems for Fire Protection (8) NFPA 16, Standard for the Installation of Foam-Water Sprin‐ kler and Foam-Water Spray Systems (9) NFPA 17, Standard for Dry Chemical Extinguishing Systems (10) NFPA 20, Standard for the Installation of Stationary Pumps for Fire Protection (11) NFPA 22, Standard for Water Tanks for Private Fire Protection (12) NFPA 24, Standard for the Installation of Private Fire Service Mains and Their Appurtenances (13) NFPA 72 , National Fire Alarm and Signaling Code (14) NFPA 101 , Life Safety Code (15) NFPA 750, Standard on Water Mist Fire Protection Systems (16) NFPA 1221, Standard for the Installation, Maintenance, and Use of Emergency Services Communications Systems (17) NFPA 1901, Standard for Automotive Fire Apparatus (18) NFPA 1961, Standard on Fire Hose (19) NFPA 1962, Standard for the Care, Use, Inspection, Service Testing, and Replacement of Fire Hose, Couplings, Nozzles, and Fire Hose Appliances (20) NFPA 1963, Standard for Fire Hose Connections (21) NFPA 2001, Standard on Clean Agent Fire Extinguishing Systems
` , , ` , ` , , ` , , ` ` , , ` ` , ` , , ` , ` , ` ` ` , , , ` ` ` , ` , , , , ` ` ` -
2016 Edition
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
59A-40
PRODUCTION, STORAGE, AND HANDLING OF LIQUEFIED NATURAL GAS (LNG)
12.2.2* The evaluation shall determine the following:
(1) The type, quantity, and location of equipment necessary for the detection and control of �res, leaks, and spills of LNG, �ammable refrigerants, or �ammable gases (2) The type, quantity, and location of equipment necessary for the detection and control of potential nonprocess and electrical �res (3) The methods necessary for protection of the equipment and structures from the effects of �re exposure (4) Requirements for �re protection water systems (5)* Requirements for �re-extinguishing and other �re control equipment (6) The equipment and processes to be incorporated within the emergency shutdown (ESD) system, including analy‐ sis of subsystems, if any, and the need for depressurizing speci�c vessels or equipment during a �re emergency (7) The type and location of sensors necessary to initiate automatic operation of the ESD system or its subsystems (8) The availability and duties of individual plant personnel and the availability of external response personnel during an emergency (9)* The personal protective equipment, special training, and quali�cation needed by individual plant personnel for their respective emergency duties as speci�ed by NFPA 600 (10) Requirements for other �re protection equipment and systems 12.3 Emergency Shutdown (ESD) Systems.
12.3.7 Manual actuators shall be located in an area accessible in an emergency, shall be at least 50 ft (15 m) from the equip‐ ment they serve, and shall be marked with their designated function. 12.4 Gas, Fire, and Leak Detection. 12.4.1 Areas, including enclosed buildings, that can have the presence of �ammable gas, LNG or �ammable refrigerant spills, and �re shall be monitored as required by the evaluation in 12.2.1. 12.4.2 Gas Detection. 12.4.2.1 Continuously monitored �ammable gas detection systems shall sound an alarm at the plant site and at a constantly attended location if the plant site is not attended continuously. 12.4.2.2 Flammable gas detection systems shall activate an audible and a visual alarm at not more than 25 percent of the lower �ammable limit of the gas or vapor being monitored. 12.4.3 Fire Detectors. 12.4.3.1 Fire detectors shall activate an audible and a visual alarm at the plant site and at a constantly attended location if the plant site is not attended continuously. 12.4.3.2 If so determined by an evaluation in accordance with 12.2.1, �re detectors shall be permitted to activate portions of the ESD system.
12.3.1 Each LNG facility shall have an ESD system(s) to isolate or shut off a source of LNG, �ammable liquids, �ammable refrigerant, or �ammable gases, and to shut down equipment whose continued operation could add to or sustain an emer‐ gency.
12.4.4 Leak Detection. Leak detection shall activate an audi‐ ble and visual alarm at the plant site and at a constantly atten‐ ded location if the plant is not continuously attended.
12.3.2 Valves, control systems, and equipment required by the ESD system shall not be required to duplicate valves, control systems, and equipment installed to meet other requirements of the standard where multiple functions are incorporated in the valves, control systems, and equipment. The valves, control systems, and equipment shall meet the requirements for ESD systems.
12.5 Fire Protection Water Systems.
12.3.3 If equipment shutdown will introduce a hazard or result in mechanical damage to equipment, the shutdown of any equipment or its auxiliaries shall be omitted from the ESD system if the effects of the continued release of �ammable or combustible �uids are controlled. 12.3.4 The ESD system(s) shall be of a fail-safe design or shall be otherwise installed, located, or protected to minimize the possibility that it will become inoperative in the event of an emergency or a failure at the normal control system. 12.3.5 ESD systems that are not of a fail-safe design shall have all components that are located within 50 ft (15 m) of the equipment controlled in either of the following ways:
(1) Installed or located where they cannot be exposed to a �re (2) Protected against failure due to a �re exposure of at least 10 minutes duration 12.3.6 Operating instructions identifying the location and operation of emergency controls shall be posted in the facility area.
12.4.5* The detection systems shall be designed, installed, and maintained in accordance with NFPA 72 .
12.5.1 A water supply and a system for distributing and apply‐ ing water shall be provided for protection of exposures; for cooling containers, equipment, and piping; and for controlling unignited leaks and spills, unless an evaluation in accordance with 12.2.1 determines that the use of water is unnecessary or impractical. 12.5.2 The �re water supply and distribution systems, if provi‐ ded, shall simultaneously supply water to �xed �re protection systems, including monitor nozzles, at their design �ow and pressure, involved in the maximum single incident expected in the plant plus an allowance of 1000 gpm (63 L/sec) for hand hose streams for at least 2 hours. 12.5.3 Where provided, �re protection water systems shall be designed in accordance with NFPA 13, NFPA 14, NFPA 15, NFPA 20, NFPA 22, NFPA 24, NFPA 750, or NFPA 1961 as appli‐ cable. 12.6 Fire Extinguishing and Other Fire Control Equipment. 12.6.1* Portable or wheeled �re extinguishers shall be recom‐ mended for gas �res by their manufacturer. 12.6.1.1 Portable or wheeled �re extinguishers shall be availa‐ ble at strategic locations, as determined in accordance with 12.2.1, within an LNG facility and on tank vehicles.
Portable and wheeled �re extinguishers shall 12.6.1.2 conform to the requirements of NFPA 10.
2016 Edition
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
` , , ` , ` , , ` , , ` ` , , ` ` , ` , , ` , ` , ` ` ` , , , ` ` ` , ` , , , , ` ` ` -
REQUIREMENTS FOR STATIONARY APPLICATIONS USING ASME CONTAINERS
12.6.1.3 Handheld portable dry chemical extinguishers shall contain minimum nominal agent capacities of 20 lb (9 kg) or greater and shall have a minimum 1 lb/sec (0.45 kg/sec) agent discharge rate. 12.6.1.4 For LNG plant hazard areas where minimal Class A �re hazards are present, the selection of potassium bicarbon‐ ate–based dry chemical extinguishers is recommended. 12.6.1.5 Wheeled portable dry chemical extinguishers shall contain minimum nominal agent capacities of 125 lb (56.7 kg) or greater and shall have a minimum 2 lb/sec (0.90 kg/sec) agent discharge rate. 12.6.2 If provided, automotive and trailer-mounted �re appa‐ ratus shall not be used for any other purpose. 12.6.3 Fire trucks shall conform to NFPA 1901. 12.6.4 Automotive vehicles assigned to the plant shall be provided with a minimum of one portable dry chemical extin‐ guisher having a capacity of not less than 18 lb (8.2 kg).
59A-41
12.9.3.1 The LNG plant shall be secured either by a single continuous enclosure or by multiple independent enclosures or approved barrier(s). 12.9.3.2 Where the enclosed area exceeds 1250 ft 2 (116 m2), at least two exit gates or doors shall be provided. 12.9.4 LNG plants shall be illuminated in the vicinity of protective enclosures and in other areas as necessary to promote security of the LNG plant. Chapter 13 Requirements for Stationary Applications Using ASME Containers 13.1 Scope. 13.1.1 This chapter provides requirements for the installation, design, fabrication, and siting of LNG facilities using containers of 100,000 U.S. gal (379 m 3) water capacity and less, construc‐ ted in accordance with the ASME Boiler and Pressure Vessel Code .
12.7 Maintenance of Fire Protection Equipment. Plant opera‐ tors shall prepare and implement a maintenance program for all plant �re protection equipment.
13.1.2 The maximum aggregate storage capacity of the facility shall be 280,000 U.S. gal (1060 m 3) water capacity.
12.8 Personnel Safety.
13.2.1 Site preparation shall include provisions for retention of spilled LNG within the limits of plant property and for surface water drainage.
12.8.1* Protective clothing that will provide protection against the effects of exposure to LNG shall be available and readily accessible at the LNG plant. 12.8.2* Employees who are involved in emergency response activities beyond the incipient stage shall be equipped with protective clothing and equipment and trained in accordance with NFPA 600. 12.8.3* Written practices and procedures shall be developed to protect employees from the hazards of entry into con�ned or hazardous spaces. 12.8.4* At least three portable �ammable gas indicators shall be readily available. 12.9 Security. 12.9.1 Security Assessment. 12.9.1.1* A security assessment covering hazards, threats, vulnerabilities, and consequences shall be prepared for the LNG plant.
` ` ` , , , , ` , ` ` ` , , , ` ` ` , ` , ` , , ` , ` ` , , ` ` , , ` , , ` , ` , , ` -
12.9.1.2 The security assessment shall be available to the authority having jurisdiction on a nonpublic basis.
12.9.2 The LNG plant operator shall provide a security system with controlled access that is designed to prevent entry by unauthorized persons. 12.9.3 At LNG plants, there shall be a protective enclosure, including a peripheral fence, building wall, or natural barrier enclosing major facility components such as the following:
(1) (2) (3) (4) (5) (6) (7)
LNG storage containers Flammable refrigerant storage tanks Flammable liquid storage tanks Other hazardous materials storage areas Outdoor process equipment areas Buildings housing process or control equipment Onshore loading and unloading facilities
13.2 General Requirements.
13.2.2 All-weather accessibility to the site for emergency serv‐ ices equipment shall be provided. 13.2.3 Storage and transfer equipment at unattended facilities shall be secured to prevent tampering. 13.2.4 Operating instructions identifying the location and operation of emergency controls shall be posted conspicuously in the facility area. 13.2.5 Designers, f abricators, and constructors of LNG facility systems and equipment shall be competent in their respective �elds. 13.2.6 Supervision shall be provided for the fabrication, construction, and acceptance tests of facility components necessary to ensure that facilities are in compliance with this standard. 13.2.7 Facilities transferring LNG during the night shall have lighting at the transfer area. 13.2.8 The maximum allowable working pressure shall be speci�ed for all pressure-containing components. 13.3 Containers. 13.3.1 All piping that is a part of an LNG container, including piping between the inner and outer containers, shall be in accordance with either Section VIII of the ASME Boiler and Pres‐ sure Vessel Code , or ASME B 31.3, Process Piping. 13.3.2 Compliance with 13.3.1 shall be stated on or appended to the ASME Boiler and Pressure Vessel Code , Appendix W, Form U-1, “Manufacturer's Data Report for Pressure Vessels.” 13.3.3 Internal piping between the inner tank and the outer tank and within the insulation space shall be designed for the maximum allowable working pressure of the inner tank, with allowance for thermal stresses.
2016 Edition
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
59A-42
PRODUCTION, STORAGE, AND HANDLING OF LIQUEFIED NATURAL GAS (LNG)
13.3.4 Bellows shall not be permitted within the insulation space. 13.3.5 Containers shall be double-walled, with the inner tank holding LNG surrounded by insulation contained within the outer tank. 13.3.6 The inner tank shall be of welded construction and in accordance with the ASME Boiler and Pressure Vessel Code , Section VIII, and shall be ASME-stamped and registered with the National Board of Boiler and Pressure Vessel Inspectors or another agency that registers pressure vessels. 13.3.7 The inner tank supports shall be designed for shipping, seismic, and operating loads. 13.3.8 The support system to accommodate the expansion and contraction of the inner tank shall be designed so that the resulting stresses imparted to the inner and outer tanks are within allowable limits.
[13.3.14.1a] V
=
Z c
× W
For vertical force: [13.3.14.1b] P
2 =
3
Z c × W
where: Z c = seismic coef�cient equal to 0.60 S DS where S DS is the maxi‐ mum design spectral acceleration determined in accord‐ ance with the provisions of ASCE 7, Minimum Design Loads for Buildings and Other Structures , using an importance factor, I , of 1.0 for the site class most representative of the subsurface conditions where the LNG facility is located W = total weight of the container and its contents
13.3.9 The outer tank shall be of welded construction using any of the following materials:
13.3.14.2 Usage.
(1) Any of the carbon steels in Section VIII, Part UCS of the ASME Boiler and Pressure Vessel Code at temperatures at or above the minimum allowable use temperature in Table 1A of the ASME Boiler and Pressure Vessel Code , Section II, Part D (2) Materials with a melting point below 2000°F (1093°C) where the container is buried or mounded
(B) If the natural period T is 0.06 or greater, 7.4.4.1 and 7.4.4.2 shall apply.
13.3.10 Where vacuum insulation is used, the outer tank shall be designed by either of the following:
(1)
The ASME Boiler and Pressure Vessel Code , Section VIII, Parts UG-28, UG-29, UG-30, and UG-33, using an external pressure of not less than 15 psi (103 kPa) (2) Paragraph 3.6.2 of CGA 341, Standard for Insulated Cargo Tank Speci�cation for Cryogenic Liquids 13.3.11 Heads and spherical outer tanks that are formed in segments and assembled by welding shall be designed in accordance with the ASME Boiler and Pressure Vessel Code , Section VIII, Parts UG-28, UG-29, UG-30, and UG-33, using an external pressure of 15 psi (103 kPa).
(A) The method of design described in 13.3.14.1 shall be used only where the natural period, T , of the shop-built container and its supporting system is less than 0.06 second.
13.3.14.3 The container and its supports shall be designed for the resultant seismic forces in combination with the operating loads, using the allowable stresses increase shown in the code or standard used to design the container or its supports. 13.3.14.4 The requirements of Section 13.3 shall apply to ASME containers built prior to July 1, 1996, when reinstalled. 13.3.15 Each container shall be identi�ed by the attachment of a nameplate(s) in an accessible location marked with the information required by the ASME Boiler and Pressure Vessel Code and the following:
13.3.12 The outer tank shall be equipped with a relief device or other device to release internal pressure.
(1) (2) (3) (4) (5) (6)
13.3.12.1 The discharge area shall be at least 0.00024 in.2/lb (0.34 mm2/kg) of the water capacity of the inner tank, but the area shall not exceed 300 in. 2 (0.2 m2).
13.3.16 All penetrations of storage containers shall be marked with the function of the penetration. Penetration markings shall be visible if frosting occurs.
13.3.12.2 The relief device shall function at a pressure not exceeding the internal design pressure of the outer tank, the external design pressure of the inner tank, or 25 psi (172 kPa), whichever is least.
13.4 Container Filling. Containers designed to operate at a pressure in excess of 15 psi (103 kPa) shall be equipped with a device(s) that prevents the container from becoming liquid-full or the inlet of the relief device(s) from becoming covered with liquid when the pressure in the container reaches the set pres‐ sure of the relieving device(s) under all conditions.
13.3.13 Thermal barriers shall be provided to prevent the outer tank from falling below its design temperature. 13.3.14 Seismic Design. 13.3.14.1 Shop-built containers designed and constructed in accordance with the ASME Boiler and Pressure Vessel Code and their support systems shall be designed for the dynamic forces associated with horizontal and vertical accelerations as follows: For horizontal force:
Builder's name and date container was built Nominal liquid capacity Design pressure at the top of the container Maximum permitted liquid density Maximum �lling level Minimum design temperature
13.5 Container Foundations and Supports. 13.5.1 LNG container foundations shall be designed and constructed in accordance with NFPA 5000 . 13.5.2 The design of saddles and legs shall include shipping loads, erection loads, wind loads, and thermal loads. 13.5.3 Foundations and supports shall have a �re resistance rating of not less than 2 hours and shall be resistant to dislodg‐ ment by hose streams.
2016 Edition
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
` , , ` , ` , , ` , , ` ` , , ` ` , ` , , ` , ` , ` ` ` , , , ` ` ` , ` , , , , ` ` ` -
REQUIREMENTS FOR STATIONARY APPLICATIONS USING ASME CONTAINERS
59A-43
Table 13.6.2.1 Distances from Containers and Exposures Minimum Distance from Edge of Impoundment or Container Drainage System to Offsite Buildings and Property Lines That Can Be Built Upon
Container Water Capacity m3
ft
m
1000–2000 2001–18,000 18,001–30,000 30,001–70,000
3.8–7.6 ≥7.6–68.1 ≥68.1–114 ≥114–265
15 25 50 75
4.6 7.6 15 23
>70,000
>265
gal
` ` ` , , , , ` , ` ` ` , , , ` ` ` , ` , ` , , ` , ` ` , , ` ` , , ` , , ` , ` , , ` -
Minimum Distance Between Storage Containers ft
m
5 1.5 5 1.5 5 1.5 1 ∕ 4 of the sum of the diameters of adjacent containers [5 ft (1.5 m) minimum]
0.7 times the container diameter [100 ft (30 m) minimum]
13.5.4 LNG storage containers installed in an area subject to �ooding shall be secured to prevent the release of LNG or �otation of the container in the event of a �ood.
13.6.4 Buried and underground containers shall be provided with means to prevent the 32°F (0°C) isotherm from penetrat‐ ing the soil.
13.6 Container Installation.
13.6.5 Where heating systems are used, they shall be installed such that any heating element or temperature sensor used for control can be replaced.
13.6.1 LNG containers of 1000 gal (3.8 m3) and smaller shall be located as follows:
(1) (2)
13.6.6* All buried or mounded components in contact with the soil shall be constructed from material resistant to soil corrosion or protected to minimize corrosion.
125 gal (0.47 m3) or less, 0 ft (0 m) from property lines that can be built upon Larger than 125 gal (0.47 m3) to 1000 gal (3.8 m 3), 10 ft (3.0 m) from property lines that can be built upon
13.6.7 A clear space of at least 3 ft (0.9 m) shall be provided for access to all isolation valves serving multiple containers.
13.6.2 Minimum Distance.
13.6.8 LNG containers of greater than 125 gal (0.5 m3) capacity shall not be located in buildings.
13.6.2.1 The minimum distance from the edge of an impoundment or container drainage system serving above‐ ground and mounded containers larger than 1000 gal (3.8 m 3) shall be in accordance with Table 13.6.2.1 for each of the following:
13.6.9 The point where connections are made for product transfer shall be located not less than 25 ft (7.6 m) from the following:
(1) Nearest offsite building (2) The property line that can be built upon (3) Spacing between containers
(1) The nearest important building not associated with the LNG facility (2) The line of adjoining property that can be built upon
13.6.2.2 The distance from the edge of an impoundment or container drainage system to buildings or walls of concrete or masonry construction shall be reduced from the distance in Table 13.6.2.1 with the approval of the authority having juris‐ diction with a minimum of 10 ft (3 m ).
13.6.10 LNG tanks and their associated equipment shall not be located where exposed to failure of overhead electric power lines operating at over 600 volts.
13.6.3 Underground LNG tanks shall be installed in accord‐ ance with Table 13.6.3.
13.7.1 All liquid and vapor connections, except relief valve and instrument connections, shall be equipped with automatic fail-safe product retention valves.
13.7 Automatic Product Retention Valves.
Table 13.6.3 Distances from Underground Containers and Exposures Minimum Distance from Buildings and the Adjoining Property Line That Can Be Built Upon
Container Water Capacity gal
<18,000 18,000–30,000 30,001–100,000
m3
<68.1 68.1–114 >114
Distance Between Containers
ft
m
ft
m
15 25 40
4.6 7.6 12.2
15 15 15
4.6 4.6 4.6 2016 Edition
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
59A-44
PRODUCTION, STORAGE, AND HANDLING OF LIQUEFIED NATURAL GAS (LNG)
13.7.2* Automatic fail-safe product retention valves shall be designed to close on the occurrence of any of the following conditions:
13.10 Shop Testing of LNG Containers.
(1) Fire detection or exposure (2) Uncontrolled �ow of LNG from the container (3) Manual operation from a local and remote location
13.10.2 Piping between the inner container and the �rst connection outside the outer container shall be tested in accordance with ASME B 31.3 .
13.7.3 Connections used only for �ow into the container shall be equipped with either two back�ow valves, in series, or an automatic fail-safe product retention valve.
13.11 Shipment of LNG Containers. Containers shall be ship‐ ped under a minimum internal pressure of 10 psi (69 kPa) inert gas.
13.7.4 Appurtenances shall be installed as close to the container as practical so that a break resulting from external strain shall occur on the piping side of the appurtenance while maintaining intact the valve and piping on the container side of the appurtenance.
13.12 Field Testing of LNG Containers.
13.8 LNG Spill Containment. 13.8.1 Impoundment (dikes), topography, or other methods to direct LNG spills to a safe location and to prevent LNG spills from entering water drains, sewers, waterways, or any closedtop channel shall be used. 13.8.2 Flammable liquid storage tanks shall not be located within an LNG container impoundment area. 13.8.3 Impounding areas serving aboveground and mounded LNG containers shall have a minimum volumetric holding capacity, including any useful holding capacity of the drainage area and with allowance made for the displacement of snow accumulation, other containers, and equipment, in accordance with the following:
(1) Where containers in the dike area are constructed or protected to prevent failure from spilled LNG and �re in the dike, the minimum holding of the dike shall be the volume of the largest container in the dike. (2) Where containers in the dike area are not constructed or protected to prevent failure from spilled LNG and �re in the dike, the minimum holding of the dike shall be equal to the total volume of the containers in the dike area. 13.8.4 Impounding areas shall be designed or equipped to clear rain or other water. 13.8.4.1 Where automatically controlled sump pumps are used, they shall be equipped with an automatic cutoff device that prevents their operation when exposed to LNG tempera‐ tures. 13.8.4.2 Piping, valves, and �ttings whose failure could allow liquid to escape from the impounding area shall be designed to withstand continuous exposure to the temperature of LNG. 13.8.4.3 Where gravity drainage is employed for water removal, the gravity draining system shall be designed to prevent the escape of LNG by way of the drainage system. 13.9 Inspection. 13.9.1 Prior to initial operation, containers shall be inspected to ensure compliance with the engineering design and mate‐ rial, fabrication, assembly, and test provisions of t his chapter. 13.9.2 Inspectors shall be quali�ed in accordance with the code or standard applicable to the container and as speci�ed in this standard.
13.10.1 The outer tank shall be leak tested.
13.12.1 Containers and associated piping shall be leak tested prior to �lling with LNG. 13.12.2 After acceptance tests are completed, there shall be no �eld welding on the LNG containers. 13.13 Welding on Containers. 13.13.1 Field welding shall be done only on saddle plates or brackets provided for the purpose. 13.13.2 Where repairs or modi�cations incorporating welding are required, they shall comply with the code or standard under which the container was fabricated. 13.13.3 Retesting by a method appropriate to the repair or modi�cation shall be required only where the repair or modi�‐ cation is of such a nature that a retest actually tests the element affected and is necessary to demonstrate the adequacy of the repair or modi�cation. 13.14 Piping. 13.14.1 All piping that is part of an LNG container and the facility associated with the container for handling cryogenic liquid or �ammable �uid shall be in accordance with ASME B 31.3, and the following:
(1) Type F piping, spiral welded piping, and furnace butt welded steel products shall not be permitted. (2) All welding or brazing shall be performed by personnel quali�ed to the requirements of the ASME B 31.3, subsection 328.2, Welding Quali�cations, and ASME Boiler and Pressure Vessel Code , Section IX, as applicable. (3) Oxygen–fuel gas welding shall not be permitted. (4) Brazing �ller metal shall have a melting point exceeding 1000°F (538°C). (5) All piping and tubing shall be austenitic stainless steel for all services below −20°F (−29°C). (6) All piping and piping components, except gaskets, seals, and packing, shall have a minimum melting point of 1500°F (816°C). (7) Aluminum shall be used only downstream of a product retention valve in vaporizer service. (8) Compression-type couplings used where they can be subjected to temperatures below −20°F (−29°C) shall meet the requirements of ASME B 31.3, Section 315. (9) Stab-in branch connections shall not be permitted. (10) Extended bonnet valves shall be used for all cryogenic liquid service, and they shall be installed so that the bonnet is at an angle of not more than 45 degrees from the upright vertical position. 13.14.2* The level of examination of piping shall be speci�ed.
2016 Edition --```,`,```,```,`,`,`,``,-`-`,`,`,`,`---
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
REQUIREMENTS FOR STATIONARY APPLICATIONS USING ASME CONTAINERS
13.15 Container Instrumentation. 13.15.1 General. Instrumentation for LNG facilities shall be designed so that, in the event of power or instrument air fail‐ ure, the system will go into a fail-safe condition that can be maintained until the operators can take action to reactivate or secure the system. 13.15.2 Level Gauging. LNG containers shall be equipped with liquid level devices as follows:
Containers of 1000 gal (3.8 m3) or larger shall be equip‐ ped with two independent liquid level devices. (2) Containers smaller than 1000 gal (3.8 m3) shall be equip‐ ped with either a �xed length dip tube or other level devi‐ ces. (3) Containers of 1000 gal (3.8 m3) or larger shall have one liquid level device that provides a continuous level indica‐ tion ranging from full to empty and that is maintainable or replaceable without taking the container out of serv‐ ice. (1)
13.15.3 Pressure Gauging and Control. 13.15.3.1 Each container shall be equipped with a pressure gauge connected to the container at a point above the maxi‐ mum liquid level that has a permanent mark indicating the maximum allowable working pressure (MAWP) of the container. 13.15.3.2 Vacuum-jacketed equipment shall be equipped with instruments or connections for checking the pressure in the annular space. 13.15.3.3 Safety relief valves shall be sized to include condi‐ tions resulting from operational upset, vapor displacement, and �ash vaporization resulting from pump recirculation and �re. 13.15.4 Pressure relief valves shall communicate directly with the atmosphere. 13.15.5 Pressure relief valves shall be sized in accordance with 7.3.6.5 or with CGA S-1.3, Pressure Relief Device Standards — Part 3 — Compressed Gas Storage Containers. 13.15.6 Inner container pressure relief valves shall have a manual full-opening stop valve to isolate it from the container. 13.15.6.1 The stop valve shall be lockable or sealable in the fully open position. 13.15.6.2 The installation of pressure relief valves shall allow each relief valve to be isolated individually for testing or main‐ tenance while maintaining the full relief capacities determined in 7.3.6.5. 13.15.6.3 Where only one pressure relief valve is required, either a full-port opening three-way valve used under the pres‐ sure relief valve and its required spare or individual valves beneath each pressure relief valve shall be installed. 13.15.7 Stop valves under individual safety relief valves shall be locked or sealed when opened and shall not be opened or closed except by an authorized person. 13.15.8 Safety relief valve discharge stacks or vents shall be designed and installed to prevent an accumulation of water, ice, snow, or other foreign matter and, if arranged to discharge directly into the atmosphere, shall discharge vertically upward.
59A-45
13.16 Fire Protection and Safety. The requirements of Sections 12.1 and 12.2; 12.3.1; 12.4.1; Sections 12.5, 12.6, and 12.7; 12.8.2; and 12.8.3 shall apply. 13.17 Gas Detection. A portable �ammable gas indicator shall be readily available. 13.18 Operations and Maintenance. Each facility shall have written operating, maintenance, and training procedures based on experience, knowledge of similar facilities, and conditions under which the facility will be operated. 13.18.1 Basic Operations Requirements. shall meet the following requirements:
Each LNG facility
(1) Have written procedures covering operation, mainte‐ nance, and training (2) Keep up-to-date drawings of LNG facility equipment showing all revisions made after installation (3) Revise the plans and procedures as operating conditions or facility equipment require (4) Establish a written emergency plan (5) Establish liaison with appropriate local authorities such as police, �re department, or municipal works and inform them of the emergency plans and their role in emergency situations (6) Analyze and document all safety-related malfunctions and incidents for the purpose of determining their causes and preventing the possibility of recurrence ` , , ` , ` , , ` , , ` ` , , ` ` , ` , , ` , ` , ` ` ` , , , ` ` ` , ` , , , , ` ` ` -
13.18.2 Operating Procedures Manual. 13.18.2.1 Each facility shall have a written manual of operat‐ ing procedures, including the following:
(1) Conducting a proper startup and shutdown of all components of the facility, including those for an initial startup of the LNG facility that will ensure that all components will operate satisfactorily (2) Purging and inerting components (3) Cooling down components (4) Ensuring that each control system is properly adjusted to operate within its design limits (5) Maintaining the vaporization rate, temperature, and pressure so that the resultant gas is within the design tolerance of the vaporizer and the downstream piping (6) Determining the existence of any abnormal conditions and indicating the response to those conditions (7) Ensuring the safety of personnel and property while repairs are carried out, whether or not equipment is in operation (8) Ensuring the safe transfer of hazardous �uids (9) Ensuring security at the LNG plant (10) Monitoring operation by watching or listening for warn‐ ing alarms from an attended control center and by conducting inspections on a planned, periodic basis (11) Monitoring the foundation heating system weekly 13.18.2.2 The manual shall be accessible to operating and maintenance personnel. 13.18.2.3 The manual shall be updated when changes in equipment or procedures are made. 13.18.2.4 The operations manual shall contain procedures to ensure the following:
(1) That the cooldown of each system of components under its control and subjected to cryogenic temperatures is limited to a rate and a distribution pattern that maintain 2016 Edition
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
59A-46
PRODUCTION, STORAGE, AND HANDLING OF LIQUEFIED NATURAL GAS (LNG)
the thermal stresses within the design limits of the system during the cooldown period, having regard for the performance of expansion and contraction devices (2) That each facility has procedures to check each cryogenic piping system under its control during and after cool‐ down stabilization for leaks in areas where there are �anges, valves, and seals 13.18.2.5 Each operations manual shall include purging procedures that, when implemented, minimize the presence of a combustible mixture in LNG facility piping or equipment when a system is being placed into or taken out of operation. 13.18.2.6 The operations manual shall contain procedures for loading or unloading operations applicable to all transfers, including the following:
(1) Written procedures shall cover all transfer operations and shall cover emergency as well as normal operating proce‐ dures. (2) Written procedures shall be kept up-to-date and available to all personnel engaged in transfer operations. (3) Prior to transfer, gauge readings shall be obtained or inventory established to ensure that the receiving vessel cannot be over�lled. (4) Levels of the receiving vessel shall be checked during transfer operations. (5) The transfer system shall be checked prior to use to ensure that valves are in the correct position. (6) Pressure and temperature conditions shall be observed during the transfer operation. 13.18.2.7 Each operations manual for a facility that transfers LNG from or to a cargo tank vehicle or a tank car shall contain procedures for loading or unloading tank cars or tank vehicles, including the following:
(1) While tank car or tank vehicle loading or unloading oper‐ ations are in progress, rail and vehicle traf�c shall be prohibited within 25 ft (7.6 m) of LNG facilities or within 50 ft (15 m) of refrigerants whose vapors are heavier than air. (2) Prior to connecting a tank car, the car shall be checked and the brakes set, the derailer or switch properly posi‐ tioned, and warning signs or lights placed as required. (3) The warning signs or lights shall not be removed or reset until the transfer is completed and the car disconnected. (4) Unless required for transfer operations, truck vehicle engines shall be shut off. (5) Brakes shall be set and wheels checked prior to connect‐ ing for unloading or loading. (6) The engine shall not be started until the truck vehicle has been disconnected and any released vapors have dissipa‐ ted. (7) Prior to loading LNG into a tank car or tank vehicle that is not in exclusive LNG service, a test shall be made to determine the oxygen content in the container. (8) If a tank car or tank vehicle in exclusive LNG service does not contain a positive pressure, it shall be tested for oxygen content. (9) If the oxygen content in either case exceeds 2 percent by volume, the container shall not be loaded until it has been purged to below 2 percent oxygen by volume. 13.18.3 Emergency Procedures. 13.18.3.1 Each LNG facility shall have a written manual of emergency procedures that shall include the types of emergen‐
cies that are anticipated from an operating malfunction, struc‐ tural collapse of part of the LNG facility, personnel error, forces of nature, and activities carried on adjacent to the LNG facility, including the following: (1) Procedures for responding to controllable emergencies, including noti�cation of personnel and the use of equip‐ ment that is appropriate for handling the emergency and the shutdown or isolation of various portions of the equipment and other applicable steps to ensure that the escape of gas or liquid is promptly cut off or reduced as much as possible (2) Procedures for recognizing an uncontrollable emergency and for taking action to ensure that harm to the person‐ nel at the LNG facility and to the public is minimized (3) Procedures for the prompt noti�cation of the emergency to the appropriate local of�cials, including the possible need to evacuate persons from the vicinity of the LNG plant (4) Procedures for coordinating with local of�cials in the preparation of an emergency evacuation plan that sets forth the steps necessary to protect the public in the event of an emergency 13.18.3.2* When local of�cials are contacted in an emergency, procedures shall include the method of noti�cation of the following:
(1) The quantity and location of �re equipment throughout the LNG plant (2) Potential hazards at the LNG plant (3) Communication and emergency control capabilities of the LNG plant (4) The status of each emergency 13.18.4 Maintenance. Each facility shall have written mainte‐ nance procedures based on experience, knowledge of similar facilities, and conditions under which the f acilities will be main‐ tained. 13.18.4.1 Each LNG facility operator shall carry out periodic inspection, tests, or both on a schedule that is included in the maintenance plan on identi�ed components and its support system in service in the LNG facility, to verify that the compo‐ nents are maintained in accordance with the equipment manu‐ facturer's recommendations and the following:
(1) The support system or foundation of each component shall be inspected at least annually to ensure that the support system or foundation is sound. (2) Each emergency power source at the LNG plant shall be tested monthly to ensure that it is operational and tested annually to ensure that it is capable of performing at its intended operating capacity. (3) When a safety device serving a single component is taken out of service for maintenance or repair, the component shall also be taken out of service, except where the safety function is provided by an alternative means. (4) Where the operation of a component that is taken out of service could cause a hazardous condition, a tag bearing the words “Do Not Operate,” or equivalent, shall be attached to the controls of the component, or the compo‐ nent shall be locked out. (5) Stop valves for isolating pressure or vacuum-relief valves shall be locked or sealed open and shall be operated only by an authorized person. (6) No more than one pressure or vacuum relief valve stop valve shall be closed at one time on an LNG container.
2016 Edition
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
` , , ` , ` , , ` , , ` ` , , ` ` , ` , , ` , ` , ` ` ` , , , ` ` ` , ` , , , , ` ` ` -
REQUIREMENTS FOR STATIONARY APPLICATIONS USING ASME CONTAINERS
13.18.4.2 Maintenance Manual. (A) Each facility operator shall prepare a written manual that sets out an inspection and maintenance program for identi�ed components that are used in the facility. (B) The maintenance manual for facility components shall include the following:
(1) (2) (3)
The manner of carrying out and the frequency of the inspections and tests referred to in 13.18.4.1 A description of any other action in addition to those referred to in 13.18.4.2(B)(1) that is necessary to main‐ tain the facility in accordance with this standard All procedures to be followed during repairs on a compo‐ nent that is operating while it is being repaired, to ensure the safety of persons and property at the facility
(C) Each facility operator shall conduct the facility's mainte‐ nance program in accordance with the written manual for facility components. 13.18.4.3 Facility Maintenance. (A) Each facility operator shall keep the grounds of the facility free from rubbish, debris, and other materials that could present a �re hazard. (B) Each facility operator shall ensure that the components of the facility are kept free from ice and other foreign materials that could impede their performance. (C) Each facility operator shall maintain the grassed area of its facility so that it does not create a �re hazard. (D) All �re-control access routes within an LNG facility shall be maintained and kept unobstructed in all weather condi‐ tions. 13.18.4.4 Repairs that are carried out on components of a facility shall be carried out in a manner that ensures the follow‐ ing:
(1)
That the integrity of the components is maintained in accordance with this standard (2) That the components will operate in a safe manner (3) That the safety of personnel and property during a repair activity is maintained 13.18.4.5 Each facility operator shall ensure that a control system that is out of service for 30 days or more is tested prior to its return to service, to ensure that it is in proper working order. (A) Each facility operator shall ensure that the inspections and tests in this section are carried out at the intervals speci‐ �ed. (B) Control systems that are used seasonally shall be inspected and tested before use each season. (C) Control systems that are used as part of the �re protection system at the LNG plant shall be inspected and tested in accordance with the applicable �re codes and standards and conform to the following criteria:
(1) (2)
Monitoring equipment shall be maintained in accord‐ ance with NFPA 72 and NFPA 1221. Fire protection water systems, if required, shall be main‐ tained in accordance with NFPA 13, NFPA 14, NFPA 15, NFPA 20, NFPA 22, NFPA 24, and NFPA 25.
59A-47
(3)
Portable or wheeled �re extinguishers suitable for gas �res, preferably of the dry-chemical type, shall be availa‐ ble at strategic locations, as determined in accordance with Chapter 12, within an LNG facility and on tank vehi‐ cles and shall be maintained in accordance with NFPA 10. (4) Fixed �re extinguishers and other �re-control systems that are installed shall be maintained in accordance with NFPA 11, NFPA 12, NFPA 12A, NFPA 16, and NFPA 17. (D) Relief valves shall be inspected and set-point tested at least once every 2 calendar years, with intervals not exceeding 30 months, to ensure that each valve relieves at the proper setting. (E) The external surfaces of LNG storage tanks shall be inspected and tested as set out in the maintenance manual for the following:
(1) Inner tank leakage (2) Soundness of insulation (3) Tank foundation heating to ensure that the structural integrity or safety of the tanks is not affected (F) LNG storage facilities and, in particular, the storage container and its foundation shall be externally inspected after each major meteorological disturbance to ensure that the structural integrity of the LNG facility is intact. 13.18.4.6 Maintenance Records. (A) Each facility operator shall maintain a record of the date and the type of each maintenance activity per formed. (B) Maintenance records shall be retained for a period of not less than 5 years. 13.18.5 Training. 13.18.5.1 Every facility operator shall develop, implement, and maintain a written training plan to instruct appropriate facility personnel with respect to the following:
(1) Carrying out the emergency procedures that relate to their duties at the facility as set out in the procedure manual referred to in 13.18.3, and providing �rst aid (2) For permanent maintenance, operating, and supervisory personnel the following: (a) The basic operations carried out at the facility (b) The characteristics and potential hazards of LNG and other hazardous �uids involved in operating and maintaining the facility, including the serious danger from frostbite that can result from contact with LNG or cold refrigerants (c) The methods of carrying out their duties of main‐ taining and operating the facility as set out in the manual of operating and maintenance procedures referred to in 13.18.2 and 13.18.4 (d) The LNG transfer procedures required in 13.18.2.6 and 13.18.2.7 (e) Fire prevention, including familiarization with the �re control plan of the facility, �re �ghting, the potential causes of �re in a facility, and the types, sizes, and likely consequences of a �re at a facility (f) Recognition of situations in which it is necessary to obtain assistance in order to maintain the security of the facility 13.18.5.2 Each LNG plant operator shall develop, implement, and maintain a written plan to keep the personnel at the LNG
2016 Edition --```,`,```,```,`,`,`,``,-`-`,`,`,`,`---
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
59A-48
PRODUCTION, STORAGE, AND HANDLING OF LIQUEFIED NATURAL GAS (LNG)
plant up to date on the function of the systems, �re prevention, and security at the LNG facility.
14.3.3 The operating manual shall be updated when there are changes in equipment or procedures.
13.18.5.3 The plans required in 13.18.5.2 shall provide for training sessions to update personnel at intervals that do not exceed 2 years.
14.3.4 The operating manual shall include procedures for the startup and shutdown of all components of the LNG facility, including those for initial startup of the LNG facility, to ensure that all components operate satisfactorily.
13.18.5.4 Employee Records. (A) Every facility operator shall maintain a record for each applicable employee of the facility that sets out the training given to the employee under 13.18.5. (B) The employee records shall be maintained for at least 2 years after the date that the employee ceases to be employed at the facility. 13.18.5.5 Each facility operator shall ensure the following:
(1) That facility personnel receive applicable training refer‐ red to in 13.18.5 (2) That facility personnel have experience related to their assigned duties 13.18.5.6 Any person who has not completed the training or who does not have the experience set out in 13.18.5 shall be under the control of trained personnel. Chapter 14 Operating, Maintenance, and Personnel Training 14.1* Scope. This chapter contains basic requirements and minimum standards for the safety aspects of the operation and maintenance of LNG plants. 14.2 General Requirements. 14.2.1 Each operating company shall develop documented operating, maintenance, and training procedures, based on experience and conditions under which the LNG facility is operated. 14.2.2 The operating company shall meet the following requirements:
(1) Document procedures covering operation, maintenance, and training (2) Maintain up-to-date drawings, charts, and records of LNG facility equipment (3) Revise plans and procedures when operating conditions or LNG facility equipment are revised (4) Ensure cooldown of components in accordance with 14.3.5 (5) Establish a documented emergency plan (6) Establish liaisons with local authorities such as police, �re department, or municipal works to inform them of the emergency plans and their roles in emergency situations (7)* Analyze and document all safety-related conditions for the purpose of determining their causes and preventing the possibility of recurrence 14.3 Manual of Operating Procedures. 14.3.1 All LNG facility components shall be operated in accordance with the operating procedures manual. 14.3.2 The operating procedures manual shall be accessible to all LNG facility personnel and shall be kept readily available in the operating control center.
14.3.5 The operating manual shall include procedures for purging components, making components inert, and cooldown of components. 14.3.5.1 Procedures shall ensure that the cooldown of each system of components that is under the operating company's control, and that is subjected to cryogenic temperatures, is limi‐ ted to a rate and distribution pattern that maintains the ther‐ mal stresses within the design limits of the system during the cooldown period regarding the performance of expansion and contraction devices. 14.3.6 The operating manual shall include procedures to ensure that each control system is adjusted to operate the proc‐ ess within its design limits. 14.3.7 The operating manual of LNG plants with liquefaction facilities shall include procedures to maintain the tempera‐ tures, levels, pressures, pressure differentials, and �ow rates within their design limits for the following:
(1) (2) (3) (4) (5)
Boilers Turbines and other prime movers Pumps, compressors, and expanders Puri�cation and regeneration equipment Equipment in cold boxes
14.3.8 The operating manual shall include procedures for the following:
(1) Maintaining the vaporization rate, temperature, and pres‐ sure so that the resultant gas is within the design toler‐ ance of the vaporizer and the downstream piping (2) Determining the existence of any abnormal conditions and the response to those conditions in the LNG facility (3) The safe transfer of LNG and hazardous �uids, including prevention of over�lling of containers (4) Security 14.3.9 The operations manual shall include procedures for monitoring operations. 14.3.10 Written procedures shall be available to cover all transfer operations and shall cover emergency as well as normal operating procedures. 14.3.11 Written procedures shall be kept up to date and avail‐ able to all personnel engaged in transfer operations. 14.4 Emergency Procedures. 14.4.1 Each operations manual shall contain emergency procedures. 14.4.2 The emergency procedures shall include, at a mini‐ mum, emergencies that are anticipated from an operating malfunction, structural collapse of part of the LNG facility, personnel error, forces of nature, and activities carried on adja‐ cent to the plant. 14.4.3 The emergency procedures shall include but not be limited to procedures for responding to controllable emergen‐ cies, including the following:
2016 Edition
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
` , , ` , ` , , ` , , ` ` , , ` ` , ` , , ` , ` , ` ` ` , , , ` ` ` , ` , , , , ` ` ` -
OPERATING, MAINTENANCE, AND PERSONNEL TRAINING
(1) Noti�cation of personnel (2) Use of equipment appropriate for handling the emer‐ gency (3) The shutdown or isolation of various portions of the equipment (4) Other steps to ensure that the escape of gas or liquid is promptly cut off or reduced as much as possible 14.4.4 The emergency procedures shall include procedures for recognizing an uncontrollable emergency and for taking action to achieve the following:
(1) (2)
Minimizing harm to the personnel at the LNG plant and to the public Prompt noti�cation of the emergency to the appropriate local of�cials, including the possible need to evacuate persons from the vicinity of the LNG plant
59A-49
14.5.3 Cooldown. Each cryogenic piping system that is under the operating company's control shall be checked during and after cooldown stabilization for leaks in areas where there are �anges, valves, and seals. 14.5.4 Depressurizing. The discharge from depressurizing shall be directed to minimize exposure to personnel or equip‐ ment. 14.5.5 Purging. 14.5.5.1 The temperature of the purge gas or liquid shall be within the design temperature limits of the container or other equipment. 14.5.5.2 The pressure of the container or other equipment during purging shall be within the design pressure limits of the container.
14.4.5 The emergency procedures shall include procedures for coordinating with local of�cials in the preparation of an emergency evacuation plan that sets forth the steps necessary to protect the public in the event of an emergency, including the following:
14.5.5.3* Piping systems shall be purged of air or gas in a safe manner. (See Section 9.8.)
(1)
14.5.5.4.1 Taking an LNG container out of service shall not be regarded as a normal operation.
Quantity and location of �re equipment throughout the LNG plant (2) Potential hazards at the LNG plant (3) Communication and emergency control capabilities at the LNG plant (4) Status of each emergency 14.4.6 Emergency procedures shall include procedures for dealing with unignited gas releases. 14.4.7 Each facility that handles LNG shall develop a contin‐ gency plan to address potential incidents that can occur in or near the transfer area, including the following:
(1) (2) (3) (4) (5)
A description of the �re equipment and systems and their operating procedures, including a plan showing the loca‐ tions of all emergency equipment LNG release response procedures, including contact information for local response organizations Emergency procedures for unmooring a vessel, including the use of emergency towing wires (e.g., “�re warps”) Tug requirements for emergency situations and for speci�c foreseeable incidents that are berth-speci�c Telephone numbers of authorities having jurisdiction, hospitals, �re departments, and other emergency response agencies
14.5 Monitoring Operations. 14.5.1* Control Center. Operations monitoring shall be carried out by an attended control center that watches or listens for warning alarms and by inspections conducted at least at the intervals set out in the written operating procedures referred to in Section 14.3 and, at a minimum, on a weekly basis. 14.5.2 LNG Tank Foundation. 14.5.2.1 Where the bottom of the outer tank is in contact with the soil, the heating system shall be monitored at least once a week to ensure that the 32°F (0°C) isotherm is not penetrating the soil. 14.5.2.2 Any settlement in excess of that anticipated in the design shall be investigated, and corrective action taken as required.
14.5.5.4* Container Purging, Drying, and Cooldown Proce‐ dures.
14.5.5.4.2 The activities of 14.5.5 shall require the preparation of detailed procedures. 14.5.5.4.3 Only experienced, trained personnel shall dry, purge, or cool down LNG containers. 14.5.5.4.4 Before an LNG container is put into service, the air shall be displaced by an inert gas, following a written purging procedure. 14.5.5.4.5* Before a container is taken out of service, the natural gas in the container shall be purged from the container with an inert gas, following a written purging procedure. 14.5.5.5 During purging operations, the oxygen content of the container or other equipment shall be monitored by the use of an oxygen analyzer. 14.6 Transfer of LNG and Flammables. 14.6.1 Where bulk transfers are made into stationary storage containers, the LNG being transferred shall be compatible in composition or in temperature and density with the LNG already in the container. 14.6.2 Where the composition or the temperature and density are not compatible, means shall be taken to prevent strati�ca‐ tion and vapor evolution that could cause rollover. 14.6.3 Where a mixing nozzle or agitation system is provided, it shall be designed to prevent rollover. 14.6.4 At least one quali�ed person shall be in constant attendance while a transfer is in progress. 14.6.5 Sources of ignition shall not be permitted in loading or unloading areas while transfer is in progress. 14.6.6 Loading and Unloading Tank Vehicle and Tank Car. 14.6.6.1 Sources of ignition shall not be allowed in loading or unloading areas while transfer is in progress. 14.6.6.2 Loading and unloading areas shall be posted with signs that read “No Smoking.”
2016 Edition
--```,`,```,```,`,`,`,``,-`-`,`,`,`,`---
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
59A-50
PRODUCTION, STORAGE, AND HANDLING OF LIQUEFIED NATURAL GAS (LNG)
14.6.6.3 Where multiple products are loaded or unloaded at the same location, loading arms, hoses, or manifolds shall be identi�ed or marked to indicate the product or products to be handled by each system. 14.6.6.4 Prior to transfer, gauge readings shall be obtained or inventory established to ensure that the receiving container cannot be over�lled, and levels shall be checked during trans‐ fer operations. 14.6.6.5 The transfer system shall be checked prior to use to ensure that valves are in the correct position. 14.6.6.6 Transfer operations shall be commenced slowly and if any unusual variance in pressure or temperature occurs, trans‐ fer shall be stopped until the cause has been determined and corrected. 14.6.6.7 Pressure and temperature conditions shall be moni‐ tored during the transfer operation. 14.6.6.8 While tank car or tank vehicle loading or unloading operations are in progress, rail and vehicle traf�c shall be prohibited within 25 ft (7.6 m) of LNG facilities or within 50 ft (15 m) of refrigerants whose vapors are heavier than air. 14.6.6.8.1 Before a tank car is connected, the car shall be checked and the brakes set, the derailer or switch properly positioned, and warning signs or lights placed as required. 14.6.6.8.2 The warning signs or lights shall not be removed or reset until the transfer is completed and the car disconnected. 14.6.6.8.3 Truck vehicle engines shall be shut off if they are not required for transfer operations. 14.6.6.8.4 Brakes shall be set and wheels chocked prior to connection for unloading or loading. 14.6.6.8.5 The engine shall not be started until the truck vehi‐ cle has been disconnected and any released vapors have dissi‐ pated. 14.6.6.9 Oxygen Content. (A) Before LNG is loaded into a tank car or tank vehicle that is not in exclusive LNG service, a test shall be made to deter‐ mine the oxygen content in the container. (B) If the oxygen content exceeds 2 percent by volume, the container shall not be loaded until it has been purged to below 2 percent oxygen by volume. (C) If a tank car or tank vehicle in exclusive LNG service does not contain a positive pressure, it shall be tested for oxygen content. 14.6.6.10 Before loading or unloading, a tank vehicle shall be positioned so it can exit the area without backing up, when the transfer operation is complete. 14.6.6.11 Tank cars and tank vehicles that are top-loaded through an open dome shall be bonded electrically to the �ll piping or grounded before the dome is opened. 14.6.6.12 Communications shall be provided at loading and unloading locations so that the operator can be in contact with other remotely located personnel who are associated with the loading or unloading operation.
14.6.7 Marine Shipping and Receiving. 14.6.7.1 Vessel Arrival. 14.6.7.1.1 The requirements of 14.4.7 shall be communicated to the vessel operator to facilitate safe vessel berthing and unberthing. 14.6.7.1.2 Warning signs or barricades shall be used to indi‐ cate that transfer operations are in progress. 14.6.7.1.3 A vessel-speci�c mooring plan utilizing the criteria developed in 11.5.1 shall be developed for each ship calling at the waterfront facility. 14.6.7.1.4 manner.
The vessel shall be moored in a safe and effective
14.6.7.1.5 The terminal operator shall certify in writing that the provisions of 14.9.5.1 and 14.9.5.3 are met. 14.6.7.1.6 This certi�cation shall be available for inspection at the waterfront facility that handles LNG. 14.6.7.2 Prior to Transfer. 14.6.7.2.1 Before transferring LNG, the facility shall do the following:
(1) Inspect the transfer piping and equipment to be used during the transfer and replace any worn or inoperable parts (2) Note the pressure, temperature, and volume to ensure they are safe for transfer for each of the vessel's cargo tanks from which cargo will be transferred (3) Review and agree with the vessel operator on the sequence of transfer operations (4) Review and agree with the vessel operator on the trans‐ fer rate (5) Review and agree with the vessel operator on the duties, location, and watches of each person assigned for trans‐ fer operations (6) Review emergency procedures from the emergency manual (7) Review and agree with the vessel operator on means (dedicated channels, etc.) of maintaining a direct communication link between the watches on the ship and shoreside throughout the cargo transfer (8) Ensure that transfer connections allow the vessel to move to the limits of its moorings without exceeding the normal operating envelope of the loading arms (9) Ensure that each part of the transfer system is aligned to allow the �ow of LNG to the desired location (10) Verify that the cargo liquid and vapor lines on the vessel, the loading arms, and the shoreside piping systems have been purged of oxygen (11) Ensure that warning signs that warn that LNG is being transferred are displayed (12) Verify that no source of ignition exists in the marine transfer area for LNG (13) Ensure that personnel are on duty in accordance with the operations manual (14) Test the sensing and alarm systems, the emergency shut‐ down system, and the communication systems to deter‐ mine that they are operable 14.6.7.2.2 Prior to transfer, the of�cer in charge of vessel cargo transfer and the person in charge of the shore terminal
2016 Edition
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
` , , ` , ` , , ` , , ` ` , , ` ` , ` , , ` , ` , ` ` ` , , , ` ` ` , ` , , , , ` ` ` -
OPERATING, MAINTENANCE, AND PERSONNEL TRAINING
shall inspect their respective facilities to ensure that transfer equipment is in operating condition.
59A-51
14.6.7.4.4 During transfer of a ship's stores, including nitro‐ gen, personnel involved in the transfer of a ship's stores shall not have simultaneous responsibility involved in the transfer of LNG.
14.6.7.2.3 Following the inspection described in 14.6.7.2.2, the of�cer in charge of vessel cargo transfer and the person in charge of the shore terminal shall meet and determine the transfer procedure, verify that ship-to-shore communications exist, and review emergency procedures.
14.6.7.4.5 Sources of ignition shall not be permitted in the marine transfer area while transfer is in progress. 14.6.7.4.6 General cargo, other than ships' stores for the LNG tank vessel, shall not be handled over a pier or dock within 100 ft (30 m) of the point where connections are made for LNG, and �ammable �uids transfer while LNG or �ammable �uids are being transferred through piping systems.
14.6.7.2.4 After the pretransfer inspection required by 14.6.7.2.1 has been sat isfactorily completed, there shall be no transfer of LNG until a declaration of inspection that demon‐ strates full compliance with 14.6.7.2.2 is executed and signed. (A) One signed copy of the declaration of inspection shall be given to the person in charge of transfer operations on the vessel, and one signed copy shall be retained for 30 days after completion of the transfer at the waterfront facility that handles LNG.
14.6.7.5 Bunkering Operations.
(B) Each declaration of inspection shall contain the following:
14.6.7.5.2 During bunkering operations, the following shall apply:
(1) (2) (3) (4) (5)
14.6.7.5.1 Bunkering operations shall be in accordance with any requirements established by the authority having jurisdic‐ tion over vessels or terminals.
The name of the vessel and the waterfront facility that handles LNG The dates and times that transfer operations began and ended The signature of the person in charge of shoreside trans‐ fer operations and the date and time of signing, indicat‐ ing that he or she is ready to begin transfer operations The signature of each relief person in charge and the date and time of each relief The signature of the person in charge of shoreside trans‐ fer operations and the date and time of signing, indicat‐ ing that the marine transfer has been completed
14.6.7.2.5 The communication system required in 11.9.3 shall be continuously monitored both aboard ship and at the termi‐ nal. 14.6.7.3 Marine Connections. 14.6.7.3.1 When loading arms are connected for marine load‐ ing or unloading operations, all bolt holes in a �ange shall be utilized for the connection. 14.6.7.3.2 Blind �anges shall be utilized on those arms not engaged in loading or unloading operations.
(1) Personnel performing bunkering operations shall not have simultaneous responsibility for the transfer of LNG as cargo. (2) No vessels shall be moored alongside the LNG vessel with‐ out the permission of the authority having jurisdiction. 14.7 Maintenance Manual. 14.7.1* Each operating company shall have a documented plan that sets out inspection and maintenance program requirements for each component used in its LNG facility that is identi�ed as requiring inspection and maintenance. 14.7.2 Each maintenance program shall be conducted in accordance with its documented plan for LNG facility compo‐ nents identi�ed in the plan as requiring inspection and mainte‐ nance. 14.7.3 Each operating company shall perform the periodic inspections, tests, or both, on a schedule that is included in the maintenance plan on identi�ed components and its support system identi�ed as requiring inspection and maintenance that is in service in its LNG facility.
14.6.7.3.3 All connections shall be leaktight and tested prior to operation.
14.7.4 The maintenance manual shall refer to maintenance procedures, including procedures for the safety of personnel and property while repairs are carried out, regardless of whether the equipment is in operation.
14.6.7.3.4 Marine loading or unloading arms shall be purged prior to use and purged and completely drained upon comple‐ tion of transfer.
14.7.5 The maintenance manual shall include the following for LNG facility components:
14.6.7.3.5 Marine loading or unloading operations shall be at atmospheric pressure when the arm(s) are connected or disconnected. 14.6.7.4* Transfer Operations in Progress. 14.6.7.4.1 Vehicle traf�c shall be prohibited on the pier or dock within 100 ft (30 m) of the loading and unloading mani‐ fold while transfer operations are in progress.
(1) The manner of carrying out and the frequency of inspec‐ tions and tests (2) A description of any other action, in addition to those referred to in 14.7.5, that is necessary to maintain the LNG facility in accordance with this standard (3) All procedures to be followed during repairs on a compo‐ nent that is operating while it is being repaired, to ensure the safety of persons and property at the LNG plant
14.6.7.4.2 Warning signs or barricades shall be used to indi‐ cate that transfer operations are in progress.
14.7.6 Procedures for the inspection of all pipe-in-pipe components, including vacuum levels, shall be speci�ed and demonstrated to be appropriate for the installed condition.
14.6.7.4.3* There shall be two independent means of egress, including emergency egress, from the ship.
14.7.7 Procedures for the repair and maintenance of all pipe in pipe components, including vacuum levels, shall be speci�ed
2016 Edition
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
` , , ` , ` , , ` , , ` ` , , ` ` , ` , , ` , ` , ` ` ` , , , ` ` ` , ` , , , , ` ` ` -
59A-52
PRODUCTION, STORAGE, AND HANDLING OF LIQUEFIED NATURAL GAS (LNG)
and demonstrated to be appropriate for the installed condi‐ tion. 14.8 Maintenance. 14.8.1* Each operating company shall ensure that compo‐ nents in its LNG facility that could accumulate combustible mixtures are purged after being taken out of service and before being returned to service. 14.8.2 Where the operation of a component that is taken out of service could cause a hazardous condition, a tag bearing the words “Do Not Operate,” or the equivalent, shall be attached to the controls of the component, or the component shall be locked out. 14.8.3 Foundation. 14.8.3.1 The support system or foundation of each compo‐ nent shall be inspected at least annually. 14.8.3.2 If the foundation is found to be incapable of support‐ ing the component, it shall be repaired. 14.8.4 Emergency Power. Each emergency power source at the LNG plant shall be tested monthly to ensure that it is operational. Annual testing of the emergency power source shall also be conducted to ensure that it is capable of perform‐ ing at its documented intended capacity, taking into account the power required to start some and simultaneously operate other equipment that would be served by the power source in a plant emergency. 14.8.5 Insulation systems for impounding surfaces shall be inspected annually. 14.8.6 Hoses for LNG and refrigerant transfer shall be tested at least annually to the maximum pump pressure or relief valve setting and shall be inspected visually before each use for damage or defects. 14.8.7 Marine loading or unloading operations shall be peri‐ odically tested as required by the authority having jurisdiction. 14.8.8 Repairs. Repairs that are carried out on components of an LNG facility shall be carried out in a manner that ensures the following:
(1) That the integrity of the components is maintained, in accordance with this standard (2) That components operate in a safe manner (3) That the safety of personnel and property during a repair activity is maintained 14.8.9 Site Housekeeping. Each operating company shall do the following:
(1) Keep the grounds of its LNG plant free from rubbish, debris, and other materials that could present a �re hazard (2) Ensure that the presence of foreign material contami‐ nants or ice is avoided or controlled to maintain the operational safety of each LNG facility component (3) Maintain the grassed area of its LNG plant so that it does not create a �re hazard. (4) Ensure that �re control access routes within its LNG plant are unobstructed and reasonably maintained in all weather conditions
14.8.10 Control Systems, Inspection, and Testing. 14.8.10.1 Each operating company shall ensure that a control system that is out of service for 30 days or more is tested prior to returning it to service, to ensure that it is in proper working order. 14.8.10.2 Each operating company shall ensure that the inspections and tests in this section are carried out at the inter‐ vals speci�ed. 14.8.10.3 Control systems that are used seasonally shall be inspected and tested before use each season. 14.8.10.4 Control systems that are used as part of the �re protection system at the LNG facility shall be inspected and tested in accordance with the applicable �re code and conform to the following:
(1) Monitoring equipment shall be maintained in accord‐ ance with NFPA 72 and NFPA 1221. (2) Fire protection water systems shall be maintained in accordance with NFPA 13, NFPA 14, NFPA 15, NFPA 20, NFPA 22, NFPA 24, NFPA 25, NFPA 750, and NFPA 1962. (3)* Portable or wheeled �re extinguishers suitable for gas �res shall be available at strategic locations, as deter‐ mined in accordance with Chapter 12, within an LNG facility and on tank vehicles and shall be maintained in accordance with NFPA 10. (4) Fixed �re extinguishers and other �re control equipment shall be maintained in accordance with NFPA 11, NFPA 12, NFPA 12A, NFPA 16, NFPA 17, and NFPA 2001. 14.8.10.5 Control systems, other than those referred to in 14.8.10.3 and 14.8.10.4, shall be inspected and tested once each calendar year at intervals that do not exceed 15 months. 14.8.10.6 Stationary LNG tank relief valves shall be inspected and set-point tested at least once every 2 calendar years, with intervals not exceeding 30 months, to ensure that each valve relieves at the proper setting. 14.8.10.7 All other relief valves protecting hazardous �uid components shall be randomly inspected and set-point tested at intervals not exceeding 5 years plus 3 months. 14.8.10.8 Stop valves for isolating pressure or vacuum-relief valves shall be locked or sealed open. 14.8.10.9* Stop valves shall not be operated except by an authorized person. 14.8.10.10 An LNG container shall have no more than one stop valve closed at one time. 14.8.10.11 When a component is served by a single safety device and the safety device is taken out of service for mainte‐ nance or repair, the component shall also be taken out of serv‐ ice, unless safety is accomplished by an alternative means. 14.8.11 LNG Storage Tanks. The external surfaces of LNG storage tanks shall be inspected and tested as set out in the maintenance manual for the following:
(1) Inner tank leakage (2) Soundness of insulation (3) Tank foundation heating, to ensure that the structural integrity or safety of the tanks is not affected
2016 Edition
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
` , , ` , ` , , ` , , ` ` , , ` ` , ` , , ` , ` , ` ` ` , , , ` ` ` , ` , , , , ` ` ` -
OPERATING, MAINTENANCE, AND PERSONNEL TRAINING
14.8.12 Meteorological and Geophysical Events. 14.8.12.1 LNG storage facilities and, in particular, the storage container and its foundation shall be externally inspected after each major meteorological disturbance to ensure that the structural integrity of the LNG facility is intact. 14.8.12.2 If a potentially damaging geophysical or meteoro‐ logical event occurs, the following shall be accomplished:
(1) (2) (3)
The plant shall be shut down as soon as is practical. The nature and extent of damage, if any, shall be deter‐ mined. The plant shall not be restarted until operational safety is re-established.
14.8.13 Corrosion Control. 14.8.13.1 Each operating company shall ensure the following for metallic components of its LNG facility that could be adversely affected wit h respect to integrity or reliability by corrosion during their service life:
59A-53
14.8.13.12 Components that will not be adversely affected by internal corrosion during the time that the component will be in use in LNG facilities shall be exempt from the requirements of 14.8.13. 14.8.13.13 If it is discovered by inspection or otherwise that corrosion is not being controlled at the LNG facilities, neces‐ sary actions to control or monitor t he corrosion shall be taken. 14.9 Personnel Training. 14.9.1 Every operating plant shall have a written training plan to instruct all LNG plant personnel. 14.9.2 The training plan shall include training of permanent maintenance, operating, and supervisory personnel with respect to the following:
14.8.13.3 Each impressed current power source shall be instal‐ led and maintained such that it does not interfere with any communication or control system at the LNG plant.
(1) The basic operations carried out at the LNG facility (2) The characteristics and potential hazards of LNG and other hazardous �uids involved in operating and main‐ taining the LNG facility, including the serious danger from frostbite that can result from contact with LNG or cold refrigerants (3) Methods of carrying out the duties of maintaining and operating the LNG facility as set out in the manual of operating and maintenance procedures referred to in Section14.3 and Section 14.7 (4) LNG transfer procedures (5) Fire prevention, including familiarization with the �re control plan of the LNG plant, �re �ghting, the potential causes of �re in an LNG plant, and the types, sizes, and likely consequences of a �re at an LNG plant (6) Recognition of situations when it would be necessary to obtain assistance in order to maintain the security of the LNG plant
14.8.13.4* Every operating company shall monitor the corro‐ sion control provided in accordance with Section 9.10.
14.9.3 All LNG plant personnel shall meet the following requirements:
14.8.13.5 Each buried or submerged component that is cath‐ odically protected shall be surveyed at least once each calendar year at intervals that do not exceed 15 months, to ensure that the system meets the corrosion control requirements of appli‐ cable standards.
(1) LNG plant personnel shall receive the training referred to in 14.9.2. (2) LNG plant personnel shall have experience related to their assigned duties.
(1) Protection from corrosion in accordance with Section 9.10 (2) Inspection and replacement or repair under a program of scheduled maintenance in accordance with the manual referred to under Section 14.3 14.8.13.2 Each operating company shall ensure that each component of its LNG facilities that is subject to interference from an electrical current is protected so that the electrical interference is minimized.
14.8.13.6 Each cathodic protection recti�er or impressed current system shall be inspected at least six times each calen‐ dar year at intervals that do not exceed 2 1 ∕ 2 months, to ensure that it is operating properly. 14.8.13.7 Interference bonds shall be inspected at least once each calendar year at intervals that do not exceed 15 months. 14.8.13.8 Each exposed component that is subject to corro‐ sion from the atmosphere shall be inspected at intervals that do not exceed 3 years. 14.8.13.9* Components covered by insulation that are subject to external corrosion shall be periodically monitored based upon a written corrosion control program. 14.8.13.10 Where a component is protected from internal corrosion by a coating or inhibitors, monitoring devices designed to detect internal corrosion, such as coupons or probes, shall be located where corrosion is most likely to occur. 14.8.13.11 Internal corrosion control monitoring devices shall be checked at least two times each calendar year at intervals not exceeding 71 ∕ 2 months.
14.9.4 Any person who has not completed the training or received experience set out in 14.9.2 shall be under the control of trained personnel. 14.9.5 Marine Transfer Training. All persons involved in the marine transfer of LNG shall be thoroughly familiar with all aspects of the transfer procedure, including potential hazards and emergency procedures. 14.9.5.1 Training for personnel involved in the marine trans‐ fer of LNG shall include the following:
(1) LNG transfer procedures, including practical training under the supervision of a person with such experience as determined by the terminal operator (2) The provisions of the contingency plan required in 14.4.7 14.9.5.2 Time spent assisting in the transfer shall ful�ll this practical training requirement. 14.9.5.3 Each person involved in the shoreside transfer opera‐ tions shall have been trained in accordance with the require‐ ments of 14.9.2 and shall have the f ollowing:
(1) At least 48 hours of LNG transfer experience (2) Knowledge of the hazards of LNG
2016 Edition --```,`,```,```,`,`,`,``,-`-`,`,`,`,`---
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
PRODUCTION, STORAGE, AND HANDLING OF LIQUEFIED NATURAL GAS (LNG)
59A-54
(3) Familiarity with the provisions of Chapter 11 (4) Knowledge of the procedures in the terminal's operations manual and emergency manual 14.9.6 Refresher Training. 14.9.6.1 Persons who are required to receive the training in 14.9.2 or 14.9.5 shall receive refresher training in the same subjects at least once every 2 years. 14.9.6.2 Performing actual loading or unloading operations, under the observation of a quali�ed individual, shall ful�ll the requirement for refreshing of practical training in 14.9.5.
that the individual risk and the societal risk do not exceed tolerable levels in accordance with Section 15.9. 15.2.3 If the plant is modi�ed or other conditions change, the plant risk may change. Therefore, reassessments of plant risk shall be undertaken at the earlier of:
(1) When conditions change as a direct consequence of actions and signi�cant modi�cations undertaken by the plant (2) Every 5 years (3) As required by the authority having jurisdiction (AHJ)
14.10 Records.
15.3 De�nitions. The following de�nitions shall apply only to usage in Chapter 15.
14.10.1 Each operating company shall maintain for a period of not less than 5 years a record of the date and type of each maintenance activity performed on each component of the LNG facility, including a record of the date that a component is taken out of or placed into ser vice.
15.3.1* As Low as Reasonably Practicable (ALARP). The level of risk that represents the point, objectively assessed, at which the time, dif�culty and cost of further reduction measures become unreasonably disproportionate to the additional risk reduction obtained.
14.10.2 Records shall be made available during business hours upon reasonable notice.
15.3.2 Event. The combination of successive outcomes of LNG, �ammable �uids, �ammable refrigerants or toxic mate‐ rial release and its subsequent hazard to persons exposed.
14.10.3 For the life of the LNG facility, each LNG facility oper‐ ator shall maintain records of each test, survey, or inspection required by this standard in detail suf�cient to demonstrate the adequacy of corrosion control measures. 14.10.4 A record of all training shall be maintained for each employee of an LNG facility, and the records shall be main‐ tained for at least 2 years after the date that the employee ceases to be employed at the LNG facility. Chapter 15 Performance (Risk Assessment) Based LNG Plant Siting 15.1 Scope. 15.1.1 This chapter includes the calculation of risks to persons outside the boundary of a lique�ed natural gas (LNG) plant, arising from potential releases of LNG and other hazardous substances stored, transferred, or handled in the plant. 15.1.2 Where approved, the requirements of this chapter shall be complied with, in LNG facility siting and layout analysis, as an alternative to the assessments required in Chapter 5 of this code. 15.1.3 The provisions of this chapter are applicable to newly proposed facilities and existing facilities where signi�cant modi�cations and improvements are proposed. Only the modi‐ �cations and improvements in existing facilities shall be subject to the requirements of this chapter. 15.1.4 The chapter does not include the assessment of risks from LNG or other hazardous materials associated with the plant arising from transportation caused releases outside the plant boundary.
15.3.3* Individual Risk. The frequency, expressed in number of realizations per year, at which an individual, with continuous potential exposure, may be expected to sustain a serious or fatal injury. 15.3.4 Societal Risk. The cumulative risk exposure by all persons sustaining serious or fatal injury from an event in the LNG plant. 15.4 Risk Calculations and Basis of Assessment. 15.4.1* Both individual risks and societal risk(s) values shall be evaluated in the area around the LNG plant by using quanti‐ tative risk analysis (QRA) protocol. The generally accepted QRA protocol, speci�ed in any one of the following publica‐ tions shall be used in assessing the risks:
(1) American Institute of Chemical Engineers (AIChE) Center for Chemical Process Safety (CCPS), “Guidelines for Chemical Process Quantitative Risk Analysis,” 2000 (2) “Five Steps to Risk Assessment,” INDC 163, rev. 1, Health and Safety Executive, 1998 (3) “Risk Criteria for Land-use Planning in the Vicinity of Major Industrial Hazards,” HMSO, Health and Safety Executive, 1989 (4) “Risk Management–Risk Assessment Techniques,” BSI EN 31010:2010, European Norm Standard (5) TNO, “Guidelines for Quantitative Risk Assessment, RIVM, The Purple Book,” Netherlands, 2005 15.4.2* The selected QRA procedure shall be approved by the AHJ.
15.2.1 LNG plants shall be designed and located in such areas as to not pose intolerable risks to the surrounding populations, installations, or property.
15.4.3 Individual risks shall be presented in the form of contours of constant individual risk values. Societal risk shall be presented in the form of a diagram of cumulative annual frequency of casualty exceedance vs. the number of exposed population subject to the casualty (i.e., the F-N plot). Uncer‐ tainty values in the calculation of the risks (both frequency and casualty) shall be included in the diagram.
15.2.2* The requirements of this chapter shall be used to assess the level of risks to surrounding population to ensure
15.4.4 Risks calculated shall be compared with values of risks to which the population in the general vicinity of the
15.2 General Requirements.
2016 Edition --```,`,```,```,`,`,`,``,-`-`,`,`,`,`---
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
PERFORMANCE (RISK ASSESSMENT) BASED LNG PLANT SITING
59A-55
proposed/existing plant may be subject due to natural causes or from other human activities.
periods of time acceptable to obtain statistically meaningful data or from the nearest met eorological station.
15.5 LNG and Other Hazardous Materials Release Scenarios.
15.7.2 The frequency of occurrence of different weather and other environmental parameters with conditional probabilities of occurrence of 25 percent, 50 percent, 75 percent and 99 percent shall be documented and considered in hazard calculations. These environmental parameters shall include wind speed, wind direction, atmospheric temperature, atmos‐ pheric relative humidity, and ground/water substrate tempera‐ ture (if available).
15.5.1 Catalog of Scenarios of Release. A spectrum of LNG and other hazardous material release scenarios from transfer piping, storage tank(s), vaporizer(s) and other vulnerable equipment in the plant shall be developed through the use of process hazard analyses (PHAs), HAZOP, or other thorough, systematic hazard-identi�cation studies and scenario evalua‐ tions acceptable to the AHJ. In addition, the spectrum of relea‐ ses shall include those identi�ed as design spills in 5.3.3.7. Credible large-release scenarios that may pose risks outside the property line shall also be included along with their occurrence probabilities. 15.5.2 Release Speci�cations. 15.5.2.1 The release rates and durations (and when necessary the total release quantity) of LNG and other hazardous mate‐ rial releases shall be calculated for the scenarios of release identi�ed in 15.5.1. 15.5.2.2 The calculation of the rate of release shall document the following:
(1)
(2)
The hole or puncture sizes and upstream conditions consistent with the different storage conditions and appurtenances considered in the release scenarios identi‐ �ed in Section 15.5.1. The thermodynamic condition, including the pressure and temperature, of the �uid upstream of the release point
15.5.2.3 The thermal and physical characteristics of the substrate exposed to a release shall be considered in analyzing the subsequent behavior of the �uid released. 15.5.2.4 The spectrum of hazardous behavior of the released �uid due to its interaction with the substrate, the environment, and natural tendencies shall be considered and documented. These behavior modes that shall be considered include, but not limited to, �ashing, aerosol formation, liquid jetting, pool formation and �ow, dispersion of vapors, jet �res, �ash �res, explosions, �reballs, pool �res, BLEVES, and liquid water inter‐ action effects. 15.6 Release Probabilities and Conditional Probabilities. 15.6.1* The annual probability of LNG and other hazardous material releases from various equipment, for scenarios identi‐ �ed in 15.4.1 and 15.4.2, shall be based on Table 15.6.1. 15.6.2 Site-speci�c modi�cations to the probability values in Table 15.6.1 shall be considered and, if used in subsequent analysis, shall be approved. 15.6.3 The conditional probability for each type of hazardous behavior, identi�ed pursuant to the requirements in 15.5.2.4, shall be obtained from the AHJ approved conditional probabil‐ ity databases. 15.6.4 The details of values of probabilities used in the calcu‐ lations and the sources of data shall be documented. 15.7 Environmental Conditions and Occurrence Probabilities. 15.7.1 Site speci�c statistics on the environmental conditions shall be gathered either by direct measurements at the site for
15.7.3 Topographic and structural features in the vicinity of the proposed plant site that impact on the consequence of the released �uid shall be considered in the assessment of hazards. These features include, but are not limited to, liquid momen‐ tum for dike overtopping assessment, aerodynamic roughness of the site and surrounding area for dispersion behavior of vapors, and congestion due to plants, shrubs, and trees and its effect on potential vapor explosions. Table 15.6.1 Example Component Failure Database
Component Atmospheric cryogenic tanks (1) Instantaneous failure of primary container and outer shell, release of entire contents (single containment tank) (2) Instantaneous failure of primary container and outer shell, release of entire contents (double containment tank) (3) Instantaneous failure of primary and secondary container, release of entire contents (full and membrane containment tanks) Pressurized storage (Containers) — instantaneous release of entire contents Pressure relief valves — out�ow at the maximum rate Process equipment (1) Pumps — catastrophic failure (2) Compressors with gasket — catastrophic failure (3) Heat exchanger — instantaneous release of entire contents from plate heat exchanger Transfer equipment — rupture of loading/unloading arm Piping — aboveground
(1) Rupture for nominal diameter <3 in. (75 mm) (2) Rupture for nominal diameter from 3 in. (75 mm)up to and including 6 in. (150 mm) (3) Rupture for nominal diameter >6 in. (150) mm
Annual Probability of Failure
5E-07
1.25E-08
1E-08 5E-07 2E-05 1E-04 1E-04 5E-05 3E-08 Annual probability of failure per meter
1E-06 3E-07 1E-07 2016 Edition
` ` ` , , , , ` , ` `
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
PRODUCTION, STORAGE, AND HANDLING OF LIQUEFIED NATURAL GAS (LNG)
59A-56
15.7.4 The location and characteristics of vapor ignition sour‐ ces in and around the plant shall be surveyed and documented as follows:
(1) The probabilities of ignition sources being active during the dispersion of a vapor cloud shall be assessed and approved (2) The probabilities, including conditional probabilities of occurrence of various environmental parameters, deter‐ mined pursuant to the requirements of 15.7.1 through 15.7.4 shall be documented.
Table 15.8.4.1 Radiant Heat Flux and Thermal Dosage Outside the Plant Boundary Maximum Heat Flux Level (kW/m2)
Maximum Modi�ed Dosage Unit ([kW/m2]4/3s)
5.0
500
At least 10 persons would suffer second-degree skin burns on at least 10% of their bodies within 30 seconds of exposure to the �re.
5.0
300
At least one person inside the building would suffer second-degree skin burns on at least 10% of the body within 30 seconds of exposure to the �re.
32
N/A
Loss of strength of structural steel exposed to the �re to an extent that its primary load-bearing capacity is reduced signi�cantly over the duration of LNG �re being analyzed.
15.8 Hazard and Consequence Assessment. 15.8.1 The hazard consequences of releases identi�ed pursuant to the requirements in 15.4 shall be assessed. 15.8.2 For each identi�ed scenario of release, type of hazard behavior, weather, and environmental or other condition (e.g., time to detect, response time, blow-down, ignition of a vapor cloud at different distances, effects of obstructions, effects of passive mitigation techniques) impacting the hazard areas or hazard distances shall be determined by accepted methods, including those identi�ed in 5.3.3.4 through 5.3.3.9. 15.8.3 The following types of hazards and calculations of extent of hazard shall be considered, as a minimum:
(1) Distance to limit concentration levels arising from gas/ vapor dispersion (2) Distance to limit heat �ux or heat dosage levels arising from pool �re exposures (3) Distance to limit heat �ux or heat dosage levels arising from vapor �res (4) Distance to limit heat �ux or heat dosage levels arising from �reballs (5) Distance to limit overpressure levels arising from explo‐ sions (6) Distances to other hazards from rapid phase transition (RPT), toxic releases and so forth 15.8.3.1 Potential cascading damages from primary release scenarios identi�ed in 15.5.1 within the plant boundaries shall be considered and evaluated. If the assessment identi�es signif‐ icant hazards from cascading in-plant failures or external outof-plant events, the risk calculation shall include the cascading effects. 15.8.4 The distances to various types of hazards shall be calcu‐ lated using mathematical models in accordance with 15.8.4.1 through 15.8.4.4. 15.8.4.1 Distances to safe levels of radiant heat �uxes and modi�ed thermal dosage values speci�ed in Table 15.8.4.1 and Table 15.8.4.2 shall be calculated with a model that meets the following criteria:
(1) Takes into account the physical phenomena observed and has been validated with available experimental data, including applicable experimental LNG �re published in the literature (2) Has been published in an archival, peer-reviewed scien‐ ti�c journal in the related scienti�c/engineering disci‐ plines, including, but not limited to, �uid dynamics, heat transfer, combustion, or �re science (3) Has been veri�ed to accurately represent the physics (4) Has a scienti�c assessment of the details of the physics, analysis, and execution process (5) Has been approved by the AHJ ` ` ` , , , , ` , ` ` ` , , , ` ` ` , ` , ` , ,
Consequences
15.8.4.2* Distances to vapor dispersion to concentrations equal to the lower �ammability limit (LFL) (volume concentra‐ tion value 5 percent) shall be calculated using a model that is acceptable for use by the AHJ or a model that has been evalu‐ ated by an independent body using the Model Evaluation Protocol facilities published in the Fire Protection Research Foundation report “Evaluating Vapor Dispersion Models for Safety Analysis of LNG Facilities.” Alternatively, distances to the occurrences of ignition of a vapor cloud shall be calculated using a methodology that is acceptable to the AHJ. 15.8.4.3 Hazard distances for damage criteria speci�ed in Table 15.8.4.3 for scenarios of vapor cloud explosions shall be based on mathematical models approved by the AHJ. 15.8.4.4 RPT and other phenomena hazard distances shall be determined with models approved by the AHJ. 15.8.5 For each identi�ed scenario of release and type of hazard identi�ed in Section 15.5 and hazard distances or areas evaluated in Section 15.8, the total number of persons located within the hazard distance or area shall be enumerated using public demographic or census data or other methodology approved by the AHJ. 15.8.6 Other hazard criteria for exposure to persons and property damage from potential exposures to different types of hazards indicated in Annex A shall be used as a guide in the hazard assessment required under Section 15.8. 15.8.7 The values of the hazard criteria used and the scienti�c justi�cation or source of information shall be documented.
2016 Edition
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
PERFORMANCE (RISK ASSESSMENT) BASED LNG PLANT SITING
59A-57
Table 15.8.4.2 Criteria for Property Damage Due to Radiant Heat from Fires
Exposed Structure
Type of Construction/Occupancy
Adjacent LNG container
Reinforced concrete
Threshold Damage Criteria
(1) Temperature of no part of the exposed concrete outer surface of the container structure shall exceed 1000°F (540°C) over the duration of the �re. (2) Temperature of steel reinforcements in pre-stressed concrete shall not exceed 570°F (300°C) over the duration of the �re.
Steel structures
Temperature shall not exceed 570°F (300°C) over the duration of the �re.
Wooden structures
Net heat �ux into the structure shall not exceed 8115 Btu/hr-ft 2 (26,500 w/m2) for unpiloted ignition or 4660 Btu/hr-ft 2 (14,700 w/m2) for piloted ignition.
` ` ` , , , , ` , ` ` ` , , , ` ` ` , ` , ` , , ` , ` ` , , ` ` , , ` , , ` , ` , , ` -
15.9 Risk Result Presentation.
Table 15.8.4.3 Blast Damage Criteria
15.9.1 Risk Contours of Constant Individual Risks. 15.9.1.1 The individual risk values for various combinations of release scenarios, materials released, and environmental and substrate conditions shall be combined with the various event occurrence probabilities to calculate the risk posed to an indi‐ vidual inside the plant boundary and outside the plant boun‐ dary. 15.9.1.2 Individual risk values shall be calculated for various distances in different compass directions from the event loca‐ tion. 15.9.1.3 Contours of constant individual risks shall be devel‐ oped. 15.9.1.4 The uncertainty in calculating the individual risks shall be enumerated and presented. 15.9.2 Societal Risks on F-N Diagrams.
Re�ected Damage Overpressure (N/m2)
Overpressure Damage Category
Lower Limit
Upper Limit
250
4,000
5,000
10,000
15,000 25,000
20,000 50,000*
Window glass damage Damage to doors, cladding, and persons Severe structural damage to buildings Severe injury to people *Complete demolition of a building.
geographic location of the site and other local risk acceptability norms, if any.
15.9.2.1 The potential number of exposed persons that may occur as a result of an event and combination of other parame‐ ters shall be determined using the approved local demographic data and the calculated hazard distances or areas.
15.10.4 The criteria used for the tolerable individual risk and the societal risk, as modi�ed, shall be approved.
15.9.2.2* The societal risk values shall be presented in the form of cumulative annual frequency of exceedance of a speci‐ �ed number of fatalities vs. number of fatalities.
15.11.1* In the case that the calculated risks are in the unac‐ ceptable region or lie in regions between the lower and upper bound acceptable ranges, reduction of risks to tolerable levels shall be considered by implementing additional mitigation measures.
15.9.2.3 Estimated error values in the calculation of both the cumulative annual frequency of speci�ed casualty exceedance and the number of casualties shall be indicated on the F-N plots. The details of the error est imations shall be documented. 15.10 Risk Tolerability Criteria. 15.10.1 Individual risk acceptability criteria speci�ed in Table 15.10.1 shall be used.
15.11 Risk Mitigation Approaches.
15.11.2* Mitigation measures shall include, but not limited to, incorporation of the latest technology and instruments in plant design, improved equipment layout design, use of upgraded equipment, improved spill noti�cation and emergency response procedures, and operational changes. 15.11.3* Mitigation measures proposed shall be approved.
15.10.2* The societal risk acceptability criteria speci�ed in Table 15.10.2 and illustrated in Figure 15.10.2 shall be used. 15.10.3 The acceptability criteria used in sections 15.10.1 and 15.10.2 shall be suitably modi�ed taking into consideration the
2016 Edition
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
PRODUCTION, STORAGE, AND HANDLING OF LIQUEFIED NATURAL GAS (LNG)
59A-58
Table 15.10.1 Criteria for Tolerability of Individual Risk (IR) from Injury Due to Exposure to Dangerous Dose or Higher Criterion Annual Frequency
Remarks
Not permitted: Residential, of�ce, and retail Permitted: Occasionally occupied developments (e.g., pump houses, transformer stations)
Zone 1 IR > 10−5
Zone 2 10−6 ≤ IR ≤ 10 −5
Zone 3 3 × 10−7 ≤ IR ≤ 10 −6
Not permitted: Shopping centers, large-scale retail outlets, restaurants, etc. Permitted: Work places, retail and ancillary services, residences in areas of 28 to 90 persons/hectare density Not permitted: Churches, schools, hospitals, major public assembly areas, and other sensitive establishments Permitted: All other structures and activities
Table 15.10.2 Criteria for Tolerability of Societal (Fatalities) Risks Criterion Annual Frequency (CAF)
Remarks
F = 10−4, N = 10 Slope = −1
Unacceptable above the line de�ned by the CAF column
F = 10−6, N = 10 Slope = −1
Broadly acceptable below the line de�ned by the CAF column Acceptable with AHJ review in the region between the two lines above
ALARP
F = Annual probability of experiencing N or more fatalities
Annex A Explanatory Material Annex A is not a part of the requirements of this NFPA document but is included for informational purposes only. This annex contains explan‐ atory material, numbered to correspond with the applicable text para‐ graphs. A.1.1 This standard establishes essential requirements and standards for the design, installation, and safe operation of lique�ed natural gas (LNG) facilities. It provides guidance to all persons concerned with the construction and operation equipment for the production, storage, and handling of LNG. It is not a design handbook, and competent engineering judg‐ ment is necessary for its proper use.
At suf�ciently low temperatures, natural gas lique�es. At atmospheric pressure, natural gas can be lique�ed by reducing its temperature to approximately −260°F (−162°C).
10 –2
s e i t i l a t a f N g n i d e e c x e f o y c n e u q e r f l a u n n A
10 –3 Unacceptable risks
10 –5 ALARP
10
Risk reduction strategies should be evaluated
–6
10 –7 Tolerable risks 10 –8
10 –9 1
10
100
1,000
10,000
Number of fatalities (N)
FIGURE 15.10.2 Acceptability Regions of Societal (Injury) Risk in the F-N Domain.
Upon release from the container to the atmosphere, LNG will vaporize and release gas that, at ambient temperature, has about 600 times the volume of the liquid. Generally, at temper‐ atures below approximately −170°F (−112°C), the gas is heavier than ambient air at 60°F (15.6°C). However, as its temperature rises, it becomes lighter than air. Note that the −260°F (−162°C) temperature value is for methane. If the other constituents are present, see 3.3.15. For information on the use of LNG as a vehicle fuel, see NFPA 52. A.1.3 Departure from the requirements of this standard can be considered by the authority having jurisdiction on the basis of a risk assessment. In the case of such departures, approval will be contingent upon a demonstration of �tness for purpose in line with the principles of this standard and other applicable recognized standards as well as recognized and generally accep‐ ted good engineering practice.
A risk approach justi�cation of alternatives can be applicable either to the LNG plant as a whole or to individual systems, subsystems, or components. The boundaries of the compo‐ nents and systems of the LNG plant to which a risk-based assess‐ ment is applied are to be logical. As appropriate, account must be given to remote hazards outside the bounds of the system under consideration. Such account must include incidents relating to remote hazards directly affecting or being in�u‐ enced by the system under consideration. The authority having jurisdiction can consider the application of risk-based techni‐ ques in the design, construction, operation, and maintenance of the LNG plant. Portions of the LNG plant not included in the risk assess‐ ment are to comply with the applicable parts of this standard. Designers, fabricators, constructors, and operators request‐ ing approval by the authority having jurisdiction are responsi‐ ble for the following:
2016 Edition
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
` , , ` , ` , , ` , , ` ` , , ` ` , ` , , ` , ` , ` ` ` , , , ` ` ` , ` , , , , ` ` ` -
10 –4
Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
ANNEX A
(1) (2) (3) (4)
Risk acceptance criteria Hazard identi�cation Risk assessment Risk management
59A-59
vapor resulting from evaporation in the event of product leak‐ age from the primary liquid container.
A.1.5 If a value for a measurement as given in this standard is followed by an equivalent value in other units, the �rst stated value should be regarded as the requirement. A given equiva‐ lent value should be considered to be approximate. A.2.1 The intent of the committee is to adopt the latest edition of the referenced publications unless otherwise stated. A.3.2.1 Approved. The National Fire Protection Association does not approve, inspect, or certify any installations, proce‐ dures, equipment, or materials; nor does it approve or evaluate testing laboratories. In determining the acceptability of installa‐ tions, procedures, equipment, or materials, the authority having jurisdiction may base acceptance on compliance with NFPA or other appropriate standards. In the absence of such standards, said authority may require evidence of proper instal‐ lation, procedure, or use. The authority having jurisdiction may also refer to the listings or labeling practices of an organi‐ zation that is concerned with product evaluations and is thus in a position to determine compliance with appropriate standards for the current production of listed items. A.3.2.2 Authority Having Jurisdiction (AHJ). The phrase “authority having jurisdiction,” or its acronym AHJ, is used in NFPA documents in a broad manner, since jurisdictions and approval agencies vary, as do their responsibilities. Where public safety is primary, the authority having jurisdiction may be a federal, state, local, or other regional department or indi‐ vidual such as a �re chief; �re marshal; chief of a �re preven‐ tion bureau, labor department, or health department; building of�cial; electrical inspector; or others having statutory author‐ ity. For insurance purposes, an insurance inspection depart‐ ment, rating bureau, or other insurance company representative may be the authority having jurisdiction. In many circumstances, the property owner or his or her designa‐ ted agent assumes the role of the authority having jurisdiction; at government installations, the commanding of�cer or depart‐ mental of�cial may be the authority having jurisdiction. A.3.3.4.3.1 Double Containment Tank System. A double containment tank system consists of a liquidtight and vapor‐ tight primary tank system, which is itself a single containment tank system, built inside a liquidtight secondary liquid container. The primary liquid container is of low-temperature metal or prestressed concrete. The secondary liquid container is designed to hold all the liquid contents of the primary container in the event of leaks from the primary container, but it is not intended to contain or control any vapor resulting from product leakage from the primary container. The annular space between the primary container and the secondary container must not be more than 20 ft (6 m). The secondary liquid container is constructed either from metal or of prestressed concrete. Refer to API 625, Tank Systems for Refriger‐ ated Lique�ed Gases, for further de�nition. A.3.3.4.3.2 Full Containment Tank System. A full contain‐ ment tank system consists of a liquidtight primary container and a liquidtight and vaportight secondary container. Both are capable of independently containing the product stored. The primary liquid container is of low-temperature metal or prestressed concrete. The secondary container must be capable of both containing the liquid product and controlling the
The secondary liquid container and roof are constructed either from metal or of prestressed concrete. Where concrete outer tanks are selected, vapor tightness during normal service must be ensured through the incorporation of a warm temper‐ ature vapor barrier. Under inner tank leakage (emergency) conditions, the material of the secondary concrete tank vapor barrier material will be exposed to cryogenic conditions. Vapor barrier liners are not expected to remain vaportight in this condition; however, the concrete must be designed to remain liquidtight and retain its liquid containment ability. Product losses due to the permeability of the concrete are acceptable in this case. For certain low temperature products, signi�cant design issues arise at monolithically connected outer tank baseto-wall joints due to the mechanical restraint offered by the base. To mitigate these issues, it is normal practice to include a secondary liquid containment bottom and thermal corner protection to protect and thermally isolate this monolithic area from the cold liquid and provide liquid tightness. Refer to API 625 for further de�nition. A.3.3.4.3.3 Membrane Containment Tank System. A membrane containment tank system consists of a thin metal liquidtight barrier resting against load-bearing thermal insula‐ tion and supported by a free-standing outer pre-stressed concrete container.
In normal conditions, primary liquid and vapor containment is provided by a thin metallic barrier that is structurally suppor‐ ted via load-bearing insulation on an outer pre-stressed concrete container. Under these conditions, primary vapor containment is provided by a thin metallic barrier that is connected to the metallic roof liner. In emergency conditions, the secondary liquid and vapor containment is provided by an outer pre-stressed concrete container and metallic roof liner. The outer container must be capable of both containing the liquid product and controlling the vapor resulting from evaporation. In this instance, the vapor generated from the leakage is discharged through pres‐ sure relief valves located in the roof. Vapor losses due to perme‐ ability through the outer pre-stressed concrete are acceptable while the wall is containing liquid in the event of leakage from the thin metal barrier and insulation system. The roof of the outer pre-stressed concrete container can be concrete or steel. Signi�cant design issues arise at the mono‐ lithic base-to-wall connection due to the mechanical restraint offered by the base. To mitigate these issues, a secondary liquid containment barrier inside the insulation system across the entire bottom and part of the wall in the vicinity of the base-to wall joint is to be provided to protect and thermally isolate this area from the cold liquid and provide liquid-tightness. Other alternatives of the monolithic base-to-wall connection are described in ACI 376, Code Requirements for Design and Construc‐ tion of Concrete Structures for the Containment of Refrigerated Lique‐ �ed Gases . A.3.3.4.3.4 Single Containment Tank System. A single containment tank system incorporates a liquidtight container and a vapor-tight container. It can be a liquidtight and vapor‐ tight single-wall tank or a tank system comprising an inner container and an outer container, designed and constructed so that only the inner container is required to be liquidtight and
2016 Edition
--```,`,```,```,`,`,`,``,-`-`,`,`,`,`---
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
59A-60
PRODUCTION, STORAGE, AND HANDLING OF LIQUEFIED NATURAL GAS (LNG)
contain the liquid product. The outer container, if any, is primarily for the retention and protection of the insulation system from moisture and may hold the product vapor pres‐ sure, but it is not designed to contain the refrigerated liquid in the event of leakage from the inner container. The primary liquid container is constructed of low-temperature metal or prestressed concrete. The outer tank (if any) must be vapor‐ tight. It is normally made from carbon steel, and it is refer‐ enced in this standard in various contexts as the warm vapor container or the purge gas container. A single containment tank system is surrounded by a secondary containment (normally a dike wall) that is designed to retain liquid in the event of leakage. Refer to API 625 for further de�nition. A.3.3.8 Engineering Design. The engineering design conforms to regulatory requirements and includes all necessary speci�cations, drawings, and supporting documentation. The engineering design is developed from process, mechanical, civil, structural, �re protection, corrosion, control, and electri‐ cal requirements and other speci�cations. A.3.3.10 Fire Protection. Fire protection covers measures directed at avoiding the inception of �re or the escalation of an incident following the accidental or inadvertent release of LNG and other �ammables. A.3.3.16 LNG Facility. The following describes the distinc‐ tions in the terms component , LNG facility , and LNG plant :
Several components (piping, �anges, �ttings, valves including relief valves, gaskets, instrumentation, pumps, compressors, heat exchangers, motors, engines, turbines, electrical �eld wiring, etc.) installed and designed to function as one unit (storage, vaporization, liquefaction, transfer, etc.) are referred to as an LNG facility . A collection of LNG facilities (storage, vaporization, liquefac‐ tion, transfer, etc.) co-located on a site is referred to as an LNG plant . Components that function as a unit for purposes of serving an entire LNG plant (such as electrical systems, �re protection systems, security systems, etc.) can be referred to as LNG plant systems. A.3.3.27 Transfer Area. Transfer areas do not include product sampling devices or permanent plant piping. A.3.3.29 Vacuum-Jacketed. This is an insulating alternative for cryogenic piping and containers. If designed appropriately, this feature can satisfy the need for secondary containment for the inner piping. A.3.3.30 Vaporizer. A pressure-building coil that is integral to a container is not considered to be a vaporizer in the context of NFPA 59A. A.4.6 The provisions of 4.6 do not require inherently noncom‐ bustible materials to be tested in order to be classi�ed as noncombustible materials. [ 101, A.4.6.13] A.4.6(1) Examples of such materials include steel, concrete, masonry, and glass. [ 101, A.4.6.13.1(1)] A.5.2 The following factors should be considered in the selec‐ tion of plant site locations:
(1) Provision for minimum clearances as stated in this stand‐ ard between LNG containers, �ammable refrigerant stor‐ age tanks, �ammable liquid storage tanks, structures, and plant equipment, with respect to both plant property lines and each other (2) The degree that the LNG plant can, within limits of prac‐ ticality, be protected against forces of nature (3) Other factors applicable to the speci�c site that have a bearing on the safety of LNG plant personnel and the surrounding public The review of such factors should include an evaluation of potential incidents and safety measures incorporated in the design or operation of the LNG plant. A.5.2.4 New plant site locations should avoid �ood hazard areas. In the United States, maps that delineate special �ood hazard areas are maintained by local of�cials or can be ordered or viewed online at FEMA's Map Store at http://www.fema.gov. Accessibility to the plant can be limited during conditions of �ooding. Where encroachment into a �ood hazard area is unavoidable, measures to minimize �ood exposure and damage to the site and facilities should be investigated. Flood loads are outlined in ASCE 7, Minimum Design Loads for Build‐ ings and Other Structures . Structures, including tanks and containers, must be designed and constructed to prevent �ota‐ tion, collapse, permanent lateral movement, and loss of contents during conditions of �ooding. A.5.3.2.5 Paragraph 7.2.1.1 requires compliance with API 625, Tank Systems for Refrigerated Lique�ed Gas Storage . API 625, para‐ graph 5.6, requires the selection of storage concept to be based on a risk assessment. API 625, Annex C, discusses implications of a release of liquid from the primary liquid container and provides speci�c discussion related to each containment type. API 625, Annex D, provides guidance for selection of storage concepts as part of the risk assessment including external and internal events and hazards to be evaluated. Paragraph D.3.2.2 discusses the possibility of sudden failure of the inner tank and advises, “If extra protection from brittle fracture [or unabated ductile crack propagation] is desired, the general practice is to increase” the primary container toughness. Available materials meeting the required speci�cations of API 620, Design and Construction of Large, Welded, Low-Pressure Storage Tanks , Appen‐ dix Q, and of this standard for LNG service are considered to have crack-arrest properties at LNG service temperature and stress levels. Therefore, rapid failure of a steel primary container meeting this standard is not considered credible. In membrane containment tank systems, brittle fracture of membrane material is typically not a pertinent hazard for membrane tanks. However, other hazards based on a risk assessment should be considered. A.5.3.3.3 Methods that can be used to mitigate the effects of thermal radiation include the following:
(1) Affecting the burning rate of LNG (2) Reducing the size of the LNG �re (3) Reducing the radiant heat emission characteristics of the �re (4) Impeding the transmission of the radiant heat from the �re to the exposed objects (5) Other approved methods A.5.3.3.4 Several models are available to determine the ther‐ mal radiation distance required by 5.3.3.4. These include but are not limited to the following:
2016 Edition
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
` , , ` , ` , , ` , , ` ` , , ` ` , ` , , ` , ` , ` ` ` , , , ` ` ` , ` , , , , ` ` ` -
ANNEX A
(1) The Gas Research Institute's GRI Report 0176, LNGFIRE: A Thermal Radiation Model for LNG Fires , which is also avail‐ able as the “LNGFIRE III” computer model produced by GRI (2) The “Large Size LNG Pool Fire Model” described in the U.S. DOT report, Spectrum of Fires in an LNG Facility Assess‐ ments, Models and Consideration in Risk Evaluations , devel‐ oped under the U.S. DOT Contract DTRS56-04-T-005, December 2006, and the related computer code, Pool Fire Model Including Smoke Effects (PoFMISE) These references are for informational purposes only. The information concerning these software models has not been independently veri�ed, nor have the models been endorsed or certi�ed by NFPA or any of its Technical Committees. A.5.3.3.6 The 50 percent LFL level re�ects the uncertainty associated with current modeling programs. One model that has been used to calculate methane concentrations in air is described in GRI Report 0242, LNG Vapor Dispersion Prediction with the DEGADIS Dense Gas Dispersion Model . A.5.4.1(1) Examples of buildings and structures included in Classi�cation I are control rooms, tank system foundations, structures supported by the storage tank, structures supporting piping on the storage tank, and structures supporting piping up to the tank isolation valve. A.5.4.7 When considering spacing and construction methods related to occupied permanent and portable buildings at an LNG plant, each proposed building should be analyzed inde‐ pendently. API RP 752, Management of Hazards Associated with Location of Process Plant Permanent Buildings, and API RP 753, Management of Hazards Associated with Location of Process Plant Portable Buildings, should be referenced. A.5.5 The terms competence and competent in this standard should be determined based on one of the following criteria:
(1)
(2)
Documented training or certi�cation from institutions or groups that test for knowledge, skill, and ability that relate to the science, technology, or engineering disci‐ pline for the facility or component Evidence of successful design, construction, operation, or use of a similar facility or component
Evidence to be considered should include but not be limited to the following: (1) (2) (3) (4) (5) (6)
Work on similar facilities or components Date(s) that work was performed and completed Owner/operator contact information The amount of time the facility or component has been in operation Any substantive modi�cations to the original facility or component Satisfactory performance of the facility or component
The terms competence and competent in this standard should also be determined based on the evidence of knowledge, skill, and ability to do the following: (1) (2)
Recognize an abnormal or �awed condition Respond accordingly to prevent an unsafe or hazardous condition from occurring or to correct such a condition at any stage of the construction or operation of the facility or component
59A-61
A.5.6 Soil movement due to freezing of water is of two general types, as follows:
(1) The freezing of in situ water causes volumetric expansion of a moist soil. (2) Frost heave is caused by migration of water to a zone of freezing and a continual growth of ice lenses. A.5.8.5 Examples of nonstructural-slabs-on-grade (or slabs-onground) are slabs used for slope protection, impounding area paving, concrete aprons under piping and transfer areas, light truck and vehicle loading/unloading platforms, base slabs for outdoor mechanical or electrical equipment, base slabs for shop-built metal containers other than LNG containers, non– load transmitting ground �oor slabs for enclosed mechanical/ electrical rooms, non–load transmitting ground �oor slabs for control rooms and of�ce buildings, concrete-paved parking areas, garage �oors, ground �oor of storage buildings for light equipment and supplies, sidewalks, and pavements. A.6.3 API 617, Centrifugal Compressors for Petroleum, Chemical, and Gas Industry Services ; API 618, Reciprocating Compressors for Petroleum, Chemical, and Gas Industry Services ; and API 619 Rotary- Type Positive Displacement Compressors for Petroleum, Chemical, and Gas Industry Services provide guidance when selecting and speci‐ fying these types of compressors.
` , , ` , ` , , ` , , ` ` , , ` ` , ` , , ` , ` , ` ` ` , , , ` ` ` , ` , , , , ` ` ` -
A.6.5.6 For information on internal combustion engines or gas turbines exceeding 7500 horsepower per unit, see NFPA 850. A.7.3.1.3 Operating requirements for prevention of strati�ca‐ tion are located in Section 14.6. Additional details on rollover and rollover prevention can be found in the AGA publication Introduction to LNG for Personnel Safety . A.7.3.1.7 API 620 (Appendix Q), API 625, and ACI 376 contain design requirements to allow the tank systems to be purged into or out of service during tank commissioning or decommissioning. Continued outgasing should be considered in the decommissioning procedures. A.7.3.6.5.3 For double-wall, perlite-insulated tanks, the mini‐ mum pressure-relieving capacity can be the governing criterion for pressure relief valve sizing.
A.7.3.6.7.3 It is the responsibility of the user to determine whether the insulation will resist dislodgment by the available �re-�ghting equipment and to determine the rate of heat transfer through the insulation when exposed to �re. A.7.3.7.1 Foundation designs and container installations should account for applicable site-speci�c conditions, such as �ood loads, wind loads, and seismic loads. The Canadian Foun‐ dation Engineering Manual , published by the Canadian Geotech‐ nical Society, and Appendix C of API 620, can be used as guides for the subsurface investigation. A.7.3.7.5(3) It might not be practical to add a cathodic protec‐ tion system to an existing tank's outer tank bottom because of integral electrical conductivity of the bottom to the tank or LNG facility ground and lightning protection system. Ground‐ ing can make a cathodic protection system ineffective. A.7.3.7.6(D) Moisture accumulation in the conduit can lead to galvanic corrosion or other forms of deterioration within the conduit or heating element.
A.5.5.2 See API 620, Design and Construction of Large, Welded, Low-Pressure Storage Tanks , Appendix C, for further information. 2016 Edition
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
59A-62
PRODUCTION, STORAGE, AND HANDLING OF LIQUEFIED NATURAL GAS (LNG)
A.7.4.1.1 API 625, Figure 11.2 provides acceptable informa‐ tion and format for a certi�cation document. This form may be used to provide that compliance.
A.9.4.2 Table 5.3.3.7 provides the size of the design spill, which should be considered when specifying the closing time of a powered valve operator.
A.7.4.2.2 API 620 de�nes examination as either radiographic or ultrasonic examination.
A.9.4.2.6(1) Valves meeting this requirement would be designed to meet the testing requirements of API 607, or simi‐ lar test.
A.7.4.4.4 OBE ground motion need not exceed the motion represented by a 5 percent damped acceleration response spec‐ trum having a 10 percent probability of exceedance within a 50-year period. A.7.4.6.5 EN 14620, Part 5, Table 1, requires the outer concrete tank to be hydrostatically tested prior to installing insulation and the membrane. The membrane is leak tested after all welding is completed. A retest is required following repairs to close leaks. An insulation space monitoring system is required by EN 14620, Part 1, paragraph 7.2.1.8, which is inten‐ ded to identify any leaks of LNG gas or vapor into the space between the membrane and the wall. A.8.1 A pressure-building coil that is integral to an LNG container is not considered to be a vaporizer in the context of NFPA 59A. A.8.3.1 Because these vaporizers operate over a temperature range of −260°F to 212°F (−162°C to 100°C), the rules of the ASME Boiler and Pressure Vessel Code , Section I, Part PVG are not applicable. A.8.4.5.2 Valves meeting this requirement should meet the testing requirements of API 607, Fire Test for Quarter-turn Valves and Valves Equipped with Nonmetallic Seats; API 6FA, Fire Test for Valves; or a similar test. A.8.4.6 Valves meeting this requirement should meet the test‐ ing requirements of API 607, API 6FA, or a similar test. A.9.1 Refer to 7.3.1.2 and Section 13.14 for piping that is part of an LNG tank. A.9.2.1 Piping that is “part of or within the LNG container” is all piping within the storage tank system or container and includes piping attached to the tank or container out to the �rst �ange, piping out to the �rst connection if threaded, and piping out to the �rst circumferential weld where there is no �ange. Annulus piping is considered to be within the storage tank system. A.9.2.3 Particular consideration should be given where changes in size of wall thickness occur between pipes, �ttings, valves, and components.
A.9.4.2.9 If excessive stresses are indicated, an increase of the valve closure time or other methods can be used to reduce the stresses to a safe level. A.9.4.4 Under some conditions, marking materials that contain carbon or heavy metals can corrode aluminum. Mark‐ ing materials that contain chloride or sulfur compounds can corrode some stainless steels. A.9.6 For information on identi�cation of piping systems, see ASME A 13.1, Scheme for the Identi�cation of Piping Systems. A.9.7.3.4 All branch connections shall be attached to the run pipe by full penetration groove welds. See paragraph 328.5.4(d) in ASME B 31.3. A.9.10.1 49 CFR 193, “Lique�ed Natural Gas,” includes corro‐ sion protection requirements applicable to the LNG facility. A.9.11.8 Consideration should be given to the installation of “witness” pieces to monitor the installed condition of material associated with “buried” pipe. A.10.7.2 In the classi�cation of the extent of the hazardous area, consideration should be given to possible variations in t he spotting of tank cars and tank vehicles at the unloading points and to the effect those variations might have on the point of connection. A.10.8.1 For information on grounding and bonding, see NFPA 77, Section 5.4 and 6.1.3, and NFPA 70 . A.10.8.3 For information on stray currents, see API RP 2003, Protection Against Ignitions Arising Out of Static, Lightning, and Stray Currents. A.10.8.4 For information on lightning protection, see NFPA 780 and API RP 2003. A.11.5.3 The ESD required by 11.5.3 can be part of the facility ESD system, or it can be a separate ESD system speci�c to trans‐ fer operations. A.12.2 For information on �re protection systems, see the following:
A.9.3.1.4 Pipe insulation assemblies tested in an NFPA 274 pipe chase apparatus are considered acceptable if t he following are all met during the 10-minute test:
(1)
(1) Maximum peak heat release rate of 1.02 mm Btu/hr (300 kW). (2) Maximum total heat release of 78,700 Btu (83 MJ). (3) Maximum total smoke release of 5,380 ft 2 (500 m2). (4) Any �ames generated do not extend 1 ft (0.3 m) or more above the top of the vertical portion of the apparatus at any time. (5) Temperature of any of the three thermocouples speci�ed does not exceed 1000°F (538°C).
(3)
A.9.3.3.3 PFI ES-24, Pipe Bending Methods, Tolerances, Process and Material Requirements, can be used as a guide for all pipe bend‐ ing.
(2)
NFPA 25, Standard for the Inspection, Testing, and Mainte‐ nance of Water-Based Fire Protection Systems NFPA 68, Standard on Explosion Protection by De�agration Venting NFPA 69, Standard on Explosion Prevention Systems
A.12.2.1 The wide range in size, design, and location of LNG facilities covered by this standard precludes the inclusion of detailed �re protection provisions that apply to all facilities comprehensively. Information for the evaluation can be obtained from numerous sources, including NFPA codes, the U.S. Code of Federal Regulations, building codes applicable to the prospective area, and the equipment manufacturer's infor‐ mation. A.12.2.1.1 Where �re protection equipment design, engineer‐ ing, installation, or testing is not addressed by an NFPA code or
2016 Edition
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
` , , ` , ` , , ` , , ` ` , , ` ` , ` , , ` , ` , ` ` ` , , , ` ` ` , ` , , , , ` ` ` -
ANNEX A
standard, other publicly available standards should be consid‐ ered for use and authorized by the AHJ, if required. A.12.2.2 The evaluation should address all potential �re hazards, including at least the following:
(1) (2) (3) (4) (5) (6)
Storage tank relief valves Impounding areas LNG trenches and containment pits Cargo transfer areas Process, liquefaction, and vaporization areas Control rooms and control stations
59A-63
A.12.8.4 Natural gas, LNG, and hydrocarbon refrigerants within the process equipment are usually not odorized, and the sense of smell cannot be relied on to detect their presence. Two portable detectors should be available for monitoring when required, with a third detector for backup. This provides a spare detector in the event of failure of one of the primary detectors and also allows veri�cation if the two primary detec‐ tors provide different readings. A.12.9.1.1 The security assessment should include physical and cyber security threats and vulnerabilities.
A.12.2.2(5) Areas that may require a �xed pipe/nozzle dry chemical system for �re protection would be areas such as process areas, vaporization areas, transfer areas, and tank vent stacks. Potassium bicarbonate dry chemical agent is recommen‐ ded due to agent effectiveness on natural gas �res.
A.13.6.6 For information on corrosion protection, see NACE SP 0169, Control of External Corrosion on Underground or Submerged Metallic Piping Systems.
A.12.2.2(9) Plant �re brigades are not required by this stand‐ ard. Where the LNG plant elects to have a �re brigade, NFPA 600 is required for protective equipment and training.
A.13.14.2 LNG facilities within the United States should at a minimum adhere to Section 9.7 requirements for examination and testing of piping.
A.12.4.5 When installed as determined by the evaluation required in 12.2.1, the following detection system components should be designed, installed, documented, tested, and main‐ tained in accordance with NFPA 72 or as approved by the AHJ:
A.13.18.3.2 Extinguishment of gaseous �res can cause a buildup of �ammable vapors that can result in a re-ignition of the gases or an explosion, causing damage beyond that result‐ ing from the �re itself. Normally the best method for suppres‐ sion of a gaseous fuel �re is shutoff of the fuel supply, which results in extinguishment of the �re by fuel starvation. In cases where the control equipment is involved in the �re or where damage to equipment or structures will result in loss of control or loss of life, the �re may need to be extinguished. In those cases, vapor control must be implemented immediately to prevent an accumulation of vapors that could result in a reignition or an explosion.
(1) (2) (3) (4) (5) (6) (7) (8)
Initiating devices (detectors – smoke, �ame, heat, etc.) Fire system controllers and monitoring panels Noti�cation appliances (strobes, sirens, etc.) Fire system activation devices on installed extinguish‐ ment/suppression systems (water deluge, �xed dry chem‐ ical systems, etc.) Field wiring between initiating, noti�cation components activation/suppression system, controllers, and monitor‐ ing panels Power supply and backup power equipment for �re alarm system Any additional devices covered by NFPA 72 that are deter‐ mined necessary in the evaluation required by 12.2.1 Where �re protection systems are installed in accordance with NFPA 72 and are planned to be integrated with other systems, the integrated systems should be tested in accordance with NFPA 3.
A.12.6.1 Extinguishers of the dry chemical type usually are preferred. If dry chemical type is utilized, then a potassium bicarbonate dry chemical agent is recommended due to agent effectiveness on natural gas �res. Fixed �re-extinguishing and other �re control systems can be appropriate for the protection of speci�c hazards as determined in accordance with 12.2.1. A.12.8.1 Protective clothing for normal liquid transfer opera‐ tions should include cryogenic gloves, safety glasses, face shields, and coveralls or long-sleeve shirts. A.12.8.2 The incipient stage is the early stage of a �re, in which the progression has not developed beyond that which can be extinguished using either portable �re extinguishers or handlines �owing up to 473 L/min (125 gpm). A.12.8.3 Information concerning con�ned entry practices and procedures can be found in 29 CFR 1910.146, “Labor”; Cana‐ dian Federal Employment and Labor Statutes, Part II; and any local, state, or provincial requirements and standards that apply.
A.13.7.2 Valves meeting this requirement are designed to meet the testing requirements of API 607 or similar test.
A.14.1 Because of many variables, it is not possible to describe in a national standard a set of operating and maintenance procedures that will be adequate from the standpoint of safety in all cases without being burdensome or, in some cases, impractical. A.14.2.2(7) De�nitions of safety-related malfunctions are given in 49 CFR 191, “Transportation,” for LNG plants under the jurisdiction of the U.S. Department of Transportation under 49 CFR 193, “Lique�ed Natural Gas Facilities: Federal Safety Standards.” A.14.5.1 If an LNG facility is designed to operate unattended, it is recommended that alarm circuits that can transmit an alarm to the nearest attended company facility be provided to indicate abnormal pressure, temperature, or other symptoms of trouble. A.14.5.5.3 The AGA publication Purging Principles and Practice can be used as a guide. NFPA 56, while not mandatory for LNG facilities, contains additional guidance for purging activities. A.14.5.5.4 Several methods can be used for purging large containers into and out of service.
Several references cover the purging of large containers. Refer to the AGA publication Purging Principles and Practice . Many insulating materials that have had A.14.5.5.4.5 prolonged exposure to natural gas or methane retain apprecia‐ ble quantities of the gas within their pores or interstitial spaces and can require prolonged purging time or utilization of
--```,`,```,```,`,`,`,``,-`-`,`,`,`,`---
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
2016 Edition
59A-64
PRODUCTION, STORAGE, AND HANDLING OF LIQUEFIED NATURAL GAS (LNG)
diffusion-type purging activities. Refer to the AGA publication Purging Principles and Practice .
results, and calculations of event probabilities. The procedure should be fully documented.
A.14.6.7.4 For information on operation of piers, docks, and wharves, see NFPA 30.
A.15.6.1 Additional references for failure rate data of equip‐ ment items are listed below:
A.14.6.7.4.3 The ship's existing lifesaving appliances (i.e., life‐ boats) can ful�ll the requirement for emergency egress.
(1) CCPS Process Equipment Reliability Database. The data‐ base is open only to CCPS members, but some data are available in the book, Guidelines for Process Equipment Relia‐ bility Data, CCPS, 1989. (2) Failure Mode / Mechanism Distribution, 1997, Reliability Analysis Center, Rome, NY (3) Johnson, E. M. and J. R. Welker, “Development of an Improved LNG Plant Failure Rate Data Base,” GRI-80/0093, Gas Research Institute, Chicago, IL, 1980. (4) Nonelectronic Parts Reliability Data , 1995, Reliability Analysis Center, Rome, NY. (5) OREDA, Offshore Reliability Data Handbook , 4th Edition, SINTEF, 2002. Contains data for use in reliability, availa‐ bility, and maintainability studies; failure rates; failure mode distribution; and repair times for equipment. (6) Reliability Data for Control and Safety Systems, 1998, SINTEF Industrial Management, Trondheim, Norway.
A.14.7.1 NFPA 70B provides recommended maintenance to electrical systems that are not already addressed by this stand‐ ard. A.14.8.1 The AGA publication Purging Principles and Practice can be used as a guide. NFPA 56, while not mandatory for LNG facilities, contains additional guidance for purging activities. A.14.8.10.4(3) Normally, dry chemical–type �re extinguishers are recommended for gas �res. A.14.8.10.9 The operation of stop valves beneath pressure relief valves should be managed to minimize the risk of a stop valve not returning to the appropriate position after valves are cycled for relief valve maintenance or any other purposes. See ASME Boiler Pressure Vessel Code , Section VIII, Division I, UG-135, and the nonmandatory Appendix M-5. A.14.8.13.4 API RP 651, Cathode Protection of Aboveground Petro‐ leum Storage Tanks , provides guidance in the use of cathodic protection. A.14.8.13.9 NACE SP-0198, Control of Corrosion Under Thermal Insulation and Fireproo�ng Materials – A Systems Approach , provides guidance for establishing a corrosion control monitor‐ ing program. A.15.2.2 In this chapter, we use the concept of “risk tolerance” rather than “risk acceptance,” adopting the philosophy of the UK Health and Safety Executive (HSE). In discussing the toler‐ ability of risk, the UK HSE has written: “tolerable” does not mean “acceptable.” It refers instead to a willingness by society as a whole to live with a risk so as to secure certain bene�ts in the con�dence that the risk is one that is worth taking and that it is being properly controlled. However, it does not imply that everyone would agree reservation to take this risk or have it imposed on them (HSE 2001). Thus, there are various risk tolerance criteria around the world, as shown in Figure 15.10.2. Tolerable individual and societal risk criteria are then subject to the approval of the AHJ. A.15.3.1 Refer to United Kingdom Health and Safety Execu‐ tive publication 'Reducing Risks, Protecting People' available for free download from www.hse.gov.uk/risk/theory/r2p2.pdf. A.15.3.3 A serious injury is any detrimental outcome of an event to a person exposed to or affected by the LNG or other in-plant hazardous material release, which results in the person requiring �rst-aid (to preserve life) or being treated and kept in a medical facility for at least 24 hours. A.15.4.1 The list of methodologies here is not intended to override the Equivalency clause of 1.3. Users, with suf�cient documentation and approval of the authority having jurisdic‐ tion, should be permitted to use alternate met hodologies. A.15.4.2 The QRA procedure should include but is not limi‐ ted to the methodologies, release scenario selections, assump‐ tions, consequence models and associated validation, hazard levels (endpoints) for public impact, consequence modeling
One reference for leak frequency data is the Hydrocarbon Releases (HCR) System database from the United Kingdom Health and Safety Executive (HSE) (https://www.hse.gov.uk/ hcr3), as well as the following associated documents: (1) (2) (3) (4) (5) (6) (7)
Guidelines for Quantitative Risk Assessment – Purple Book , CPR 18E, National Institute of Public Health and the Environment, 1999. Lees, F. P., Loss Prevention in the Process Industry , 2nd edition, 1996, BBS Publishing. MHIDAS (Major Hazard Incident Data Service): database maintained by AEA Technology, Warrington. Offshore Hydrocarbon Releases Statistics and Analysis, 2002,” Hazardous Installations Directorate (HID) statis‐ tics report, HSR 2002 002, February 2003, HSE. Quantitative Risk Assessment Data Directory, E&P Forum Report No. 11.8/250, October 1996 “Revised Guidance on Reporting of Offshore Hydrocar‐ bon Releases,” OTO 96 956, November 1996, HSE. “Supplementary Guidance for Reporting Hydrocarbon Releases,” September 2002, UKOOA
A.15.8.4.2 Distance to the LFL should take into consideration the validation results in the model evaluation protocol (MEP), but distances to the LFL should not be adjusted to less than the predicted distance to the LFL of the mo del. A.15.9.2.2 The fatalities alluded to in this section are only those caused as a direct consequence of, and occurring within a short period of time after exposure to hazards associated with LNG or other hazardous materials released from a LNG plant. A.15.10.2 The Societal Risk Acceptability Criteria used by vari‐ ous jurisdictions in different parts of the world are indicated in the form of a F vs N diagram in Figure A.15.10.2. A.15.11.1 When mitigation measures are being chosen, the application of the principles of inherent safety have been proved to be the most effective means of reducing risk to persons outside the boundary of the LNG plant. Inherent safety is the use of mitigations that avoid the hazard rather than attempt to control the hazardous event or process. The follow‐ ing basic principles of inherent safety (Kletz, 1991) are based
2016 Edition
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
` , , ` , ` , , ` , , ` ` , , ` ` , ` , , ` , ` , ` ` ` , , , ` ` ` , ` , , , , ` ` ` -
ANNEX A
59A-65
1.E+00 1.E–01
NFPA 59A [1] UK [2, 4, 6] UK old [4]
1.E–02 1.E–03 1.E–04
UK COMAH [4] UK ACMH [4] EC [2, 3] France [4] Hong Kong [2, 5, 6]
1.E–05 1.E–06
Netherlands [2, 3 4, 5] Denmark [2, 3] Belgium [2]
1.E–07 1.E–08
Belgium [3] Czech [3] CZNew [4]
1.E–09 1.E–10 1.E–11
1
10
100
1000
1.E–12
10000
Australia (Victoria) [3] Australia (ANCOLD/A) [2] Australia (New South Wales) [2, 6] Australia (Western ne) [6] Australia (Western existing) [6] Rio de Janeior and Rio Sul [6] Sanata Barbara CA
FIGURE A.15.10.2
Societal Risk Tolerance Criteria Used by Different Jurisdictions.
on a hierarchy starting with intensi�cation and ending with administrative controls and procedures: (1) Intensi�cation. Small inventories of hazardous substances reduces the consequences of hazardous events associ‐ ated with those substances. (2) Substitution. Using safer material in place of a hazardous one will decrease the need for added protective equip‐ ment. (3) Attenuation. Carry out hazardous reactions or processes in less hazardous conditions. (4) Limitation of effects. The effects of failures should be reduced through the reduction of inventory sizes and process conditions. This should be accomplished through equipment design rather than by adding protective equipment (5) Simpli�cation. Complexities provide the potential for error; simpli�cation of LNG facility design reduces the potential for failure. (6) Change early. Identi�cation of hazards and hazardous scenarios early in the design process minimizes the need for changes after the design is complete and minimizes the potential for sometimes complicated integration of changes late in the design cycle. (7) Avoid knock-on effects. Care should be taken to ensure that, as far as reasonably practical, failure should not initiate additional hazardous scenarios and subsequent escalation of effects. (8) Making status clear. Equipment in the facility should be located so that observation of the equipment is easy and convenient; additionally the design of equipment should allow for the status of the equipment to be easily observed (e.g., valves open or closed, pump running or secured). (9) Making incorrect assembly impossible. As far as possible, components should be selected so that improper instal‐ lation or construction cannot occur. (10) Tolerance. The design of the process should be such that it will tolerate some amount of improper operation, installation, or process upset.
` , , ` , ` , , ` , , ` ` , , ` ` , ` , , ` , ` , ` ` ` , , , ` ` ` , ` , , , , ` ` ` -
(11) Ease of control. The use of added-on protective equipment to manage risks should be avoided. (12) Administrative controls/procedures. Human error is one the most common initiators of hazardous events; accord‐ ingly, the use of procedural controls to manage risk should be the last option and only when other options are not possible. A.15.11.2 With regard to the reduction of risk to persons outside the boundaries of the LNG plant, the basic principles listed in A.15.11.1 can be simpli�ed into the three-tier hierar‐ chy as follows.
(1)
Tier 1: Remove the hazard. This �rst tier of mitigation should focus on providing additional separation distance between the LNG- or gas-containing portions of the LNG facility. Revision of the LNG plant layout and orientation should be considered to increase the separation distance. When changes to the LNG plant layout are being consid‐ ered, the potential effect of prevailing winds and topogra‐ phy should be evaluated. Care should be given to avoiding the potential for dense clouds to form in valleys and troughs — such clouds will remain in place for longer periods of time, thereby increasing the risk of igni‐ tion. (2) Tier 2: Reduce the amount of hazardous substance/prevent the release. Consideration also should be given to reducing the amount of LNG or gas that can be released during an event. The effect of reducing inventory sizes is that the size of the liquid pool or the length and duration of the jet plume will be reduced and the effects of the ignited pool/ignited jet will be reduced. In this regard, the use of multiple process trains and smaller tanks is an effective way to reduce the impact on the general public from the LNG plant. (3) Tier 3: Additional procedures or controls to mitigate the risk. Where it is not possible to remove the hazard or to prevent or reduce the hazardous effects of a release, addi‐ tional procedures or controls can be used to mitigate the risk. Human error and failure of control devices are the initiators of the majority of hazardous scenarios; accord‐
2016 Edition
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
PRODUCTION, STORAGE, AND HANDLING OF LIQUEFIED NATURAL GAS (LNG)
59A-66
ingly, these elements should be the last choice when selecting mitigation measures to reduce risk. A.15.11.3 Following are some examples of mitigation meas‐ ures:
(1)
(2)
Tier 1: Remove the hazard.
(a) LNG facility spacing and layout (b) Spill containment Tier 2: Reduce the amount of hazardous substance/prevent the release. (a)
(3)
Design of equipment, including relief valve design, redundancy, and so forth (b) Valve arrangements (c) Safety instrumented systems, including changes to safety integrity levels, emergency shutdown (ESD) logic, alarm management, and so forth (d) Fire and gas (F&G) systems, including system relia‐ bility, F&G logic, response time, detector coverage, and alarm management (e) Fire protection equipment, including passive and active mitigation techniques Tier 3: Additional procedures or controls to mitigate the risk. (a) Maintenance and operating procedures (b) Security procedures and equipment (c) Emergency response actions Annex B Seismic Design of LNG Plants
This annex is not a part of the requirements of this NFPA document but is included for informational purposes only. B.1 Introduction. The purpose of Annex B is to provide infor‐ mation on the selection and use of operating basis earthquake (OBE), safe shutdown earthquake (SSE), and aftershock level earthquake (ALE) seismic levels. These three seismic levels form part of the requirements of this standard for the design of LNG containers, system components required to isolate the container and maintain it in a safe shutdown condition, and any structures or systems the failure of which could affect the integrity of the aforementioned. B.2 Operating Basis Earthquake (OBE). The OBE is a proba‐ ble earthquake to which a facility can be subjected during its design life. All elements of the facility de�ned in 7.4.4.6 are designed to withstand this event in accordance with conven‐ tional engineering procedures and criteria, and, therefore, the facility is expected to remain in operation.
The OBE is de�ned as ground motion having a 10 percent probability of exceedance within a 50-year period (mean return interval of 475 years). For design, this motion is typically repre‐ sented by design response spectra covering the appropriate ranges of natural period and damping ratio. The OBE design response spectrum is not adjusted by an importance factor. Following any event with a magnitude greater than OBE, the facility is expected to be evaluated for permanent damage and repaired as necessary. B.3 Safe Shutdown Earthquake (SSE). B.3.1 The SSE ground motion is the “risk-adjusted maximum considered earthquake (MCER ) ground motion,” per the de�‐ nition in ASCE 7, Minimum Design Loads for Buildings and Other Structures . For most locations, except possibly those near active faults, the MCER is determined by adjustment from ground
2016 Edition
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
motion that has a 2 percent probability of exceedance in a 50 year period to ground motion that achieves targeted risk requirements. The ASCE 7 adjustment establishes a uniform probability of failure criterion (1 percent chance of collapse in 50 years) for structures designed in accordance with the seis‐ mic provisions of ASCE 7. In NFPA 59A, the LNG plant is designed to contain the LNG and prevent catastrophic failure of critical facilities under an SSE event. This more onerous performance criterion is achieved through design require‐ ments of API 625, API 620 (Appendix L), and ACI 376, which contain established response reduction factors to prevent collapse at the design level ground motion. ASCE 7 requires the base design level earthquake to be twothirds of MCER . Setting the importance factor, I, equal to 1.5 (corresponding to structures containing extra hazardous mate‐ rials) results in a design level equal to MCE R . Thus, SSE = MCER , as required by this standard, is consistent with ASCE 7 provisions for the design level ground motion. Design of criti‐ cal facilities to this standard exceeds the design performance requirements of ASCE 7. The LNG facility is not required to remain operational following the SSE event. B.3.2 The objective of the selection and use of the SSE is to provide a minimum level of public safety in the event of a very low probability seismic event. It is recognized that the required probability level to achieve acceptable public safety varies from project to project, depending on such factors as location and population density. It is desirable to allow the owner �exibility in achieving the required level of public safety. B.3.3 The SSE level of seismic loading is to be used for a limit state check on the speci�ed components. The speci�ed SSE is the minimum level of ground motion that must be used for the analysis. The actual level must be speci�ed by the owner, and when used in conjunction with other considerations, such as location, siting, type of impounding system, hazard control, local climatic conditions, and physical features, it must be suf�‐ cient to ensure adequate public safety to the satisfaction of the regulatory authorities. A risk analysis study is recommended. At the SSE level of seismic loading, primary components of the LNG container are permitted to reach the stress limits speci�ed in API 620 and ACI 376. An LNG container subjected to this level of loading must be capable of continuing to contain a full volume of LNG. B.3.4 The impounding system must, as a minimum, be designed to withstand the SSE level of loading while empty (and while full if a membrane containment tank system) and the ALE level of loading while holding the volume, V , as speci‐ �ed in 7.4.4.7. The rationale is that should the LNG container fail following an SSE, the impounding system must remain intact and be able to contain the contents of the LNG container when subjected to an aftershock. B.3.5 Systems or components, the failure of which could affect the integrity of the LNG container, the impounding system, or the system components required to isolate the LNG container and maintain it in a safe shutdown condition, must be designed to withstand an SSE. B.3.6 The operator is required to install instrumentation capa‐ ble of measuring ground motion at the plant site. Following an earthquake that produces ground motion equal to or greater than the design OBE ground motion, it is advisable that the operator of the facility either take the LNG container out of service and have it inspected or prove that the LNG container
--```,`,```,```,`,`,`,``,-`-`,`,`,`,`---
Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
ANNEX C
components have not been subjected to loading in excess of the container's OBE stress level and design criteria. For instance, if the LNG container was partially full during the seis‐ mic event, calculations can prove that the container OBE stress levels were not exceeded. B.4 Aftershock Level Earthquake. The ALE ground motion is de�ned as 50 percent of the SSE ground motion. B.5 Design Response Spectra. Using the OBE and SSE ground motions as de�ned in Section B.2 and B.3.1, respec‐ tively, vertical and horizontal design response spectra must be constructed that cover the entire range of anticipated damping ratios and natural periods of vibration, including the funda‐ mental period and damping ratio for the sloshing (convective) mode of vibration of the contained LNG.
59A-67
(6)
Positive identi�cation of all persons entering the plant and on the plant, including methods at least as effective as picture badges; and (7) Liaison with local law enforcement of�cials to keep them informed about current security procedures under this section. Sec. 193.2905 Protective enclosures.
(1) The following facilities must be surrounded by a protec‐ tive enclosure:
B.6 Other Seismic Loads. B.6.1 Small LNG plants consisting of shop-built LNG contain‐ ers and limiting processing equipment should be designed for seismic loading using the ground motion speci�ed by ASCE 7. Either a structural response analysis should be performed or an ampli�cation factor of 0.60 should be applied to the maximum design spectral acceleration (S DS), as de�ned in 7.5.2.1, to determine the loads on the vessels or piping. B.6.2 All other structures, buildings, and process equipment must be designed for the seismic loading as determined by the classi�cation and occupancy category in accordance with 5.4.1 and 5.4.2 and ASCE 7.
(2) (3) (4)
Annex C Security This annex is not a part of the requirements of this NFPA document but is included for informational purposes only. C.1 General. This annex is reprinted from Title 49 of the Code of Federal Regulations, Part 193, Subpart J, Appendix J. The references herein are found in 49 CFR 193 “Transporta‐ tion.” These federal requirements are applicable to LNG plants in the United States under the jurisdiction of the Department of Transportation. Sec. 193.2901 Scope. This subpart prescribes requirements for security at LNG plants. However, the requirements do not apply to existing LNG plants that do not contain LNG. Sec. 193.2903 Security procedures. Each operator shall prepare and follow one or more manuals of written procedures to provide security for each LNG plant. The procedures must be available at the plant in accordance with Sec. 193.2017 and include at least:
(1) (2) (3) (4)
(5)
A description and schedule of security inspections and patrols performed in accordance with Sec. 193.2913; A list of security personnel positions or responsibilities utilized at the LNG plant; A brief description of the duties associated with each security personnel position or responsibility; Instructions for actions to be taken, including noti�cation of other appropriate plant personnel and law enforce‐ ment of�cials, when there is any indication of an actual or attempted breach of security; Methods for determining which persons are allowed access to the LNG plant;
(5)
(a) Storage tanks; (b) Impounding systems; (c) Vapor barriers; (d) Cargo transfer systems; (e) Process, liquefaction, and vaporization equipment; (f) Control rooms and stations; (g) Control systems; (h) Fire control equipment; (i) Security communications systems; and (j) Alternative power sources. The protective enclosure may be one or more separate enclosures surrounding a single facility or multiple facili‐ ties. Ground elevations outside a protective enclosure must be graded in a manner that does not impair the effectiveness of the enclosure. Protective enclosures may not be located near features outside of the facility, such as trees, poles, or buildings, which could be used to breach the security. At least two accesses must be provided in each protective enclosure and be located to minimize the escape distance in the event of emergency. Each access must be locked unless it is continuously guar‐ ded. During normal operations, an access may be unlocked only by persons designated in writing by the operator. During an emergency, a means must be readily available to all facility personnel within the protective enclosure to open each access.
Sec. 193.2907 Protective enclosure construction.
(1) Each protective enclosure must have suf�cient strength and con�guration to obstruct unauthorized access to the facilities enclosed. (2) Openings in or under protective enclosures must be secured by grates, doors or covers of construction and fastening of suf�cient strength such that the integrity of the protective enclosure is not reduced by any opening. Sec. 193.2909 Security communications. A means must be provided for:
(1) Prompt communications between personnel having supervisory security duties and law enforcement of�cials; and (2) Direct communications between all on-duty personnel having security duties and all control rooms and control stations. Sec. 193.2911 Security lighting. Where security warning systems are not provided for security monitoring under Sec. 193.2913, the area around the facilities listed under Sec. 193.2905(a) and each protective enclosure must be illuminated with a minimum in service lighting intensity of not less than 2.2 lux (0.2 ft candles) between sunset and sunrise.
2016 Edition
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
` , , ` , ` , , ` , , ` ` , , ` ` , ` , , ` , ` , ` ` ` , , , ` ` ` , ` , , , , ` ` ` -
59A-68
PRODUCTION, STORAGE, AND HANDLING OF LIQUEFIED NATURAL GAS (LNG)
Sec. 193.2913 Security monitoring. Each protective enclo‐ sure and the area around each facility listed in Sec. 193.2905(a) must be monitored for the presence of unauthorized persons. Monitoring must be by visual observation in accordance with the schedule in the security procedures under Sec. 193.2903(a) or by security warning systems that continuously transmit data to an attended location. At an LNG plant with less than 40,000 m3 (250,000 bbl) of storage capacity, only the protective enclosure must be monitored. Sec. 193.2915 Alternative power sources. An alternative source of power that meets the requirements of Sec. 193.2445 must be provided for security lighting and security monitoring and warning systems required under Secs. 193.2911 and 193.2913. Sec. 193.2917 Warning signs.
(1) Warning signs must be conspicuously placed along each protective enclosure at intervals so that at least one sign is recognizable at night from a distance of 30 m (100 ft) from any way that could reasonably be used to approach the enclosure. (2) Signs must be marked with at least the following on a background of sharply contrasting color: The words “NO TRESPASSING,” or words of comparable meaning. C.2 Additional Security Guidance In addition to Annex C security requirements from 49 CFR 193 and the security assess‐ ment requirements in 12.9.1 of this standard, the security of an LNG plant should consider physical and cyber security threats and vulnerabilities and ways to mitigate both. Guidance for both physical security and cyber security can be found in the U.S. Department of Homeland Security, Transportation Secur‐ ity Administration’s Pipeline Security Guidelines . Facilities inclu‐ ded in the U.S. Department of Homeland Security’s Chemical Facility Anti-Terrorism Standards are required to meet the intent of the Risk-Based Performance Standards Guidance . Annex D Training This annex is not a part of the requirements of this NFPA document but is included for informational purposes only. D.1 General. The text in this annex is reprinted from Title 49 of the Code of Federal Regulations, Part 193, Liqui�ed Natural Gas Facilities: Federal Safety Standards, Subpart H, Personnel Quali�cations and Training. 49 CFR 193 is applicable to LNG plants in the United States under the jurisdiction of the Pipe‐ line and Hazardous Materials Safety Administration, Depart‐ ment of Transportation. Sec. 193.2701 Scope. This subpart prescribes requirements for personnel quali�cations and training. Sec. 193.2703 Design and fabrication. For the design and fabrication of components, each operator shall use —
(1) With respect to design, persons who have demonstrated competence by training or experience in the design of comparable components. (2) With respect to fabrication, persons who have demonstra‐ ted competence by training or experience in the fabrica‐ tion of comparable components. Sec. 193.2705 Construction, installation, inspection, and test‐ ing.
(1) Supervisors and other personnel utilized for construc‐ tion, installation, inspection, or testing must have demon‐ strated their capability to perform satisfactorily the assigned function by appropriate training in the methods and equipment to be used or related experience and accomplishments. (2) Each operator must periodically determine whether inspectors performing duties under Sec. 193.2307 are satisfactorily performing their assigned function. Sec. 193.2707 Operations and maintenance.
(1) Each operator shall utilize for operation or maintenance of components only those personnel who have demon‐ strated their capability to perform their assigned func‐ tions by — (a)
Successful completion of the training required by Secs. 193.2713 and 193.2717; and (b) Experience related to the assigned operation or maintenance function; and (c) Acceptable performance on a pro�ciency test rele‐ vant to the assigned function. (2) A person who does not meet the requirements of para‐ graph (a) of this section may operate or maintain a component when accompanied and directed by an indi‐ vidual who meets the requirements. (3) Corrosion control procedures under Sec. 193.2605(b), including those for the design, installation, operation, and maintenance of cathodic protection systems, must be carried out by, or under the direction of, a person quali‐ �ed by experience and training in corrosion control tech‐ nology. Sec. 193.2709 Security. Personnel having security duties must be quali�ed to perform their assigned duties by successful completion of the training required under Sec. 193.2715. Sec. 193.2711 Personnel health. Each operator shall follow a written plan to verify that personnel assigned operating, main‐ tenance, security, or �re protection duties at the LNG plant do not have any physical condition that would impair perform‐ ance of their assigned duties. The plan must be designed to detect both readily observable disorders, such as physical handicaps or injury, and conditions requiring professional examination for discovery. Sec. 193.2713 Training: operations and maintenance.
(1) Each operator shall provide and implement a written plan of initial training to instruct — (a)
All permanent maintenance, operating, and super‐ visory personnel — 1.
About the characteristics and hazards of LNG and other �ammable �uids used or handled at the facility, including, with regard to LNG, low temperatures, �ammability of mixtures with air, odorless vapor, boiloff characteristics, and reaction to water and water spray; 2. About the potential hazards involved in oper‐ ating and maintenance activities; and 3. To carry out aspects of the operating and maintenance procedures under Secs. 193.2503 and 193.2605 that relate to their assigned functions; and (b) All personnel —
2016 Edition
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
` , , ` , ` , , ` , , ` ` , , ` ` , ` , , ` , ` , ` ` ` , , , ` ` ` , ` , , , , ` ` ` -
ANNEX E
1.
(c)
To carry out the emergency procedures under Sec. 193.2509 that relate to their assigned functions; and 2. To give �rst-aid; and All operating and appropriate supervisory person‐ nel — 1.
To understand detailed instructions on the facility operations, including controls, func‐ tions, and operating procedures; and 2. To understand the LNG transfer procedures provided under Sec. 193.2513. A written plan of continuing instruction must be conduc‐ ted at intervals of not more than two years to keep all personnel current on the knowledge and skills they gained in the program of initial instruction.
(2)
Sec. 193.2715 Training: security.
(1)
Personnel responsible for security at an LNG plant must be trained in accordance with a written plan of initial instruction to:
(2) ` ` ` , , , , ` , ` ` ` , , , ` ` ` , ` , ` , , ` , ` ` , , ` ` , , ` , , ` , ` , , ` -
(a) Recognize breaches of security; (b) Carry out the security procedures under Sec. 193.2903 that relate to their assigned duties; (c) Be familiar with basic plant operations and emer‐ gency procedures, as necessary to effectively perform their assigned duties; and (d) Recognize conditions where security assistance is needed. A written plan of continuing instruction must be conduc‐ ted at intervals of not more than two years to keep all personnel having security duties current on the knowl‐ edge and skills they gained in the program of initial instruction.
Sec. 193.2717 Training: �re protection.
(1)
(2)
(3)
All personnel involved in maintenance and operations of an LNG plant, including their immediate supervisors, must be trained in accordance with a written plan of initial instruction, including plant �re drills, to: (a) Know the potential causes and areas of �re; (b) Know the types, sizes, and predictable consequences of �re; and (c) Know and be able to perform their assigned �re control duties according to the procedures estab‐ lished under 193.2509 and by proper use of equip‐ ment provided under 193.2801. A written plan of continuing instruction, including plant �re drills, must be conducted at intervals of not more than two years to keep personnel current on the knowl‐ edge and skills they gained in the instruction under para‐ graph (a) of the section. Plant �re drills must provide personnel hands-on experi‐ ence in carrying out their duties under the �re emer‐ gency procedures required by 193.2509.
Sec. 193.2719 Training: records .
(1)
Each operator shall maintain a system of records which — (a)
Provide evidence that the training programs required by this subpart have been implemented; and (b) Provide evidence that personnel have undergone and satisfactorily completed the required training programs.
59A-69
(c)
Records must be maintained for one year after personnel are no longer assigned duties at the LNG plant. Annex E Informational References
E.1 Referenced Publications. The documents or portions thereof listed in this annex are referenced within the informa‐ tional sections of this standard and are not part of the require‐ ments of this document unless also listed in Chapter 2 for other reasons. E.1.1 NFPA Publications. National Fire Protection Associa‐ tion, 1 Batterymarch Park, Quincy, MA 02169-7471.
NFPA 3, Recommended Practice for Commissioning of Fire Protec‐ tion and Life Safety Systems , 2015 edition. NFPA 10, Standard for Portable Fire Extinguishers , 2013 edition. NFPA 11, Standard for Low-, Medium-, and High-Expansion Foam , 2016 edition. NFPA 12, Standard on Carbon Dioxide Extinguishing Systems , 2015 edition. NFPA 12A, Standard on Halon 1301 Fire Extinguishing Systems , 2015 edition. NFPA 13, Standard for the Installation of Sprinkler Systems , 2016 edition. NFPA 14, Standard for the Installation of Standpipe and Hose Systems , 2016 edition. NFPA 15, Standard for Water Spray Fixed Systems for Fire Protec‐ tion , 2016 edition. NFPA 16, Standard for the Installation of Foam-Water Sprinkler and Foam-Water Spray Systems , 2015 edition. NFPA 17, Standard for Dry Chemical Extinguishing Systems , 2013 edition. NFPA 20, Standard for the Installation of Stationary Pumps for Fire Protection , 2016 edition. NFPA 22, Standard for Water Tanks for Private Fire Protection , 2013 edition. NFPA 24, Standard for the Installation of Private Fire Service Mains and Their Appurtenances , 2016 edition. NFPA 25, Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems , 2014 edition. NFPA 30, Flammable and Combustible Liquids Code , 2015 edition. NFPA 52, Vehicular Gaseous Fuel Systems Code , 2013 edition. NFPA 56, Standard for Fire and Explosion Prevention During Cleaning and Purging of Flammable Gas Piping Systems , 2014 edition NFPA 68, Standard on Explosion Protection by De�agration Vent‐ ing , 2013 edition. NFPA 69, Standard on Explosion Prevention Systems , 2014 edition. NFPA 70 ®, National Electrical Code ®, 2014 edition.
2016 Edition
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
59A-70
PRODUCTION, STORAGE, AND HANDLING OF LIQUEFIED NATURAL GAS (LNG)
NFPA 70B, Recommended Practice for Electrical Equipment Main‐ tenance , 2013 edition.
API RP 651, Cathode Protection of Aboveground Petroleum Storage Tanks, 2007.
NFPA 72 ®, National Fire Alarm and Signaling Code , 2016 edition.
API 752, Management of Hazards Associated with Location of Process Plant Permanent Buildings, 2009.
NFPA 77, Recommended Practice on Static Electricity , 2014 edition.
API 753, Management of Hazards Associated with Location of Process Plant Portable Buildings, 2007.
NFPA 274, Standard Test Method to Evaluate Fire Performance Characteristics of Pipe Insulation , 2013 edition.
API RP 2003, Protection Against Ignitions Arising Out of Static, Lightning, and Stray Currents, 2008.
NFPA 600, Standard on Facility Fire Brigades , 2015 edition. NFPA 750, Standard on Water Mist Fire Protection Systems , 2015 edition. NFPA 780, Standard for the Installation of Lightning Protection Systems , 2014 edition. NFPA 850, Recommended Practice for Fire Protection for Electric Generating Plants and High Voltage Direct Current Converter Stations , 2015 edition. NFPA 1961, Standard on Fire Hose , 2013 edition. NFPA 1962, Standard for the Care, Use, Inspection, Service Test‐ ing, and Replacement of Fire Hose, Couplings, Nozzles, and Fire Hose Appliances , 2013 edition. NFPA 1963, Standard for Fire Hose Connections , 2014 edition. NFPA 2001, Standard on Clean Agent Fire Extinguishing Systems , 2015 edition. E.1.2 Other Publications. E.1.2.1 ACI Publications. American Concrete Institute, P.O. Box 9094, Farmington Hills, MI 48333.
E.1.2.4 ASCE Publications. American Society of Civil Engi‐ neers, 1801 Alexander Bell Drive, Reston, VA 20191-4400.
ASCE 7, Minimum Design Loads for Buildings and Other Struc‐ tures, 2010. E.1.2.5 ASME Publications. American Society of Mechanical Engineers, Three Park Avenue, New York, NY 10016-5990.
ASME Boiler and Pressure Vessel Code, 2007. ASME A 13.1, Scheme for the Identi�cation of Piping Systems, 2007. ASME B 31.3, Process Piping , 2008. E.1.2.6 Canadian Geotechnical Society Publication. Available from BiTech Pub. Ltd., Suite 103, 11951 Hammersmith Way, Richmond, BC V7A 5H9, Canada. Canadian Foundation Engineering Manual, 1993. E.1.2.7 GRI Publications. Gas Research Institute publications available from Gas Technology Institute (GTI), 1700 South Mount Prospect Road, Des Plaines, IL 60018-1804.
GRI Report 0176, LNGFIRE: A Thermal Radiation Model for LNG Fires, 1989.
ACI 376, Code Requirements for Design and Construction of Concrete Structures for the Containment of Refrigerated Lique�ed Gases, 2010.
GRI Report 0242, LNG Vapor Dispersion Prediction with the DEGADIS Dense Gas Dispersion Model, 1989.
American Gas Association, E.1.2.2 AGA Publications. 400 North Capitol Street, NW, Washington, DC 20001.
E.1.2.8 IEEC Publications. IEEE, 3 Park Ave., 17th Floor, New York, N.Y. 10016-5997.
` ` ` , , , , ` , ` ` ` , , , ` ` ` , ` , ` , , ` , ` ` , , ` ` , , ` , , ` , ` , , ` -
Introduction to LNG for Personnel Safety, 1986. Purging Principles and Practice, 1975. E.1.2.3 API Publications. American Petroleum Institute, 1220 L Street, NW, Washington, DC 20005-4070.
API 6FA, Fire Test for Valves, 2008. API 607, Fire Test for Quarter-turn Valves and Valves Equipped with Nonmetallic Seats, 2010. API 617, Centrifugal Compressors for Petroleum, Chemical, and Gas Industry Services, 2002 (reaf�rmed 2009). API 618, Reciprocating Compressors for Petroleum, Chemical, and Gas Industry Services, 2007. API 619, Rotary-Type Positive Displacement Compressors for Petro‐ leum, Chemical, and Gas Industry Services, 2010. API 620, Design and Construction of Large, Welded, Low-Pressure Storage Tanks, 2008 with 2009 addendum. API 625, Tank Systems for Refrigerated Lique�ed Gas Storage, 2010.
IEEE 500, Guide to the Collection and Presentation of Electrical, Electronic, Sensing Component, and Mechanical Equipment Reliability Data for Nuclear-Power Generating Stations, 1984. E.1.2.9 NACE Publications. NACE International, 1440 South Creek Drive, Houston, TX 77084-4906.
SP 0169, Control of External Corrosion on Underground or Submerged Metallic Piping Systems, 2007. SP-0198, Control of Corrosion Under Thermal Insulation and Fire‐ proo�ng Materials — A Systems Approach, 2010. Piping Fabrication E.1.2.10 PFI Publications. 511 Ave of Americas, #611, New York, NY 10011.
ES-24, Pipe Bending Methods, Tolerances, Process and Material Requirements , 2010. E.1.2.11 U.S. Government Publications. Publishing Of�ce, Washington, DC 20402.
U.S. Government
Chemical Facility Anti-Terrorism Standards Risk-Based Performance Standards Guidance , U.S. Department of Homeland Security, May 2009.
2016 Edition
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
Institute,
Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
ANNEX E
59A-71
Pipeline Security Guidelines , U.S. Department of Homeland Security, Transportation Security Administration, 2011.
Reliability Data for Control and Safety Systems , SINTEF Industrial Management, 1998.
Spectrum of Fires in an LNG Facility Assessments, Models and Consideration in Risk Evaluations, U.S. Department of Transpor‐ tation Report DTRS56-04-T-0005, December 2006.
“Revised Guidance on Reporting of Offshore Hydrocarbon Releases,” OTO 96 956, UK Health and Safety Executive, November 1996.
Title 29, Code of Federal Regulations, Part 1910.146, “Permit-Required Con�ned Spaces,” January 14, 1993, effective April 15, 1993.
“Risk Criteria for Land-Use Planning in the Vicinity of Major Industrial Hazards,” HMSO, UK Health and Safety Executive, 2001.
Title 29, Code of Federal Regulations, Part 1910.146, “Permit-Required Con�ned Spaces,” January 14, 1993, effective April 15, 1993.
“Supplementary Guidance for Reporting Hydrocarbon Releases,” UK Offshore Operators Association, September 2002.
Title 49, Code of Federal Regulations, Part 191, “Transporta‐ tion of Natural and Other Gas by Pipeline; Annual Reports, Incident Reports, and Safety-Related Condition Reports.”
TNO, “Guidelines for Quantitative Risk Assessment, RIVM, The Purple Book.”
Title 49, Code of Federal Regulations, Part 193, “Lique�ed Natural Gas Facilities: Federal Safety Standards.”
E.2 Informational References. The following documents or portions thereof are listed here as informational resources only. They are not a part of the requirements of t his document.
E.1.2.12 Other Publications. Failure Mode / Mechanism Distribu‐ tion , Reliability Analysis Center, Rome, NY, 1997.
“Five Steps to Risk Assessment,” INDC 163, rev. 1, UK Health and Safety Executive, 1998. Guidelines for Chemical Process Quantitative Risk Analysis , Ameri‐ can Institute of Chemical Engineers (AIChE) Center for Chem‐ ical Process Safety (CCPS), 2000. Guidelines for Process Equipment Reliability Data , Center for Chemical Process Safety, 1989 Guidelines for Quantitative Risk Assessment – Purple Book , CPR 18E, National Institute of Public Health and the Environment, 1999.
Hydrocarbon Releases (HCR) System database, UK Health and Safety Executive, 2002. Johnson, E. M. and J. R. Welker, “Development of an Improved LNG Plant Failure Rate Data Base,” GRI-80/0093, Gas Research Institute, Chicago, IL, 1980.
Failure Rate and Event Data (FRED) for use within Risk Assessment (Chapter 6K), Planning Case Assessment Guide, UK Health and Safety Executive, 2003. Guidelines for Chemical Process Quantitative Risk Analysis, AIChE/CCPS 2000. Guidelines for Developing Quantitative Safety Risk Criteria, AIChE/CCPS, 2010. Guidance on the Preparation of a Safety Report to meet the Requirements of Council Directive 96/82/EC (Seveso II), Joint Research Centre, European Commission, 1997 (EUR 17690 EN). Methods for Calculating the Physical Effects Caused by the Release of Hazardous Liquids and Gases (TNO Yellow Book). Methods for Calculating the Probability of Unintended Events (TNO Red Book).
Kletz, T. Plant Design for Safety: A User-Friendly Approach , 1991.
Methods for Determining the Potential Damage to Humans and the Surrounding Area Resulting from the Release of Hazardous Substances (TNO Green Book).
Lees, F. P., Loss Prevention in the Process Industry , 2nd edition, 1996.
Pelto, “Use of Risk-Analysis Methods in the LNG Industry,” Battelle Paci�c Northwest Labs, 1982.
MHIDAS (Major Hazard Incident Data Service), Ricardo AEA, UK.
“Reduction of LNG Operator Error and Equipment Failure Rates,” Gas Research Institute, Topical Report, GRI-90/0008, 1990.
Nonelectronic Parts Reliability Data , Reliability Analysis Center, 1995.
“Offshore Hydrocarbon Releases Statistics and Analysis, 2002,” Hazardous Installations Directorate statistics report, HSR 2002 002, UK Health and Safety Executive, February 2003. OREDA, Offshore Reliability Data Handbook , 4th Edition, SINTEF, 2002.
Quantitative Risk Assessment Data Directory, E&P Forum Report No. 11.8/250, October 1996. Reducing Risks, Protecting People - HSE’s Decision-Making Process , UK Health and Safety Executive, 2001.
Reference Manual Bevi Risk Assessment, Version 3.2, 2009, National Institute of Public Health and Environment (RIVM) Centre for External Safety, the Netherlands. Welker, J., “Development of an Improved LNG Plant Failure Rate Data Base,” Gas Research Institute, GRI-80/0093, 1981. Woodward, J. L. and Pitblado, R. M., “LNG Risk Based Safety - Modeling and Consequence Analysis,” Wiley-AICHE, 2010. E.3 References for Extracts in Informational Sections. NFPA 101 ®, Life Safety Code ®, 2015 edition.
2016 Edition --```,`,```,```,`,`,`,``,-`-`,`,`,`,`---
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
59A-72
PRODUCTION, STORAGE, AND HANDLING OF LIQUEFIED NATURAL GAS (LNG)
Index Copyright © 2015 National Fire Protection Association. All Rights Reserved. The copyright in this index is separate and distinct from the copyright in the document that it indexes. The licensing provi‐ sions set forth for the document are not applicable to this index. This index may not be reproduced in whole or in part by any means without the express written permission of NFPA. -A Administration, Chap. 1 Equivalency, 1.3, A.1.3 Pressure Measurement, 1.6 Purpose, 1.2 Referenced Standards, 1.7 Retroactivity, 1.4 Scope, 1.1, A.1.1 SI Units, 1.5, A.1.5 Approved De�nition, 3.2.1, A.3.2.1 Authority Having Jurisdiction (AHJ) De�nition, 3.2.2, A.3.2.2 -BBunkering De�nition, 3.3.1 -CCargo Tank Vehicle De�nition, 3.3.2 Component De�nition, 3.3.3 Container De�nition, 3.3.4 Frozen Ground Container De�nition, 3.3.4.1 Prestressed Concrete Container De�nition, 3.3.4.2 Tank System De�nition, 3.3.4.3 Controllable Emergency De�nition, 3.3.5 ` ` ` , , , , ` , ` ` ` , , , ` ` ` , ` , ` , , ` , ` ` , , ` ` , , ` , , ` , ` , , ` -
Fire Protection De�nition, 3.3.10, A.3.3.10 Fire Protection, Safety, and Security , Chap. 12 Emergency Shutdown (ESD) Systems, 12.3 Fire Extinguishing and Other Fire Control Equipment, 12.6 Fire Protection Water Systems, 12.5 Gas, Fire, and Leak Detection, 12.4 Fire Detectors, 12.4.3 Gas Detection, 12.4.2 Leak Detection, 12.4.4 General, 12.2, A.12.2 Maintenance of Fire Protection Equipment, 12.7 Personnel Safety, 12.8 Scope, 12.1 Security, 12.9 Security Assessment, 12.9.1 Fired Equipment De�nition, 3.3.11 Flame Spread Index De�nition, 3.3.12 -GGeneral Requirements , Chap. 4 Control Center, 4.3 Corrosion Control Overview, 4.2 Ignition Source Control, 4.7 Noncombustible Material, 4.6, A.4.6 Records, 4.5 Scope, 4.1 Sources of Power, 4.4 -HHazardous Fluid De�nition, 3.3.13
-D-I-
De�nitions, Chap. 3
Design Pressure De�nition, 3.3.6 Dike De�nition, 3.3.7 -EEngineering Design De�nition, 3.3.8, A.3.3.8 Explanatory Material, Annex A -FFail-safe De�nition, 3.3.9
Impounding Area De�nition, 3.3.14 Informational References , Annex E Instrumentation and Electrical Services , Chap. 10 Electrical Equipment, 10.7 Electrical Grounding and Bonding, 10.8 General, 10.8.1, A.10.8.1 Emergency Shutdown, 10.6 Liquid Level Gauging, 10.2 LNG Containers, 10.2.1 Tanks for Refrigerants or Flammable Process Fluids, 10.2.2 Pressure Gauging, 10.3 Scope, 10.1 Temperature Indicators, 10.5
2016 Edition
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
INDEX
Vacuum Gauging, 10.4 -LLique�ed Natural Gas (LNG) De�nition, 3.3.15
59A-73
Out-of-Service De�nition, 3.3.21 Over�lling De�nition, 3.3.22
-P-
LNG Facility De�nition, 3.3.16, A.3.3.16 LNG Plant De�nition, 3.3.17 -MMaximum Allowable Working Pressure (MAWP) De�nition, 3.3.18 Model De�nition, 3.3.19 -NNoncombustible Material De�nition, 3.3.20 -OOperating, Maintenance, and Personnel Training , Chap. 14 Emergency Procedures, 14.4 General Requirements, 14.2 Maintenance, 14.8 Control Systems, Inspection, and Testing, 14.8.10 Corrosion Control, 14.8.13 Emergency Power, 14.8.4 Foundation, 14.8.3 LNG Storage Tanks, 14.8.11 Meteorological and Geophysical Events, 14.8.12 Repairs, 14.8.8 Site Housekeeping, 14.8.9 Maintenance Manual, 14.7 Manual of Operating Procedures, 14.3 Monitoring Operations, 14.5 Control Center, 14.5.1, A.14.5.1 Cooldown, 14.5.3 Depressurizing, 14.5.4 LNG Tank Foundation, 14.5.2 Purging, 14.5.5 Container Purging, Drying, and Cooldown Procedures, 14.5.5.4, A.14.5.5.4 Personnel Training, 14.9 Marine Transfer Training, 14.9.5 Refresher Training, 14.9.6 Records, 14.10 Scope, 14.1, A.14.1 Transfer of LNG and Flammables, 14.6 Loading and Unloading Tank Vehicle and Tank Car, 14.6.6 Oxygen Content, 14.6.6.9 Marine Shipping and Receiving, 14.6.7 Bunkering Operations, 14.6.7.5 Marine Connections, 14.6.7.3 Prior to Transfer, 14.6.7.2 Transfer Operations in Progress, 14.6.7.4, A.14.6.7.4 Vessel Arrival, 14.6.7.1
Performance (Risk Assessment) Based LNG Plant Siting , Chap. 15 De�nitions, 15.3 Event, 15.3.2 Individual Risk, 15.3.3, A.15.3.3 Societal Risk, 15.3.4 Environmental Conditions and Occurrence Probabilities, 15.7 General Requirements, 15.2 Hazard and Consequence Assessment, 15.8 LNG and Other Hazardous Materials Release Scenarios, 15.5 Catalog of Scenarios of Release, 15.5.1 Release Speci�cations, 15.5.2 Release Probabilities and Conditional Probabilities, 15.6 Risk Calculations and Basis of Assessment, 15.4 Risk Mitigation Approaches, 15.11 Risk Result Presentation, 15.9 Risk Contours of Constant Individual Risks, 15.9.1 Societal Risks on F-N Diagrams, 15.9.2 Risk Tolerability Criteria, 15.10 Scope, 15.1 Pipe Insulation Assembly De�nition, 3.3.23 Piping Systems and Components, Chap. 9 Corrosion Control, 9.10 Cryogenic Pipe-in-Pipe Systems, 9.11 Annular Space, 9.11.5 Connections, 9.11.7 Corrosion Protection, 9.11.8, A.9.11.8 General, 9.11.1 Inner Pipe, 9.11.2 Installation, 9.11.9 Operational Requirements, 9.11.6 Outer Pipe, 9.11.3 Vacuum-Jacketed Function, 9.11.4 General, 9.2 Seismic Design Requirements, 9.2.2 Inspection, Examination, and Testing of Piping, 9.7 Examination Criteria, 9.7.4 Leak Testing, 9.7.1 Record Keeping, 9.7.2 Record Retention, 9.7.5 Welded Pipe Examinations, 9.7.3 Installation, 9.4 Pipe Marking, 9.4.4, A.9.4.4 Piping Joints, 9.4.1 Valves, 9.4.2, A.9.4.2 Welding and Brazing, 9.4.3 Materials of Construction, 9.3 Fittings, 9.3.3 Bends, 9.3.3.3, A.9.3.3.3 General, 9.3.1 Piping, 9.3.2
2016 Edition --```,`,```,```,`,`,`,``,-`-`,`,`,`,`---
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
PRODUCTION, STORAGE, AND HANDLING OF LIQUEFIED NATURAL GAS (LNG)
59A-74
Transition Joints, 9.3.2.6 Valves, 9.3.4 Pipe Supports, 9.5 Piping Identi�cation, 9.6, A.9.6 Purging of Piping Systems, 9.8 Safety and Relief Valves, 9.9 Scope, 9.1, A.9.1 Plant Siting and Layout , Chap. 5 Buildings and Structures, 5.4 Buildings and Structures Design, 5.4.2 Classi�cation A, 5.4.2.1 Classi�cation B, 5.4.2.2 Classi�cation C, 5.4.2.3 Buildings and Structures Design Classi�cation, 5.4.1 Concrete Design and Materials, 5.8 Minimum Reinforcement, 5.8.6 Other Concrete Structures, 5.8.4 Designer and Fabricator Competence, 5.5, A. 5.5 Falling Ice and Snow, 5.7 Plant Site Provisions, 5.2, A.5.2 Portable LNG Facility, 5.9 Scope, 5.1 Site Provisions for Spill and Leak Control, 5.3 Container Spacing, 5.3.4 General, 5.3.1 Impounding Area and Drainage System Design and Capacity, 5.3.2 Water Removal, 5.3.2.12 Impounding Area Siting, 5.3.3 Loading and Unloading Facility Spacing, 5.3.7 Process Equipment Spacing, 5.3.6 Vaporizer Spacing, 5.3.5 Soil Protection for Cryogenic Equipment, 5.6, A.5.6 Pressure Relief Device De�nition, 3.3.24 Process Equipment , Chap. 6 Flammable Refrigerant and Flammable Liquid Storage, 6.4 Installation of Process Equipment, 6.2 Process Equipment, 6.5 Pumps and Compressors, 6.3, A.6.3 Scope, 6.1 -RReferenced Publications , Chap. 2 Requirements for Stationary Applications Using ASME Containers, Chap. 13 Automatic Product Retention Valves, 13.7 Container Filling, 13.4 Container Foundations and Supports, 13.5 Container Installation, 13.6 Minimum Distance, 13.6.2 Container Instrumentation, 13.15 General, 13.15.1 Level Gauging, 13.15.2 Pressure Gauging and Control, 13.15.3 Containers, 13.3 Seismic Design, 13.3.14 ` ` ` , , , , ` , ` ` ` , , , ` ` ` , ` , ` , , ` , ` ` , , ` ` , , ` , , ` , ` , , ` -
Usage, 13.3.14.2 Field Testing of LNG Containers, 13.12 Fire Protection and Safety, 13.16 Gas Detection, 13.17 General Requirements, 13.2 Inspection, 13.9 LNG Spill Containment, 13.8 Operations and Maintenance, 13.18 Basic Operations Requirements, 13.18.1 Emergency Procedures, 13.18.3 Maintenance, 13.18.4 Facility Maintenance, 13.18.4.3 Maintenance Manual, 13.18.4.2 Maintenance Records, 13.18.4.6 Operating Procedures Manual, 13.18.2 Training, 13.18.5 Employee Records, 13.18.5.4 Piping, 13.14 Scope, 13.1 Shipment of LNG Containers, 13.11 Shop Testing of LNG Containers, 13.10 Welding on Containers, 13.13 -SSecurity , Annex C Additional Security Guidance, C.2 General, C.1 Seismic Design of LNG Plants , Annex B Aftershock Level Earthquake, B.4 Design Response Spectra, B.5 Introduction, B.1 Operating Basis Earthquake (OBE), B.2 Other Seismic Loads, B.6 Safe Shutdown Earthquake (SSE), B.3 Shall De�nition, 3.2.3 Should De�nition, 3.2.4 Sources of Ignition De�nition, 3.3.25 Standard De�nition, 3.2.5 Stationary LNG Storage, Chap. 7 ASME Containers Designed for Operation at More Than 15 psi (103 kPa), 7.5 Filling Volume, 7.5.3 General, 7.5.1 Seismic Design of Land-Based Shop-Built Containers, 7.5.2 Testing of ASME LNG Containers, 7.5.4 Design Considerations, 7.3 Container Drying, Purging, and Cooldown, 7.3.5 Container Insulation, 7.3.3 Foundations, 7.3.7 General, 7.3.1 Marking of LNG Storage Tank Systems and ASME Containers, 7.3.4 Relief Devices, 7.3.6
2016 Edition
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
INDEX
Fire Exposure, 7.3.6.7 Pressure Relief Valve Capacity, 7.3.6.7.4 Pressure Relief Device Sizing, 7.3.6.5 Vacuum Relief Sizing, 7.3.6.6 Wind, Flood, and Snow Loads, 7.3.2 General, 7.2 ASME Containers, 7.2.2 Storage Tank Systems, 7.2.1 Scope, 7.1 Tank Systems, 7.4 Concrete Containers, 7.4.3 General, 7.4.1 Certi�cation, 7.4.1.1, A.7.4.1.1 Inspection, 7.4.5 Metal Containers, 7.4.2 Seismic Design of Land-Based Field-Fabricated Tank Systems, 7.4.4 Testing of LNG Containers, 7.4.6 -TTank Vehicle De�nition, 3.3.26 Training , Annex D General, D.1 Transfer Area De�nition, 3.3.27, A.3.3.27 Transfer Systems for LNG, Refrigerants, and Other Flammable Fluids, Chap. 11 Communications and Lighting, 11.9 General Requirements, 11.2 Hoses and Arms, 11.8 Marine Shipping and Receiving, 11.5 Berth Design Requirements, 11.5.1 Emergency Shutdown System, 11.5.3, A.11.5.3
59A-75
Piping (or Pipelines), 11.5.2 Pipeline Shipping and Receiving, 11.7 Piping System, 11.3 Pump and Compressor Control, 11.4 Scope, 11.1 Tank Vehicle and Tank Car Loading and Unloading Facilities, 11.6 Transition Joint De�nition, 3.3.28 -V Vacuum-Jacketed De�nition, 3.3.29, A.3.3.29 Vaporization Facilities, Chap. 8 Classi�cation of Vaporizers, 8.2 Combustion Air Supply, 8.6 Design and Materials of Construction, 8.3 Products of Combustion, 8.7 Relief Devices on Vaporizers, 8.5 Scope, 8.1, A.8.1 Vaporizer Piping, Intermediate Fluid Piping, and Storage Valves, 8.4 Vaporizer Ambient Vaporizer De�nition, 3.3.30.1 De�nition, 3.3.30, A.3.3.30 Heated Vaporizer De�nition, 3.3.30.2 Process Vaporizer De�nition, 3.3.30.3 -W Water Capacity De�nition, 3.3.31
2016 Edition --```,`,```,```,`,`,`,``,-`-`,`,`,`,`---
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
Sequence of Events for the Standards Development Process
Committee Membership Classifications 1,2,3,4
Once the current edition is published, a Standard is opened for Public Input.
Step 1 – Input Stage • Input accepted from the public or other committees for consideration to develop the First Draft • Technical Committee holds First Draft Meeting to revise Standard (23 weeks); Technical Committee(s) with Correlating Committee (10 weeks) • Technical Committee ballots on First Draft (12 weeks); Technical Committee(s) with Correlating Committee (11 weeks) • Correlating Committee First Draft Meeting (9 weeks) • Correlating Committee ballots on First Draft (5 weeks) • First Draft Report posted on the document information page Step 2 – Comment Stage • Public Comments accepted on First Draft (10 weeks) following posting of First Draft Report • If Standard does not receive Public Comments and the Technical Committee chooses not to hold a Second Draft meeting, the Standard becomes a Consent Standard and is sent directly to the Standards Council for issuance (see Step 4) or • Technical Committee holds Second Draft Meeting (21 weeks); Technical Committee(s) with Correlating Committee (7 weeks) • Technical Committee ballots on Second Draft (11 weeks); Technical Committee(s) with Correlating Committee (10 weeks) • Correlating Committee Second Draft Meeting (9 weeks) • Correlating Committee ballots on Second Draft (8 weeks) • Second Draft Report posted on the document information page Step 3 – NFPA Technical Meeting • Notice of Intent to Make a Motion (NITMAM) accepted (5 weeks) following the posting of Second Draft Report • NITMAMs are reviewed and valid motions are certified by the Motions Committee for presentation at the NFPA Technical Meeting • NFPA membership meets each June at the NFPA Technical Meeting to act on Standards with “Certified Amending Motions” (certified NITMAMs) • Committee(s) vote on any successful amendments to the Technical Committee Reports made by the NFPA membership at the NFPA Technical Meeting
The following classifications apply to Committee members and represent their principal interest in the activity of the Committee. 1. M Manufacturer: A representative of a maker or marketer of a product, assembly, or system, or portion thereof, that is affected by the standard. 2. U User: A representative of an entity that is subject to the provisions of the standard or that voluntarily uses the standard. 3. IM Installer/Maintainer: A representative of an entity that is in the business of installing or maintaining a product, assembly, or system affected by the standard. 4. L Labor: A labor representative or employee concerned with safety in the workplace. 5. RT Applied Research/Testing Laborator y: A representative of an independent testing laboratory or independent applied research organization that promulgates and/or enforces standards. 6. E Enforcing Authority: A representative of an agency or an organization that promulgates and/or enforces standards. 7. I Insurance: A representative of an insurance company, broker, agent, bureau, or inspection agency. 8. C Consumer: A person who is or represents the ultimate purchaser of a product, system, or service affected by the standard, but who is not included in (2). 9. SE Special Expert: A person not representing (1) through (8) and who has special expertise in the scope of the standard or portion thereof. NOTE 1: “Standard” connotes code, standard, recommended practice, or guide. NOTE 2: A representative includes an employee. NOTE 3: While these classifications will be used by the Standards Council to achieve a balance for Technical Committees, the Standards Council may determine that new classifications of member or unique interests need representation in order to foster the best possible Committee deliberations on any project. In this c onnection, the Standards Council may make such appointments as it deems appropriate in the public interest, such as the classification of “Utilities” in the National Electrical Code Committee. NOTE 4: Representatives of subsidiaries of any group are generally considered to have the same classification as the parent organization.
Step 4 – Council Appeals and Issuance o f Standard • Notification of intent to file an appeal to the Standards Council on Technical Meeting action must be filed within 20 days of the NFPA Technical Meeting • Standards Council decides, based on all evidence, whether to issue the standard or to take other action Notes: 1. Time periods are approximate; refer to published schedules for actual dates. 2. Annual revision cycle documents with certified amending motions take approximately 101 weeks to complete. 3. Fall revision cycle documents receiving certified amending motions take approximately 141 weeks to complete. --```,`,```,```,`,`,`,``,-`-`,`,`,`,`---
Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
6/16-A Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
Submitting Public Input / Public Comment Through the Online Submission System Soon after the current edition is published, a Standard is open for Public Input. Before accessing the Online Submission System, you must first sign in at www.nfpa.org. Note: You will be asked to sign-in or create a free online account with NFPA before using this system: a. Click on Sign In at the upper right side of the page. b. Under the Codes and Standards heading, click on the “List of NFPA Codes & Standards,” and then select your document from the list or use one of the search features. OR
a. Go directly to your specific document information page by typing the convenient shortcut link of www.nfpa.org/document# (Example: NFPA 921 would be www.nfpa.org/921). Sign in at the upper right side of the page. To begin your Public Input, select the link “The next edition of this standard is now open for Public Input” located on the About tab, Current & Prior Editions tab, and the Next Edition tab. Alternatively, the Next Edition tab includes a link to Submit Public Input online. At this point, the NFPA Standards Development Site will open showing details for the document you have selected. This “Document Home” page site includes an explanatory introduction, information on the current document phase and closing date, a left-hand navigation panel that includes useful links, a document Table of Contents, and icons at the top you can click for Help when using the site. The Help icons and navigation panel will be visible except when you are actually in the process of creating a Public Input. Once the First Draft Report becomes available there is a Public Comment period during which anyone may submit a Public Comment on the First Draft. Any objections or further related changes to the content of the First Draft must be submitted at the Comment stage. To submit a Public Comment you may access the online submission system utilizing the same steps as previously explained for the submission of Public Input. For further information on submitting public input and public comments, go to: http://www.nfpa.org/ publicinput.
Other Resources Available on the Document Information Pages About tab: View general document and subject-related information. Current & Prior Editions tab: Research current and previous edition information on a Standard. Next Edition tab: Follow the committee’s progress in the processing of a Standard in its next revision cycle. Technical Committee tab: View current committee member rosters or apply to a committee. Technical Questions ta b: For members and Public Sector Officials/AHJs to submit questions about codes and standards to NFPA staff. Our Technical Questions Service provides a convenient way to receive timely and consistent technical assistance when y ou need to know more about NFPA codes and standards relevant to your work. Responses are provided by NFPA staff on an informal basis. Products & Training tab: List of NFPA’s publications and training available for purchase.
6/16-B Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
` , , ` , ` , , ` , , ` ` , , ` ` , ` , , ` , ` , ` ` ` , , , ` ` ` , ` , , , , ` ` ` -
Information on the NFPA Standards Development Process I. Applicable Regulations. The primary rules governing the processing of NFPA standards (codes, standards, recommended practices, and guides) are the NFPA Regulations Governing the Development of NFPA Standards (Regs) . Other applicable rules include NFPA Bylaws , NFPA Technical Meeting Convention Rules , NFPA Guide for the Conduct of Participants in the NFPA Standards Development Process , and the NFPA Regulations Governing Petitions to the Board of Directors from Decisions of the Standards Council . Most of these rules and regulations are contained in t he NFPA Standards Directory . For copies of the Directory , contact Codes and Standards Administration at NFPA Headquarters; all these documents are also available on
the NFPA website at “www.nfpa.org.” The following is general information on the NFPA process. All participants, however, should refer to the actual rules and regulations for a full understanding of this process and for the criteria that govern participation. II. Technical Committee Report. The Technical Committee Report is defined as “the Report of the responsible
Committee(s), in accordance with the Regulations, in preparation of a new or revised NFPA Standard.” The Technical Committee Report is in two parts and consists of the First Draft Report and the Second Draft Report. (See Regs at Section 1.4.) III. Step 1: First Draft Report. The First Draft Report is defined as “Part one of the Technical Committee Report, which
documents the Input Stage.” The First Draft Report consists of the First Draft, Public Input, Committee Input, Committee and Correlating Committee Statements, Correlating Notes, and Ballot Statements. (See Regs at 4.2.5.2 and Section 4.3.) Any objection to an action in the First Draft Report must be raised through the filing of an appropriate Comment for consideration in the Second Draft Report or the objection will be considered resolved. [See Regs at 4.3.1(b).] IV. Step 2: Second Draft Report. The Second Draft Report is defined as “Part two of the Technical Committee Report, which documents the Comment Stage.” The Second Draft Report consists of the Second Draft, Public Comments with corresponding Committee Actions and Committee Statements, Correlating Notes and their respective Committee Statements, Committee Comments, Correlating Revisions, and Ballot Statements. (See Regs at 4.2.5.2 and Section 4.4.) The First Draft Report and the Second Draft Report together constitute the Technical Committee Report. Any outstanding objection following the Second Draft Report must be raised through an appropriate Amending Motion at the NFPA Technical Meeting or the objection will be considered resolved. [See Regs at 4.4.1(b).] V. Step 3a: Action at NFPA Technical Meeting. Following the publication of the Second Draft Report, there is a period
during which those wishing to make proper Amending Motions on the Technical Committee Reports must signal their intention by submitting a Notice of Intent to Make a Motion (NITMAM). (See Regs at 4.5.2.) Standards that receive notice of proper Amending Motions (Certified Amending Motions) will be presented for action at t he annual June NFPA Technical Meeting. At the meeting, the NFPA membership can consider and act on these Certified Amending Motions as well as Follow-up Amending Motions, that is, motions that become necessary as a result of a previous successful Amending Motion. (See 4.5.3.2 through 4.5.3.6 and Table 1, Columns 1-3 of Regs for a summary of the available Amending Motions and who may make them.) Any outstanding objection following action at an NFPA Technical Meeting (and any further Technical Committee consideration following successful Amending Motions, see Regs at 4.5.3.7 through 4.6.5.3) must be raised through an appeal to the Standards Council or it will be considered to be resolved. VI. Step 3b: Documents Forwarded Directly to the Council. Where no NITMAM is received and certified in accordance
with the Technical Meeting Convention Rules, the standard is forwarded directly to the Standards Council for action on issuance. Objections are deemed to be resolved for these documents. (See Regs at 4.5.2.5.) VII. Step 4a: Council Appeals. Anyone can appeal to the Standards Council concerning procedural or substantive matters
related to the development, content, or issuance of any document of the NFPA or on matters within the purview of the authority of the Council, as established by the Bylaws and as determined by the Board of Directors. Such appeals must be in written form and filed with the Secretary of the Standards Council (see Regs at Section 1.6). Time constraints for filing an appeal must be in accordance with 1.6.2 of the Regs . Objections are deemed to be resolved if not pursued at this level. VIII. Step 4b: Document Issuance. The Standards Council is the issuer of all documents (see Article 8 of Bylaws ). The
Council acts on the issuance of a document presented for action at an NFPA Technical Meeting within 75 days from the date of the recommendation from the NFPA Technical Meeting, unless this period is extended by the Council (see Regs at 4.7.2). For documents forwarded directly to the Standards Council, the Council acts on the issuance of the document at its next scheduled meeting, or at such other meeting as the Council may determine (see Regs at 4.5.2.5 and 4.7.4). IX. Petitions to the Board of Directors. The Standards Council has been delegated the responsibility for the
administration of the codes and standards development process and the issuance of documents. However, where extraordinary circumstances requiring the intervention of the Board of Directors exist, the Board of Directors may take any action necessary to fulfill its obligations to preser ve the integrity of the codes and standards development process and to protect the interests of the NFPA. The rules for petitioning the Board of Directors can be found in the Regulations Governing Petitions to the Board of Directors from Decisions of the Standards Council and in Section 1.7 of the Regs . X. For More Information. The program for the NFPA Technical Meeting (as well as the NFPA website as information
becomes available) should be consulted for the date on which each report scheduled for consideration at the meeting will be presented. To view the First Draft Report and Second Draft Report as well as information on NFPA rules and for up-todate information on schedules and deadlines for processing NFPA documents, check the NFPA website (www.nfpa.org/ docinfo) or contact NFPA Codes & Standards Administration at (617) 984-7246.
6/16-C Copyright National Fire Protection Association Provided by IHS Markit under license with NFPA No reproduction or networking permitted without license from I HS
Licensee=Saudi Arabia-Al Khobar /3219500182, User=Mohammad, Ali khan Not for Resale, 02/13/2018 21:49:00 MST
` , , ` , ` , , ` , , ` ` , , ` ` , ` , , ` , ` , ` ` ` , , , ` ` ` , ` , , , , ` ` ` -

Nfpa 54 2015 Free Download

TRANSCRIPT

Nfpa 54 2015 Free Download For Windows 10

NfpaNfpa

Nfpa 54 2015 free. download full

  • Nfpa Lp Gas Handbook2015 NFPA 54-LP GAS CODE HANDBOOK. The 2015 NFPA 54 Handbook is your go-tosource for the 'hows' and 'whys' behind fuel gas safety compliance. The MEC LP-Gas ServiceReference Guide has been developed for use by servicemen Protecon Associaon (NFPA)pamphlets 54 and 58. MEC is not.

    NFPA 58: LP-Gas Code Handbook, 2011 Edition (NationalFire Protection Association) on Amazon.com. *FREE*shipping on qualifying offers. Hardbound, 640.This is a list of current LP-Gas items of interest for the LP-Gas industry: Or you may downloadthis Operations and Maintenance Handbook by clicking here. Requalification Policy: The 2001through 2014 Editions of NFPA 58 require. LP- Gas Code Handbook, 2008 Edition (NFPA 58)(Liquefied Petroleum) (Theodore C. Lemoff) on Amazon.com. *FREE* shipping on qualifyingoffers. Section 6.6.1.2 LP-Gas containers or systems of which they are a part shall be TheNFPA 58 Handbook offers the following information and interpretation.

    Nfpa Lp Gas Handbook>>>CLICK HERE

  • Reduce the risk of propane fires andexplosions. Order the 2011 NFPA 58Liquefied Petroleum Gas Code today! NFPA58 Handbook.Fire Safety Analysis Manual for LP Gas Storage Facilities. Fire SafetyAnalysis Neither NFPA 58 nor the Liquefied Petroleum Gas CodeHandbook 3ii Our nationwide network of nfpa 72 2010 handbook freeis devoted to giving you the ideal service. NFPA 58 LP GAS CODEHANDBOOK. Update date : 14-01. Mike Callan, one of three authors ofthe Propane Emergencies handbook, says Did you know: NFPA reportsthat about 35 percent of home fires are started. This Sponsor Handbookcontains all you need to know to make your LP Gas Service as outlinedin the International Fuel Gas Code, NFPA 58 and NFPA 54. Service andrepair of portable propane gas cylinders (i.e., grill tanks). PERC'sPropane Regulatory Compliance Program provides information onfederal DOT. NFPA 54: National Fuel Gas Code, 2015 Edition NFPA70E: Handbook for Electrical Safety in the Workplace, 2015 Editiontoday's criteria for all aspects of the safe design, construction,installation and operation of the full range of LP-Gas.

    NFPA 70E: Handbook for Electrical Safety in the Workplace, 2015Edition. List Price $189.95 2014 NFPA 58 LP-Gas Code Handbook.List Price $169.95

    NFPA 90A: Standard for the Installation of Air-Conditioning andVentilating Systems. Quick View LP-Gas Code Handbook $114.00. Addto Compare.

    district meetings of the Alabama Propane Gas Association The 2011

  • NFPA 58 HANDBOOK states the Alabama LP Gas Board, the 2011edition of NFPA 58.

    NFPA. Liquefied Petroleum Gas Code. Handbook. A book filled withthe complete NFPA 58. LP-Gas Code. Ch. 7 Building or StructuresHousing LP-Gas.

    used for natural gas & propane installations. g. p p g. p p First recognizedby NFPA 54 (Nat'l Fuel Gas Code) i 1988 n 1988. Handbook SanFrancisco CA. NFPA 13: Automatic Sprinkler Systems Handbook, 2013,2010 and 2007 NFPA 58: LP-Gas Code Handbook, 2014, 2011 and2008 Editions, NFPA 54:. LPG or LPG stands for Liquefied Petroleum.Gas. It is the term widely used to describe a family of (C4H10). Othermembers of the LP Gas family From AGA Gas Engineers Handbook. -42 by the recent version of NFPA 58, published. NFPA 58. In the 2001edition, a FSA was required for all propane storage plants with capacitiesof Operations and Maintenance Handbook on August 5th.

    NEC Handbook NFPA 70E: Electrical NFPA 70E Handbook NFPA 25: Utility Gas Plants NFPA 59, Utility LP-Gas Plant Code,National Fuel Gas Code $80.95. $85.95. NFPA-58A. LP GAS CODEHANDBOOK 2008 Ed. $210.00. $240.00. NPGA-0017. IMPORTANTPROPANE SAFETY INFORMATION for USERS. October 2, 2014.The information contained in this Handbook is based primarily. 2012International Residential Code and NFPA 58. It is intended.

    >>>CLICK HERE